Preface; Subsequent to the analysis in the body of this report metallurgical developments indicated that it would not be feasible to build the APPR-1 Core II with the increased boron loading specified herein. At the time of the issuance of this report the Core II boron loading is to be the same as that for Core I. At the time of procurement of the core in the fall, if metallurgical developments warrant, the increased boron loading will be employed. The loading discussed in the body of the report and the first three appendices is that designed to meet the specifications …
continued below
We've identified this
report
as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.
Provided By
UNT Libraries Government Documents Department
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Added Title:
U.S. Atomic Energy Commission Report APAE-32
Description
Preface; Subsequent to the analysis in the body of this report metallurgical developments indicated that it would not be feasible to build the APPR-1 Core II with the increased boron loading specified herein. At the time of the issuance of this report the Core II boron loading is to be the same as that for Core I. At the time of procurement of the core in the fall, if metallurgical developments warrant, the increased boron loading will be employed. The loading discussed in the body of the report and the first three appendices is that designed to meet the specifications outlined in the introduction. Appendix IV discusses changes in the loading to account for the various methods of employing boron.
Physical Description
116 pages ; illustrations.
Notes
Digitized from microopaque cards.
Contract No. AT (30-3)-278
Includes bibliographic references (pages 115-116).
This report is part of the following collections of related materials.
Technical Report Archive and Image Library
The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.
Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).
Williamson, T. G.; Leibson, M. J. & Bryne, B. J.Reactor Analysis APPR-1 Core II,
report,
July 15, 1958;
Schenectady, New York..
(https://digital.library.unt.edu/ark:/67531/metadc1201940/:
accessed October 13, 2024),
University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.