Mechanical, Fluid Flow, and Heat Transfer Out-Of-Pile Tests on EVESR MKI Prototype Fuel Bundle

One of 93 reports in the series: AEC Research and Development Report available on this site.

PDF Version Also Available for Download.

Description

Summary: An EVESR MKI prototype fuel bundle was fully instrumented and operated intermittently for a 5-month period at the Pacific Gas and Electric Company’s Moss Landing Power Station. The vessel was operated up to 1000 psi with steam flows from 3000 to 26,600 lb/h, and steam inlet temperatures up to 825 degrees F. Data was recorded for blowout, vibration, flow distribution, heat transfer and pressure drop. The mechanical integrity of the fuel bundle, riser, and jumper system was satisfactory and considered to be of adequate design. No significant vibrations were noted during the various phases of operation. Average flow distribution … continued below

Physical Description

100 pages ; illustrations

Creation Information

Polomik, E. E.; Fritz, J. R. & Ianni, P. W. February 1964.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 49 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

Description

Summary: An EVESR MKI prototype fuel bundle was fully instrumented and operated intermittently for a 5-month period at the Pacific Gas and Electric Company’s Moss Landing Power Station. The vessel was operated up to 1000 psi with steam flows from 3000 to 26,600 lb/h, and steam inlet temperatures up to 825 degrees F. Data was recorded for blowout, vibration, flow distribution, heat transfer and pressure drop. The mechanical integrity of the fuel bundle, riser, and jumper system was satisfactory and considered to be of adequate design. No significant vibrations were noted during the various phases of operation. Average flow distribution in three of the inner tubes showed an average variation of 5 percent from equal distribution. The center and corner tubes were low and the side tube was high. Maximum deviation, from an equal one, measured 12 percent. Blowout of the flooded fuel bundle was accomplished with dry or significantly wet 1000 psia inlet steam, that steadied out to a minimum flow of 1250 lb/h. Blowout times were estimated at less than a minute for all flows above 1250 lb/h, and times in the vicinity of 2000 lb/h were estimated to be in the order of 5 to 15 seconds. Once the bundle was blown out a flow of 700 lb/h was sufficient to keep the fuel passages clear. This was true even with steam estimated at 10 to 20 percent wet. Flows below 1250 lb/h caused partial blowout. Usually the A tube blew out first and the B and C tubes gradually cleared as flow was increased. Los of flow then caused comparatively sudden flooding ranging from less than 2 to 3 seconds to several minutes for the different tubes within the bundle. Once the bundle was blown out and the flow maintained at more than 700 lb/h, not enough was accumulated – even with very wet steam – to cause sudden flooding of all tubes when flow was cut off. Sudden flooding (i.e., in less than 2 to 3 seconds) occurred only in some tubes within the bundle, while others required times in the order of minutes to flood completely. Heat transfer across the rise steam gap was found to be 12 to 30 times that calculated for a stagnant steam annulus. These results are consistent with estimates of increased heat transfer due to wire wrapping in and annulus and steam circulation. Radial wall temperature drops, at the top and bottom of the rise, varied from 10 to 30 degrees F. Pressure drop data and curves are presented for various segments of the fuel bundle and rise system. Total pressure drop was about 20 percent higher than estimated for saturated steam and was found to vary with the second power of the mass flow, indicating the strong effect of the expansion, contraction, and turn losses.

Physical Description

100 pages ; illustrations

Notes

Digitized from microopaque cards.

U.S. Atomic Energy Commission Contract AT(04-3)-189 Project Agreement 29.

Includes bibliographic references (page 1).

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: GEAP-4560
  • Grant Number: AT(04-3)-189 PA 29
  • SuDoc Number: Y 3.At 7:22/GEAP-4560
  • Accession or Local Control No: metadc1201426
  • Archival Resource Key: ark:/67531/metadc1201426

Collections

This report is part of the following collections of related materials.

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

TRAIL Microcard Collection

Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • February 1964

Added to The UNT Digital Library

  • Aug. 15, 2019, 10:26 p.m.

Description Last Updated

  • Sept. 15, 2023, 1:21 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 49

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Polomik, E. E.; Fritz, J. R. & Ianni, P. W. Mechanical, Fluid Flow, and Heat Transfer Out-Of-Pile Tests on EVESR MKI Prototype Fuel Bundle, report, February 1964; San Jose, California. (https://digital.library.unt.edu/ark:/67531/metadc1201426/: accessed February 6, 2026), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen