High Power Density Development Project: Fourteenth Quarterly Progress Report, July-September 1963

One of 94 reports in the series: AEC Research and Development Report available on this site.

PDF Version Also Available for Download.

Description

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development. The number of assemblies has been reduced to seven as a result of the failure of two pellet fuel assemblies. The average burnup of the group operating as of September 1 is 7500 MWD/T. (2) Task 1B-Fuel Fabrication Development. Assembly. Assembly 12S gave positive signals of being a leaker under the multi-type in-core sampler and was declared failed based on the in-core … continued below

Physical Description

v, 58 pages ; illustrations.

Creation Information

Holladay, R. L. October 1963.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 22 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Compiler

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

Description

Development of nuclear reactor cores having high power density, long fuel life, and low fabrication costs is the objective of this program sponsored by the AEC. Five tasks are in progress: (1) Task 1A-High Power Density Fuel Development. The number of assemblies has been reduced to seven as a result of the failure of two pellet fuel assemblies. The average burnup of the group operating as of September 1 is 7500 MWD/T. (2) Task 1B-Fuel Fabrication Development. Assembly. Assembly 12S gave positive signals of being a leaker under the multi-type in-core sampler and was declared failed based on the in-core results and visual observation of a cracked rod. Modifications to the instrumented fuel assembly probes were made by removing the failed flow meter rotors to allow continued use of the flux detectors and thermocouples. Flux detectors and thermocouples performed properly after reactor start up. Flux wire tubes were found to be kinked such that their use was prohibited. (3) Task II-Stability, Heat Transfer and Fluid Flow. A series of noise recordings of fluxes, flows, and temperatures has been made at 91 MWt at the Big Rock Point plant. Preliminary analyses of some of the these records were made to obtain noise amplitude as a function of frequency. Thermocouple response tests were performed to verify the temperature measurement obtained during the steady-state noise tests at Big Rock. (4) Task III-Physics Development. Plans for achieving optimum performance from the Big Rock plant are being based on the concept of maintaining a fixed power shape throughout each operating cycle. The desired shape for the present cycle has been computed. Methods of selecting control rod patterns to maintain this shape are being investigated for use in the on-line computer. The computer was put on line during plant startup in August, and is presently performing satisfactorily, with the loss of only a few calculational cycles occurring through the end of the report period. (5) Task IV-Co-Ordination and Test Planning. Eight developmental fuel assemblies were delivered to the site, installed, and verified; and three instrumented assemblies were modified and installed in the Big Rock Point core during the quarter. Re-evaluation and verification of the operating limits for the Phase I tests is being made, based on more precise power distributions fro the gamma scan tests performed last spring.

Physical Description

v, 58 pages ; illustrations.

Notes

Digitized from microopaque cards.

Prepared under USAEC Contract AT(04-3)-361.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: GEAP-4391
  • Grant Number: AT(04-3)-361
  • SuDoc Number: Y 3.At 7:22/GEAP-4391
  • Accession or Local Control No: metadc1201394
  • Archival Resource Key: ark:/67531/metadc1201394

Collections

This report is part of the following collections of related materials.

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

TRAIL Microcard Collection

Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • October 1963

Coverage Date

Added to The UNT Digital Library

  • Aug. 15, 2019, 10:26 p.m.

Description Last Updated

  • June 11, 2020, 11:42 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 22

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Holladay, R. L. High Power Density Development Project: Fourteenth Quarterly Progress Report, July-September 1963, report, October 1963; San Jose, California.. (https://digital.library.unt.edu/ark:/67531/metadc1201394/: accessed September 9, 2026), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen