A Program of Two-Phase Flow Investigation Quarterly Report: First Quarterly Report, March-June, 1963

One of 3 reports in the title: Program of Two-Phase Flow Investigation Quarterly Report available on this site.

PDF Version Also Available for Download.

Description

Task A: Modification and Preparation of Experimental Facility. Facility engineering and layout is about seventy-five percent complete. Task B: Design and Construction of Test Sections. The major dimensions and characteristics of the metal and glass test sections have been calculated. One feasibility test of the electrically conducting coating on samples of glass tubing has been completed. Task C: Design and Construction of Test Stand, Task E: Pressure and Temperature Instrumentation for Test Section and Task F: Power Supply for Test Section. Preliminary engineering has been initiated on these tasks. The planned approach has been defined in each case. For Task … continued below

Physical Description

iii, 50 pages.

Creation Information

Staub, F. W. & Zuber, N. June 24, 1963.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 28 times. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

Description

Task A: Modification and Preparation of Experimental Facility. Facility engineering and layout is about seventy-five percent complete. Task B: Design and Construction of Test Sections. The major dimensions and characteristics of the metal and glass test sections have been calculated. One feasibility test of the electrically conducting coating on samples of glass tubing has been completed. Task C: Design and Construction of Test Stand, Task E: Pressure and Temperature Instrumentation for Test Section and Task F: Power Supply for Test Section. Preliminary engineering has been initiated on these tasks. The planned approach has been defined in each case. For Task E the transducer specifications have been defined and quotations on and/or sample units of the transducers have been requested. Tasks C and F can proceed with detailing as soon as drafting on Task B is about 50 percent complete. This point is scheduled to be reached during the first part of July. Task D: Void Fraction Instrumentation. The requirements for the x-ray instrumentation have been considered in the course of Task B and the x-ray power supply is presently on hand. The detailed engineering effort on this task is not scheduled to begin before July.

Physical Description

iii, 50 pages.

Notes

Digitized from microopaque cards.

Prepared under U.S. Atomic Energy Commission Contract AT(04-3)-189 Project Agreement 35 for the Joint US-EURATOM Joint Research and Development Program.

Includes bibliographic references (page 50).

Subjects

Library of Congress Subject Headings

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: GEAP-4251
  • Grant Number: AT(04-3)-189 PA 35
  • SuDoc Number: Y 3.At 7:22/GEAP-4251
  • Accession or Local Control No: metadc1201352
  • Archival Resource Key: ark:/67531/metadc1201352

Collections

This report is part of the following collections of related materials.

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

TRAIL Microcard Collection

Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 24, 1963

Coverage Date

Added to The UNT Digital Library

  • Aug. 15, 2019, 10:26 p.m.

Description Last Updated

  • May 21, 2020, 12:55 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 28

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Staub, F. W. & Zuber, N. A Program of Two-Phase Flow Investigation Quarterly Report: First Quarterly Report, March-June, 1963, report, June 24, 1963; San Jose, California.. (https://digital.library.unt.edu/ark:/67531/metadc1201352/: accessed September 7, 2026), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen