Electromagnetic Research Division Quarterly Progress Report, Part I for Period Ending March 31, 1952

One of 3 reports in the title: Electromagnetic Research Division Quarterly Progress Report available on this site.

PDF Version Also Available for Download.

Description

From abstract: "Relocation of the ion source in the 86-inch cyclotron has increased the available beam energy substantially. Modifications have also been made to permit the use of targets of 100 square inches. Proton currents of one milliampere can now be obtained readily at ~24 Mev. The 63-inch cyclotron has been completely assembled and checked. In rf tests a 75 kv dee-to-dee voltage has been maintained, under vacuum, for long periods without evidences of failures, thus exceeding the 60 kv design specification. In an investigation of proton beam distribution on the 22-inch cyclotron it has been shown that almost all … continued below

Physical Description

31 pages : illustrations

Creation Information

Livingston, Robert S. 1952.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by the UNT Libraries Government Documents Department to the UNT Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

Description

From abstract: "Relocation of the ion source in the 86-inch cyclotron has increased the available beam energy substantially. Modifications have also been made to permit the use of targets of 100 square inches. Proton currents of one milliampere can now be obtained readily at ~24 Mev. The 63-inch cyclotron has been completely assembled and checked. In rf tests a 75 kv dee-to-dee voltage has been maintained, under vacuum, for long periods without evidences of failures, thus exceeding the 60 kv design specification. In an investigation of proton beam distribution on the 22-inch cyclotron it has been shown that almost all of the loss of protons form the beam occurs within one-half of the maximum radius. The ration of H3+ to H1+ ions in the beam increases at lower at lower arc intensities in the ion source. Accelerated corrosion was found in an Inconel tube containing #14 eutectic (ARE) after a six-hour bombardment with 20 Mev protons at 4,500 watts/cc. Installation of facilities for the preparation of plutonium isotopes is nearing completion; preliminary tests are being made."

Physical Description

31 pages : illustrations

Notes

Digitized from microopaque cards.

"Subject Category: Particle Accelerators and High-Voltage Machines."

Subjects

Library of Congress Subject Headings

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: ORNL-1339
  • SuDoc Number: Y 3.At 7:22/ORNL-1339
  • Grant Number: W-7405-eng-26
  • Accession or Local Control No: metadc1201256
  • Archival Resource Key: ark:/67531/metadc1201256

Collections

This report is part of the following collections of related materials.

Technical Report Archive and Image Library

The Technical Report Archive & Image Library (TRAIL) identifies, acquires, catalogs, digitizes and provides unrestricted access to U.S. government agency technical reports. The mission of TRAIL is to ensure preservation, discoverability, and persistent open access to government technical publications regardless of form or format.

TRAIL Microcard Collection

Imaged from microcard, these technical reports describe research performed for U.S. government agencies from the 1930s to the 1960s. The reports were provided by the Technical Report Archive and Image Library (TRAIL).

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • 1952

Coverage Date

Added to The UNT Digital Library

  • April 8, 2019, 4 p.m.

Description Last Updated

  • July 14, 2020, 2:45 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 9

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Livingston, Robert S. Electromagnetic Research Division Quarterly Progress Report, Part I for Period Ending March 31, 1952, report, 1952; Oak Ridge, Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc1201256/: accessed November 13, 2025), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

Back to Top of Screen