This edition of the WGSP status report summarizes September 1978 progress of the government-sponsored projects directed towards increasing gas production from the low-permeability gas sands of the western United States. Background information is provided in the September 1977 Status Report, NVO/0655-100. The Williston Basin Symposium was held in Billings, Montana, the 24th through the 27th of September 1978. The USGS continued work on characterization and assessment of the resource in the four primary study areas and completed the 1978 field work in the Sand Wash and Green River Basins. CER Corporation is evaluating a Twin Arrow drill site, located on …
continued below
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
This edition of the WGSP status report summarizes September 1978 progress of the government-sponsored projects directed towards increasing gas production from the low-permeability gas sands of the western United States. Background information is provided in the September 1977 Status Report, NVO/0655-100. The Williston Basin Symposium was held in Billings, Montana, the 24th through the 27th of September 1978. The USGS continued work on characterization and assessment of the resource in the four primary study areas and completed the 1978 field work in the Sand Wash and Green River Basins. CER Corporation is evaluating a Twin Arrow drill site, located on the Douglas Creek Arch for the possibility of obtaining core, and preparations are being made for the Logging Program meeting to be held at the CER offices the latter part of October, 1978. The design phase for the pressure coring system has been completed and work is progressing on the fabrication and testing of the improved system. The National Laboratories and Energy Technology Centers continued work on mathematical model development, new tools and instrumentation systems, data analysis techniques and rock mechanics. Work continued on the field tests and demonstrations aspect of the WGSP. Bids sent to several service companies by Mitchell Energy Corporation, for a massive fracture treatment, are due back in October and the treatment is expected to be performed in mid-November. Mobil Research and Development fractured Zone 8 of their PCU 31-13 well, then shut it in due to anticipated winter weather and work was started on Zone 9. Sandia's mineback program involved evaluation of the Hole No. 6 Formation Interface Fracture Experiment.
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.