VTE Pilot Plant Annual Report for the Period Ending July 1, 1968

One of 197 reports in the series: Office of Saline Water Reports available on this site.

PDF Version Also Available for Download.

Description

From Summary and Conclusions: "After a period of tests at the Oak Ridge National Laboratory in 1966 and 1967, the Vertical Tube Evaporator (VTE) Pilot Plant was moved to the OSW's East Coast Test Station at Wrightsville Beach, N.C. In the summer of 1967 it was installed and was started in upflow operation with seawater feed, using stem and other services provided by the station. The operation of the Pilot Plant at Wrightsville Beach was performed by Stearns-Roger Corporation under subcontract to ORNL. Operation was in the upflow mode during the entire reporting period."

Physical Description

78 p. : ill.

Creation Information

Hill, John W. & Hise, Eugene C. December 1970.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 121 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Other

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

  • Main Title: VTE Pilot Plant Annual Report for the Period Ending July 1, 1968
  • Added Title: Research and Development Progress Report No. 646
  • Series Title: Office of Saline Water Reports

Description

From Summary and Conclusions: "After a period of tests at the Oak Ridge National Laboratory in 1966 and 1967, the Vertical Tube Evaporator (VTE) Pilot Plant was moved to the OSW's East Coast Test Station at Wrightsville Beach, N.C. In the summer of 1967 it was installed and was started in upflow operation with seawater feed, using stem and other services provided by the station. The operation of the Pilot Plant at Wrightsville Beach was performed by Stearns-Roger Corporation under subcontract to ORNL. Operation was in the upflow mode during the entire reporting period."

Physical Description

78 p. : ill.

Notes

"United States Department of the Interior." "By Oak Ridge National Laboratory, Oak Ridge, Tennesseeā€¦for the Office of Saline Water." "Contract No. 14-30-2535."

Language

Item Type

Collections

This report is part of the following collection of related materials.

Technical Report Archive and Image Library

This selection of materials from the Technical Report Archive and Image Library (TRAIL) includes hard-to-find reports published by various government agencies. The technical publications contain reports, images, and technical descriptions of research performed for U.S. government agencies. Topics range from mining, desalination, and radiation to broader physics, biology, and chemistry studies. Some reports include maps, foldouts, blueprints, and other oversize materials.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • December 1970

Start & End Dates

  • 1966 - July 1, 1968

Added to The UNT Digital Library

  • Feb. 21, 2010, 11:09 p.m.

Description Last Updated

  • Feb. 22, 2017, 9:50 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 2
Total Uses: 121

Where

Geographical information about where this report originated or about its content.

Map Information

  • map marker Automatically generated Place Name coordinates.
  • map marker Automatically generated Publication Place coordinates.
  • Repositioning map may be required for optimal printing.

Mapped Locations

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Hill, John W. & Hise, Eugene C. VTE Pilot Plant Annual Report for the Period Ending July 1, 1968, report, December 1970; Washington D.C.. (digital.library.unt.edu/ark:/67531/metadc11769/: accessed November 23, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.