Multiple Phase Ejector Pilot Plant

One of 197 reports in the series: Office of Saline Water Reports available on this site.

PDF Version Also Available for Download.

Description

From Introduction: "This is the final report on work performed by Joseph Kaye & Company, Inc. (JKCo) in accordance with the requirements of OSW Contract No. 14-01-0001-2105, as amended. The work concerned the final design, construction, and operation of a pilot plant for demonstrating Multiple Phase Ejector (MPE) topping units to augment the performance of distillation desalination systems."

Physical Description

76 p. : ill.

Creation Information

Leigh, John H. June 1970.

Context

This report is part of the collection entitled: Technical Report Archive and Image Library and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 113 times . More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Publisher

Audiences

We've identified this report as a primary source within our collections. Researchers, educators, and students may find this report useful in their work.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Titles

  • Main Title: Multiple Phase Ejector Pilot Plant
  • Added Title: Research and Development Progress Report No. 578
  • Series Title: Office of Saline Water Reports

Description

From Introduction: "This is the final report on work performed by Joseph Kaye & Company, Inc. (JKCo) in accordance with the requirements of OSW Contract No. 14-01-0001-2105, as amended. The work concerned the final design, construction, and operation of a pilot plant for demonstrating Multiple Phase Ejector (MPE) topping units to augment the performance of distillation desalination systems."

Physical Description

76 p. : ill.

Notes

"United States Department of the Interior." "By John H. Leigh, Joseph Kaye & Company, Inc., for Office of Saline Water." "Contract No. 14-01-0001-2105."

Subjects

Keywords

Language

Item Type

Collections

This report is part of the following collection of related materials.

Technical Report Archive and Image Library

This selection of materials from the Technical Report Archive and Image Library (TRAIL) includes hard-to-find reports published by various government agencies. The technical publications contain reports, images, and technical descriptions of research performed for U.S. government agencies. Topics range from mining, desalination, and radiation to broader physics, biology, and chemistry studies. Some reports include maps, foldouts, blueprints, and other oversize materials.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • June 1970

Added to The UNT Digital Library

  • Feb. 21, 2010, 11:09 p.m.

Description Last Updated

  • Nov. 17, 2016, 10:13 a.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 3
Total Uses: 113

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Leigh, John H. Multiple Phase Ejector Pilot Plant, report, June 1970; Washington D.C.. (digital.library.unt.edu/ark:/67531/metadc11749/: accessed September 25, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.