Design and construction of the Tritium Systems Test Assembly

PDF Version Also Available for Download.

Description

The objective of TSTA is to develop those aspects of tritium technology related to the fuel cycle for fusion power reactors and to develop the environmental and personnel safety systems required for such a tritium facility. The TSTA schedule calls for construction to be completed and the facility to be operational by the end of FY-1981. The project is now somewhat more than halfway through the design-construction phase and is currently on schedule for the 1981 operational milestone. In this paper the current status of the major subsystems will be discussed. The subsystems to be discussed include the: Vacuum Facility; ... continued below

Physical Description

Pages: 7

Creation Information

Anderson, J.L. January 1, 1980.

Context

This article is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this article can be viewed below.

Who

People and organizations associated with either the creation of this article or its content.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this article. Follow the links below to find similar items on the Digital Library.

Description

The objective of TSTA is to develop those aspects of tritium technology related to the fuel cycle for fusion power reactors and to develop the environmental and personnel safety systems required for such a tritium facility. The TSTA schedule calls for construction to be completed and the facility to be operational by the end of FY-1981. The project is now somewhat more than halfway through the design-construction phase and is currently on schedule for the 1981 operational milestone. In this paper the current status of the major subsystems will be discussed. The subsystems to be discussed include the: Vacuum Facility; Fuel Cleanup; Isotope Separation; Transfer Pump; Emergency Tritium Cleanup; Tritium Waste Treatment; Tritium Monitoring; Secondary Containment; and, the Master Data Acquisition and Control System.

Physical Description

Pages: 7

Notes

NTIS, PC A02/MF A01.

Source

  • Tritium technology in fission, fusion, and isotopic application, Dayton, OH, USA, 29 Apr 1980

Language

Item Type

Identifier

Unique identifying numbers for this article in the Digital Library or other systems.

  • Report No.: LA-UR-80-1203
  • Report No.: CONF-800427-6
  • Grant Number: W-7405-ENG-36
  • Office of Scientific & Technical Information Report Number: 5466558
  • Archival Resource Key: ark:/67531/metadc1093071

Collections

This article is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this article?

When

Dates and time periods associated with this article.

Creation Date

  • January 1, 1980

Added to The UNT Digital Library

  • Feb. 10, 2018, 10:06 p.m.

Description Last Updated

  • Feb. 21, 2018, 8:05 p.m.

Usage Statistics

When was this article last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Article

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Anderson, J.L. Design and construction of the Tritium Systems Test Assembly, article, January 1, 1980; United States. (digital.library.unt.edu/ark:/67531/metadc1093071/: accessed April 22, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.