Routine reactor operation with four end-of-cycle shutdowns and one scheduled midcycle shutdown resulted in an on-stream time of 93.6% for the quarter. This gave the HFIR an on-stream time for the year of 91.3%. The outer control plates were replaced, and the annual core components inspection was made.
Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.
Descriptive information to help identify this report.
Follow the links below to find similar items on the Digital Library.
Description
Routine reactor operation with four end-of-cycle shutdowns and one scheduled midcycle shutdown resulted in an on-stream time of 93.6% for the quarter. This gave the HFIR an on-stream time for the year of 91.3%. The outer control plates were replaced, and the annual core components inspection was made.
This report is part of the following collection of related materials.
Office of Scientific & Technical Information Technical Reports
Reports, articles and other documents harvested from the Office of Scientific and Technical Information.
Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.
Corbett, B.L. & Poteet, K.H.High Flux Isotope Reactor. Quarterly report, October, November, and December 1979,
report,
August 1, 1980;
Tennessee.
(digital.library.unt.edu/ark:/67531/metadc1058486/:
accessed April 25, 2018),
University of North Texas Libraries, Digital Library, digital.library.unt.edu;
crediting UNT Libraries Government Documents Department.