Industrial Fuel Gas Demonstration Plant Program. Procurement schedule for long-lead items (Deliverable No. 48)

PDF Version Also Available for Download.

Description

The long-lead items required for the Industrial Fuel Gas Demonstration Plant are given. Utilizing the Construction Plan (Deliverable No. 37), which is based upon 48 months to the completion of Phase II, the delivery requirements for each equipment item were determined. Required delivery dates were ascertained from the erection sequence for IFG Demonstration Plant units and equipment items. Lead times established by FWEC procurement personnel were then applied to arrive at a date when procurement action must be initiated. Procurement schedules for all equipment items are included in this document. Also evaluated were the activities required prior to actual placement ... continued below

Physical Description

Pages: 138

Creation Information

Creator: Unknown. January 1, 1979.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Publishers

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The long-lead items required for the Industrial Fuel Gas Demonstration Plant are given. Utilizing the Construction Plan (Deliverable No. 37), which is based upon 48 months to the completion of Phase II, the delivery requirements for each equipment item were determined. Required delivery dates were ascertained from the erection sequence for IFG Demonstration Plant units and equipment items. Lead times established by FWEC procurement personnel were then applied to arrive at a date when procurement action must be initiated. Procurement schedules for all equipment items are included in this document. Also evaluated were the activities required prior to actual placement of the order. Appropriate time has been included at the front end for receipt of vendor quotes, evaluation, and the recommendation for award to DOE and DOE approval (if required). The first milestone indicated on these schedules is the issuance of bid packages to prospective vendors. This is the required month to begin procurement activities to maintain the program time table. Six items have been determined to be long-lead time procurement items. The complete engineering, drafting, and procurement schedules for such items can be determined by referring to respective equipment numbers on the enclosed schedules.

Physical Description

Pages: 138

Notes

NTIS, PC A07/MF A01.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: DOE/ET/13046-T72
  • Grant Number: AC02-77ET13046
  • DOI: 10.2172/5045876 | External Link
  • Office of Scientific & Technical Information Report Number: 5045876
  • Archival Resource Key: ark:/67531/metadc1057130

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • January 1, 1979

Added to The UNT Digital Library

  • Jan. 22, 2018, 7:23 a.m.

Description Last Updated

  • Jan. 25, 2018, 4:29 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Industrial Fuel Gas Demonstration Plant Program. Procurement schedule for long-lead items (Deliverable No. 48), report, January 1, 1979; United States. (digital.library.unt.edu/ark:/67531/metadc1057130/: accessed August 14, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.