Industrial Fuel Gas Demonstration Plant Program. Monthly and quarterly progress report, 1 April 1978-30 June 1978 (Deliverable No. 12)

PDF Version Also Available for Download.

Description

The design of the commercial plant was completed and a cost estimate prepared. Most work remaining on Task I relates to: Demonstration Plant recommendations and includes a configuration study, at DOE's request, to evaluate alternatives for the Demo Plant Configuration to achieve the required reliability. The specific alternatives being considered are: A base U-Gas Plant designed to produce 50 MMM Btu/day 365 days per year (the High Reliability case); a base U-Gas Plant plus product storage; and a base U-Gas Plant, plus a small methanation facility to upgrade a small portion of the product to obtain credits. Other studies in ... continued below

Physical Description

Pages: 92

Creation Information

Creator: Unknown. July 1, 1978.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Creator

  • We've been unable to identify the creator(s) of this report.

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The design of the commercial plant was completed and a cost estimate prepared. Most work remaining on Task I relates to: Demonstration Plant recommendations and includes a configuration study, at DOE's request, to evaluate alternatives for the Demo Plant Configuration to achieve the required reliability. The specific alternatives being considered are: A base U-Gas Plant designed to produce 50 MMM Btu/day 365 days per year (the High Reliability case); a base U-Gas Plant plus product storage; and a base U-Gas Plant, plus a small methanation facility to upgrade a small portion of the product to obtain credits. Other studies in support of the demonstration plant recommendations include: economic study of U-Gas versus coal-fired boilers for internal steam generation; an assessment of the cost/benefit of designing the Demo Plant for an operating pressure higher than the current data allows; and evaluation of the costs of providing a zero discharge wastewater treatment system.

Physical Description

Pages: 92

Notes

NTIS, PC A05/MF A01.

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: DOE/ET/13046-T61
  • Grant Number: AC02-77ET13046
  • DOI: 10.2172/5120541 | External Link
  • Office of Scientific & Technical Information Report Number: 5120541
  • Archival Resource Key: ark:/67531/metadc1056797

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • July 1, 1978

Added to The UNT Digital Library

  • Jan. 22, 2018, 7:23 a.m.

Description Last Updated

  • Jan. 25, 2018, 4:29 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Industrial Fuel Gas Demonstration Plant Program. Monthly and quarterly progress report, 1 April 1978-30 June 1978 (Deliverable No. 12), report, July 1, 1978; United States. (digital.library.unt.edu/ark:/67531/metadc1056797/: accessed November 20, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.