REACTOR PRIMARY COOLANT SYSTEM RUPTURE STUDY. Progress Report No. 26, October 1971--March 1972. Page: 52 of 80
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to UNT Digital Library by the UNT Libraries Government Documents Department.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Table 5-4C
FATIGUE TEST RESULTS FROM DRESDEN LOOP (OPERATING PERIOD 111)Material
Shakedown
Surface
Strain
Range*Loading
Mode**Test
Condition
Code***'Carbcn Steel
Type-304 SS
Carbcn Steel
Type-304L SS
Caroxxn Steel
Caron Steel
Ty pe-304 SS
Type-304 SS
Type-304L SS
Type-304 SS
Carbo- Steel
Type-304L SS
Type-304L SS
Type-304L SS
Type-304L SS
Typ--304 SS
Type-304 SS
Type-304 SS0.75%
0.5%
0.5%
0.5%
0.5%
0.5%
0.75%
1.0%
0.5
0.75%
0.5%
1.0%
0.5%
0.5%
1.0%
0.75%
1.0%
1.0%C-T
C-T
C-T
C-T
C-T
C-T
C-T
C-T
C-T
0-T
C-T
C-T
C-T
C-T
C-T
0-T
C-T
C-T28
9
18
2;6
28
e.
1E
11
26
15
20
20
15
11
1
7Welded, no stress relief
As received, furnace sensitized
mechanical notch
As machined, stress relieved
As received, furnace sensitized
As machined, no stress relief
Welded, no stress relief
Dresden equalizer line, weld
material, as machined
)resden equalizer line base
material, as machined
As received, furnace sensitized
As received
As machined, no stress relief
As received
As received, furnace sensitized,
mechanical notch
As received, furnace sensitized,
mechanical notch
As received
As received
As received
Dresden equalizer line weld
material, as machined* Based on Room Temperature Strain-Deflection CElibration Curves
** C-T = Compressicn-Tension; 0-T = Zero to Tension Loading
*** Reference: Table 5-2Specimen
NumberCycles to
FailureU,
NDescription
1058
195
82
26
81
1055
1146
1092
22
201
72
29
40
5
42
190
187
11483556
3683
37E6
3990
4007
4015
4093
4418
4724
5215
5292
5359
5435
5617
5859
5920
6110
61570.
m
0
N
0
-J
N
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
REACTOR PRIMARY COOLANT SYSTEM RUPTURE STUDY. Progress Report No. 26, October 1971--March 1972., report, January 1, 1972; San Jose, California. (https://digital.library.unt.edu/ark:/67531/metadc1028410/m1/52/: accessed April 24, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.