PRELIMINARY DESIGN REQUIREMENTS ARGONNE BOILING REACTOR (ARBOR) FACILITY. Revision I Page: 29 of 161

27
Additionally, a number of mechanical or electronic circuits
will be provided at the Jack Board to perform operations such as addition,
subtraction, multiplication and division of the various input signals with
each other or with selected constants. A function generator will also be
located at the Jack Board to provide desired signals which vary with time
or with one of the other input signals in order to impose desired variable
control of selected parameters.
The Jack Board will permit experimentation with a large
number of boiling reactor control systems and a large number of boiling
reactor operating cycles by merely connecting the proper signals to the
desired controllers and manually adjusting gain and set points.

Upcoming Pages

Here’s what’s next.

upcoming item: 30 30 of 161
upcoming item: 31 31 of 161
upcoming item: 32 32 of 161
upcoming item: 33 33 of 161

Show all pages in this report.

This report can be searched. Note: Results may vary based on the legibility of text within the document.

Tools / Downloads

Get a copy of this page .

Citing and Sharing

Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.

Reference the current page of this Report.

Fromm, L.W.; Bernsen, S.A.; Bullinger, C.F. & Matousek, J.F. PRELIMINARY DESIGN REQUIREMENTS ARGONNE BOILING REACTOR (ARBOR) FACILITY. Revision I, report, July 15, 1957; Lemont, Illinois. (https://digital.library.unt.edu/ark:/67531/metadc1023272/m1/29/ocr/: accessed April 25, 2019), University of North Texas Libraries, Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.

International Image Interoperability Framework (This Page)