Core-loading diagrams for EBR-II runs 51-67 (August 1971--December 1973). EBR-II Project

PDF Version Also Available for Download.

Description

The core-loading diagrams for EBR-II runs 51 through 67, which were made in EBR-II between August 1971 and December 1973 are presented. During those runs, the reactor accumulated 25,679 MWd of operation. (The reactor had been operated for an additional 46,863 MWd in runs 1-50, made between August 1964 and August 1971.) The loading diagrams appear in numerical, and thus chronological, order. Locations of experiments are highlighted in each diagram through the use of a black background behind the identifying numbers of the experiments. The center of the core is identified in each diagram by a circle, and the core ... continued below

Physical Description

Pages: 59

Creation Information

Case, J. C. January 1, 1974.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

The core-loading diagrams for EBR-II runs 51 through 67, which were made in EBR-II between August 1971 and December 1973 are presented. During those runs, the reactor accumulated 25,679 MWd of operation. (The reactor had been operated for an additional 46,863 MWd in runs 1-50, made between August 1964 and August 1971.) The loading diagrams appear in numerical, and thus chronological, order. Locations of experiments are highlighted in each diagram through the use of a black background behind the identifying numbers of the experiments. The center of the core is identified in each diagram by a circle, and the core sectors are identified by the letters A through F around the perimeter of the core diagram. A table at the end of the report summarizes the pertinent information for every EBR-II run through run 67. (auth)

Physical Description

Pages: 59

Notes

Dep. NTIS

Source

  • Other Information: Orig. Receipt Date: 30-JUN-74

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: ANL/EBR--79
  • Grant Number: W-31-109-ENG-38
  • DOI: 10.2172/4352980 | External Link
  • Office of Scientific & Technical Information Report Number: 4352980
  • Archival Resource Key: ark:/67531/metadc1021726

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • January 1, 1974

Added to The UNT Digital Library

  • Oct. 15, 2017, 10:09 p.m.

Description Last Updated

  • Jan. 23, 2018, 2:40 p.m.

Usage Statistics

When was this report last used?

Yesterday: 0
Past 30 days: 0
Total Uses: 7

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Case, J. C. Core-loading diagrams for EBR-II runs 51-67 (August 1971--December 1973). EBR-II Project, report, January 1, 1974; United States. (digital.library.unt.edu/ark:/67531/metadc1021726/: accessed June 25, 2018), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.