Early in the commissioning it was noticed by Cecile Limborg that the calibration of the BXS spectrometer magnet seemed to be different from the strength of the BX01/BX02 magnets. First the BX01/BX02 currents were adjusted to 135 MeV and the beam energy was adjusted to make the horizontal orbit flat. Then BX01/BX02 magnets were switched off and BXS was adjusted to make the horizontal orbit in the spectrometer line flat, without changing the energy of the beam. The result was that about 140-141 MeV were required on the BXS magnet. This measurement was repeated several times by others with the ... continued below

Physical Description

3 pages

Creation Information

Welch, J. November 24, 2010.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Author

Sponsor

Publisher

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Early in the commissioning it was noticed by Cecile Limborg that the calibration of the BXS spectrometer magnet seemed to be different from the strength of the BX01/BX02 magnets. First the BX01/BX02 currents were adjusted to 135 MeV and the beam energy was adjusted to make the horizontal orbit flat. Then BX01/BX02 magnets were switched off and BXS was adjusted to make the horizontal orbit in the spectrometer line flat, without changing the energy of the beam. The result was that about 140-141 MeV were required on the BXS magnet. This measurement was repeated several times by others with the same results. It was not clear what was causing the error: magnet strength or layout. A position error of about 19 mm of the BXS magnet could explain the difference. Because there was a significant misalignment of the vacuum chamber in the BXS line, the alignment of the whole spectrometer line was checked. The vacuum chamber was corrected, but the magnets were found to be in the proper alignment. So we were left with one (or conceivably two) magnet calibration errors. Because BXS is a wedged shaped magnet, the bend angle depends on the horizontal position of the incoming beam. As mentioned, an offset of the beam position of 19 mm would increase or decrease the bend angle roughly by the ratio of 135/141. The figure of 19 mm is special and caused a considerable confusion during the design and measurement of the BXS magnet. This is best illustrated in Figure 1 which was taken out of the BXS Traveler document. The distance between the horizontal midplanes of the poles and the apex of the beam path was chosen to be 19 mm so the beam is close to the good field region throughout its entire path. Thus it seemed possible that there was an error that resulted in the beam not being on this trajectory, or conversely, that the magnetic measurements were done on the wrong trajectory and the magnet was then mis-calibrated. Mechanical measurements of the vacuum chamber made in the tunnel indicated that the vacuum chamber was in fact in the proper position with respect to the magnet - not 19 mm off to one side - so the former possibility was discounted. Review of the Fiducial Report and an interview with Keith Caban convinced me that there was no error in the coordinate system used for magnet measurements. I went and interviewed Andrew Fischer who did the magnetic measurements of BXS. He had extensive records, including photographs of the setups and could quickly answer quite detailed questions about how the measurement was done. Before the interview, I had a suspicion there might have been a sign flip in the x coordinate which because of the wedge would result in the wrong path length and a miscalibration. Andrew was able to pin-point how this could have happened and later confirmed it by looking an measurement data from the BXG magnet done just after BXS and comparing photographs. It turned out that the sign of the horizontal stage travel that drives the measurement wire was opposite that of the x coordinate in the Traveler, and the sign difference wasn't applied to the data. The origin x = 0 was set up correctly, but the wire moved in the opposite direction to what was expected, just as if the arc had been flipped over about the origin. To quantitatively confirm that this was the cause of the observed difference in calibration I used the 'grid data', which was taken with a Hall probe on the BXS magnet originally to measure the FINT (focusing effect) term, and combined it with the Hall probe data taken on the flipped trajectory, and performed the field integral on a path that should give the same result as the design path. This is best illustrated in Figure 2. The integration path is coincident with the desired path from the pivot points (x = 0) outward. Between the pivot points the integration path is a mirror image of the design path, but because the magnet is fairly uniform, for this portion it gives the same result. Most of the calibration error resulted simply from the different path length between the design path and the measured path. The results of the integration on the equivalent path are given in Table 1. The corrected calibration has been used to generate a new polynomial for BXS which was implemented in the control system.

Physical Description

3 pages

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: SLAC-TN-10-048
  • Grant Number: AC02-76SF00515
  • DOI: 10.2172/993414 | External Link
  • Office of Scientific & Technical Information Report Number: 993414
  • Archival Resource Key: ark:/67531/metadc1014042

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • November 24, 2010

Added to The UNT Digital Library

  • Oct. 14, 2017, 8:36 a.m.

Description Last Updated

  • Oct. 24, 2017, 1:27 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Welch, J. BXS Re-calibration, report, November 24, 2010; United States. (digital.library.unt.edu/ark:/67531/metadc1014042/: accessed December 18, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.