B-Target Room Tunnel Redesigned

PDF Version Also Available for Download.

Description

Several groups at SLAC National Accelerator Laboratory are currently working on a RF Modulator prototype for a future linear collider known as the International Linear Collider (ILC). The ILC runs using about a 1000 Klystrons which create high power carrier waves for the particle acceleration. Klystrons receive their electrical input power from modulators. In order to move beyond the prototype phase, the laboratory might expand its ground base further down a tunnel located at the End Station B (ESB) in order to house four new Klystron Modulator Test Stations. This area is known as the B-Target Room Tunnel, and the ... continued below

Physical Description

19 pages

Creation Information

Esfandiari, Reza & /SLAC, /San Jose State U. August 25, 2010.

Context

This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided by UNT Libraries Government Documents Department to Digital Library, a digital repository hosted by the UNT Libraries. More information about this report can be viewed below.

Who

People and organizations associated with either the creation of this report or its content.

Provided By

UNT Libraries Government Documents Department

Serving as both a federal and a state depository library, the UNT Libraries Government Documents Department maintains millions of items in a variety of formats. The department is a member of the FDLP Content Partnerships Program and an Affiliated Archive of the National Archives.

Contact Us

What

Descriptive information to help identify this report. Follow the links below to find similar items on the Digital Library.

Description

Several groups at SLAC National Accelerator Laboratory are currently working on a RF Modulator prototype for a future linear collider known as the International Linear Collider (ILC). The ILC runs using about a 1000 Klystrons which create high power carrier waves for the particle acceleration. Klystrons receive their electrical input power from modulators. In order to move beyond the prototype phase, the laboratory might expand its ground base further down a tunnel located at the End Station B (ESB) in order to house four new Klystron Modulator Test Stations. This area is known as the B-Target Room Tunnel, and the task was to redesign the tunnel layout for the upcoming changes. The project first began by collecting substantial amount of information about the prototyped project, the tunnel and the researchers feedback of what they would like to see in the upcoming design. Subsequent to numerous planning and presentations, one particular design was. Calculations for this design were then performed for the most complex aspects of the project. Based on the results of the calculations, specific sample beams, welds, bolts and materials were chosen for the possible future construction.

Physical Description

19 pages

Language

Item Type

Identifier

Unique identifying numbers for this report in the Digital Library or other systems.

  • Report No.: SLAC-TN-10-006
  • Grant Number: AC02-76SF00515
  • DOI: 10.2172/992941 | External Link
  • Office of Scientific & Technical Information Report Number: 992941
  • Archival Resource Key: ark:/67531/metadc1012737

Collections

This report is part of the following collection of related materials.

Office of Scientific & Technical Information Technical Reports

Reports, articles and other documents harvested from the Office of Scientific and Technical Information.

Office of Scientific and Technical Information (OSTI) is the Department of Energy (DOE) office that collects, preserves, and disseminates DOE-sponsored research and development (R&D) results that are the outcomes of R&D projects or other funded activities at DOE labs and facilities nationwide and grantees at universities and other institutions.

What responsibilities do I have when using this report?

When

Dates and time periods associated with this report.

Creation Date

  • August 25, 2010

Added to The UNT Digital Library

  • Oct. 14, 2017, 8:36 a.m.

Description Last Updated

  • Nov. 2, 2017, 7:30 p.m.

Usage Statistics

When was this report last used?

Congratulations! It looks like you are the first person to view this item online.

Interact With This Report

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

Citations, Rights, Re-Use

Esfandiari, Reza & /SLAC, /San Jose State U. B-Target Room Tunnel Redesigned, report, August 25, 2010; [California]. (digital.library.unt.edu/ark:/67531/metadc1012737/: accessed November 22, 2017), University of North Texas Libraries, Digital Library, digital.library.unt.edu; crediting UNT Libraries Government Documents Department.