TABLE 15
ANNUAL FUEL CYCLE COSTS FOR THE 100 MW BWR
Fuel Cost Assumptions: Conservative
Plant Capacity Factor: 60%Thousands of Dollars
Line Item
1 Net Energy Send-Out Millions KWH
Average Heat Rate of 13,100 Btu/kwhr
2 Average Annual Cost of Fuel Cycle
Working Capital @ 5.54% of
$6,290,000
3 Other Fuel Cycle Costs, $/Yr
4 Total Annual Fuel Costs, $/Yr
5 Unit Fuel Costs, Mills/kwh
6 10-Year Average Unit Fuel Costs,
Mills/kwhNote 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979
$526
348$1367 $1367 $1367 $1261 $1267 $1320 $1335
$1677 $1715 $1715 $1715 $1609 $1615 $1668 $1683
3.26 3.26 3.26 3.06 3.07 3.17 3.20
3.19*
10-Yr Average0000,
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Kaiser Engineers. Small Nuclear Power Plants, Volume 3: A General and Economic Assessment, report, March 1967; Oak Ridge, Tennessee. (https://digital.library.unt.edu/ark:/67531/metadc100944/m1/91/: accessed March 28, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.