Upgraded Lighting System Leads to Energy and Cost Savings at Augusta Newsprint Company

Description: New metal halide light fixtures have replaced the 1960s-era mercury vapor light fixtures at Augusta Newsprint Company's facility in Augusta, Georgia. The results have included increased lighting levels, decreased maintenance costs, and reduced energy demand. Annual energy savings total nearly $65,000; with a total installed cost of $100,000, the project will pay for itself in 1.5 years.
Date: March 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Utica Corporation Plant-Wide Energy Assessment Report Final Summary

Description: Utica Corporation conducted a plant-wide energy assessment of the manufacturing processes and utilities at its facility in Whiteboro, NY. As a result of the assessment, the company is now implementing six energy conservation projects that will result in significant cost savings and efficiency improvements.
Date: March 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Appleton Papers Plant-Wide Energy Assessment Saves Energy and Reduces Waste: Office of Industrial Technologies (OIT) BestPractices Forest Products Assessment Case Study

Description: Plant-wide energy survey at the Appleton Papers, Inc. West Carrollton paper mill resulted in 21 recommendations for projects to reduce energy consumption and waste production and improve process efficiency.
Date: March 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Compressed Air System Upgrade Results in Substantial Energy Savings. Office of Industrial Technologies (OIT) BestPractices Project Case Study

Description: This case study highlights a compressed air system upgrade at BWX Technologies manufacturing plant in Lynchburg, Virginia, which replaced antiquated compressors and dryers and implemented an improved control strategy, resulting in improved energy efficiency and savings in energy and maintenance costs.
Date: January 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Compressed Air System Retrofit Increases Productivity at a Petroleum Packaging Facility.

Description: This case study highlights a compressed air improvement project implemented at the Mobil lubricating-blending plant in Vernon, California. The project reduced the plant's energy production and maintenance costs, and increased reliability due to increased efficiency of the compressed air system.
Date: January 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Georgia-Pacific Palatka Plant Uses Thermal Pinch Analysis and Evaluates Water Reduction in Plant-Wide Energy Assessment

Description: This OIT BestPractices Case Study describes the methods and results used in a plant-wide assessment at a Georgia-Pacific paper mill in Palatka, FL. Assessment personnel recommended several projects, which, if implemented, have the potential to save the plant more than 729,000 MMBtu per year and$2.9 million per year. In addition, the plant could reduce water use by 2,100 gallons per minute.
Date: December 1, 2002
Partner: UNT Libraries Government Documents Department
open access

Compressed Air System Project Improves Production at a Candy-Making Facility

Description: The H.B. Reese Company successfully completed an upgrade of this compressed air system at its facility in Hershey, PA. The plant took two compressors offline while increasing throughput and quality.
Date: March 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Compressed Air System Retrofitting Project Improves Productivity at a Foundry. Office of Industrial Technologies (OIT) Metal Casting BestPractices Project Case Study

Description: This case study highlights International Truck and Engine Corporation's optimization project on the compressed air system that serves its foundry, Indianapolis Casting Corporation. Due to the project's implementation, the system's efficiency was greatly improved, allowing the foundry to operate with less compressor capacity, which resulted in reduced energy consumption, significant maintenance savings, and more reliable production.
Date: January 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Advanced Quality Control System for the Thermomechanical Pulping Process Improves Quality and Reduces Energy Costs for Augusta Newsprint

Description: In July 2001, the Augusta Newsprint Company partnered with Invensys' Pacific Simulation group to implement an advanced quality control (AQC) solution for the thermomechanical pulping (TMP) process at Augusta Newsprint's Augusta, Georgia, site. The goal of the project is to decrease energy and raw material costs while maintaining final pulp quality. The project involves coordinating AQC in 3 areas of the paper mill to reduce the amount of energy required for manufacturing. In addition, a time-of… more
Date: February 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Akzo Nobel Morris Plant Implements a Site-Wide Energy Efficiency Plan

Description: Akzo Nobel's Surface Chemistry plant in Morris, Illinois, implemented an energy efficiency plan, which included a plant-wide energy efficiency assessment. The assessment revealed opportunities to save an estimated$1.2 million per year in operating and energy costs, reduce environmental impacts, and improve production capacity.
Date: January 1, 2003
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Fan System Optimization Improves Production and Saves Energy at Ash Grove Cement Plant

Description: This case study describes an optimization project implemented on a fan system at Ash Grove Cement Company, which led to annual energy and maintenance savings of $16,000 and 175,000 kilowatt-hours (kWh). In 1999, Ash Grove Cement Company implemented an optimization project on a fan system in its cement plant in Durkee, Oregon. Because of a severe vibration problem, the fan system would often fail and require frequent repairs to the ductwork and adjoining machinery. The plant replaced the belt dr… more
Date: May 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Metlab Plan-Wide Assessment. Office of Industrial Technologies (OIT) BestPractices Assessment Case Study

Description: This OIT BestPractices case study describes the methods and results of a plant-wide energy assessment at Metlab's aircraft component manufacturing plant in Wyndmoor, PA. Recommendations derived from the assessment, if implemented, can save an estimated $528,400 annually, reduce natural gas use by 50,070 MMbtu per year, and reduce electrical use by 329,400 kWh per year.
Date: August 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Compressed Air Project Improves Efficiency and Production at Harland Publishing Facility

Description: Case study describing a project which configured a printing machine so that it consumes less compressed air and required lower pressure to operate effectively. Project replicated throughout the company, leading to energy cost savings of $200,000 per year, or 2.9 million kilowatt-hours.
Date: May 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Optimizing Electric Motor Systems at a Corporate Campus Facility

Description: 3M conducted an in-house motor system study in 29 buildings at the 3M Center. The company evaluated approximately 1,000 electric motors and upgraded systems, resulting in reduced electricity use and cost savings of $77,554 per year.
Date: May 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Compressed Air System Upgrade Improves Production at an Automotive Glass Plant

Description: In 2000, The Visteon automotive glass plant improved its compressed air system at its automotive glass plant in Nashville, Tennessee. This improvement allowed Visteon to save $711,000 annually, reduce annual energy consumption by 7.9 million kilowatt-hours, reduce maintenance, improve system performance, and avoid $800,000 in asbestos abatement costs.
Date: February 1, 2003
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant. Office of Industrial Technologies (OIT) BestPractices Project Case Study

Description: This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.
Date: January 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Millwater Pumping System Optimization Improves Efficiency and Saves Energy at an Automotive Glass Plant

Description: In 2001, the Visteon automotive glass plant in Nashville, Tennessee renovated its millwater pumping system. This improvement saved the plant $280,000 annually in energy and operating costs, reduced annual energy consumption by 3.2 million kilowatt-hours, reduced water consumption, improved system performance, and reduced use of water treatment chemicals.
Date: March 1, 2003
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Four Equipment Upgrade Projects Reduce System Energy Losses at Augusta Newsprint

Description: Augusta Newsprint Company performed a plant-wide energy assessment that implemented four projects involving pumping systems presented in this study, which are projected to reduce energy consumption by over 5,200 megawatt hours.
Date: February 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Consolidated Compressed Air System Reduces Power Consumption and Energy Costs Office of Industrial Technologies (OIT) Forest Products BestPractices Technical Case Study

Description: Augusta Newsprint Company consolidated two compressed air systems at its facility in Augusta, GA. The results are a more streamlined system, added storage capacity, backflow prevention, and the elimination of unused equipment.
Date: April 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department
open access

Pump System Optimization Saves Energy and Improves Productivity at a Daishowa America Paper Mill

Description: Review of pumping system at paper mill led to installation of mechanical Adjustable Speed Drives on two pumps, which resulted in annual energy savings of $32,000 and 700,000 kilowatt hours.
Date: May 1, 2002
Creator: United States. Department of Energy. Office of Energy Efficiency and Renewable Energy. Office of Industrial Technologies.
Partner: UNT Libraries Government Documents Department