Determination of Burnout Limits of Polyphenyl Coolants : Summary Report

Determination of Burnout Limits of Polyphenyl Coolants : Summary Report

Date: February 14, 1958
Creator: Core, T. C. & Sato, K.
Description: Report documenting an investigation undertaken "to establish the burnout limits of a polyphenyl mixture (...), diphenyl, Santowax R, and monoisopropyl-biphanyl for various pressures, fluid velocities, and fluid temperatures" (p. 7).
Contributing Partner: UNT Libraries Government Documents Department
In-Pile Test of Prototype ML-1 Fuel Elements

In-Pile Test of Prototype ML-1 Fuel Elements

Date: June 1964
Creator: Brunhouse, J. S.; Burgess, A. B.; Geering, G. T.; Nakazato, S. & Titus, G. W.
Description: Report documenting the testing of prototype fuel elements used in a mobile nuclear power plant. Includes descriptions and evaluations of the test.
Contributing Partner: UNT Libraries Government Documents Department
Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant

Preliminary Hazards Summary Report for the ML-1 Nuclear Power Plant

Date: September 30, 1959
Creator: Linenberger, G. A.
Description: From abstract: "Neutronic characteristics, the control and instrumentation system, equipment description and plant safety considerations of the ML-1 (mobile, low power) nuclear power plant. The site is described with reference to geology, climate, and population density."
Contributing Partner: UNT Libraries Government Documents Department
High-Temperature Irradiation of UO₂-BeO Bodies

High-Temperature Irradiation of UO₂-BeO Bodies

Date: January 1963
Creator: Titus, G. W.
Description: From introduction: "Irradiation experiment performed to simulate burnup data under close to reactor temperatures."
Contributing Partner: UNT Libraries Government Documents Department
Full Power and Limited Endurance Test of the ML-1 Nuclear Power Plant (ANSOP 16625A)

Full Power and Limited Endurance Test of the ML-1 Nuclear Power Plant (ANSOP 16625A)

Date: September 1964
Creator: Aerojet-General Corporation
Description: Report presenting "[t]he results of performance analyses of the ML-1 nuclear power plant based on the test data obtained during ANSOP 16625A" (p. v).
Contributing Partner: UNT Libraries Government Documents Department
In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)

In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)

Date: July 2, 1959
Creator: Nakazato, S.; Williams, P. M. & Wilson, W. D.
Description: Report documenting two in-pile loop experiments conducted at the Battelle Research Reactor-Gas Cooled Reactor (BRR-GCR). These experiments test heat transfer calculations and the behavior of the fuel element under severe thermal-cycling conditions.
Contributing Partner: UNT Libraries Government Documents Department
The ML-1 Design Report

The ML-1 Design Report

Date: May 16, 1960
Creator: Linenberger, G. A.
Description: From abstract: "This report describes the design of the mobile nuclear power plant which is to be the prototype of a mobile, low-powered nuclear power plant intended to furnish electrical power in remote locations."
Contributing Partner: UNT Libraries Government Documents Department
In-Pile Tests of GCRE-IB Prototype Fuel Elements: Interim Report, 1958-1959

In-Pile Tests of GCRE-IB Prototype Fuel Elements: Interim Report, 1958-1959

Date: December 1960
Creator: Watanabe, H. T.; Janne, J. E. & Wilson, W. D.
Description: Interim report for the Army Gas-Cooled Reactor Systems Program, discussing various tests in a project to "develop and evaluate a ceramic-core, pin-type fuel element" (p. 1).
Contributing Partner: UNT Libraries Government Documents Department
Determination of Burnout Limits of Polyphenyl Coolants: Research and Development Report

Determination of Burnout Limits of Polyphenyl Coolants: Research and Development Report

Date: February 15, 1957
Creator: Sato, K.
Description: Abstract: An experimental investigation was conducted to establish the burnout limit of liquid diphenyl for various flow conditions.
Contributing Partner: UNT Libraries Government Documents Department
Centrifugal Creep Test Machine Evaluation Program: Final Report

Centrifugal Creep Test Machine Evaluation Program: Final Report

Date: December 1960
Creator: unknown
Description: Abstract: A centrifugal creep test machine was evaluated for in-pile creep use.
Contributing Partner: UNT Libraries Government Documents Department
Design Report for an Improved ML-1 Pressure Vessel

Design Report for an Improved ML-1 Pressure Vessel

Date: November 1962
Creator: unknown
Description: From abstract: This report reviews the design of the ML-1 pressure vessel, and particularly the tube bundle.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959

Date: February 15, 1960
Creator: Aerojet-General Corporation
Description: Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959

Date: July 31, 1959
Creator: Aerojet-General Corporation
Description: Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile, low-power, nuclear power plant for Military field operation.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1960

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1960

Date: February 22, 1961
Creator: Aerojet-General Corporation
Description: Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1962

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1962

Date: August 17, 1962
Creator: Aerojet-General Corporation
Description: Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile, low-power, nuclear power plant for Military field operation.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1961

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1961

Date: August 10, 1961
Creator: Aerojet-General Corporation
Description: Report regarding the ongoing research and development related to the Army Gas-Cooled Reactor Systems Program. Includes status and progress of the program's projects, experiments, and data evaluations.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959

Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959

Date: May 25, 1959
Creator: Aerojet-General Corporation
Description: Abstract: This monthly progress report covers the activities of the Army Gas-Cooled Reactor System Program for April 1959. The program includes a water-moderated heterogeneous reactor (Gas-Cooled Reactor Experiment I), a graphite-moderated homogeneous reactor (Gas-Cooled Reactor Experiment II), a mobile gas-cooled reactor (ML-1), and the coordination of the Gas Turbine Test Facility. [It reports] the progress of each project, the associated tests and data evaluation, the applicable design criteria, and the fabrication of reactor components" (p. 1).
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964

Date: February 15, 1965
Creator: Aerojet-General Corporation
Description: Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960

Date: July 31, 1960
Creator: Aerojet-General Corporation
Description: Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Contributing Partner: UNT Libraries Government Documents Department
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963

Date: February 15, 1963
Creator: Aerojet-General Corporation
Description: Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Contributing Partner: UNT Libraries Government Documents Department