Search Results

open access

[Flyer on Classified Materials]

Description: Pamphlet featuring a cartoon of a melting snowman in the lower-right corner, in a snowy landscape, looking up at a malevolent sun in the upper left corner. Features on the snowman are labeled with text balloons that say "improper safeguards" (pointing to the snowman's tiny umbrella) "of classified material" (pointing to the coal "buttons" spelling out S-E-C-R-E-T) "can put you on the spot" (pointing to the puddle of snowmelt).
Date: January 31, 1988
Creator: Martin, Pete
Partner: UNT Libraries Government Documents Department
open access

Advanced Water-Cooled Phosphoric Acid Fuel Cell Development, Quarterly Report: July - September 1988

Description: The initial conceptual design configuration was completed. Baseline on-site electrodes were tested at electric utility conditions in 2 x 2 inch cells. GSB-18P cathodes were fabricated. Design of small area development stack was initiated and long lead time items ordered. Molded cooler thermal cycling tests were initiated. Equipment to evaluate alternative manifold coating processes and materials were procured.
Date: January 1, 1988
Partner: UNT Libraries Government Documents Department
open access

Advanced technology for ancillary coal cleaning operations. Technical progress report, January 1988--March 1988

Description: The work under contract number DE-AC22-87PC97881 is devoted to experimental research and development to investigate the feasibility of novel ancillary coal-cleaning technologies that offer a potential for reduced capital and operating costs. The ancilliary operations that are specifically addressed in this work include pulse enhanced drying, fines reconstitution by extrusion, and hydraulic wave comminution.
Date: September 1, 1994
Partner: UNT Libraries Government Documents Department
open access

Modeling of Integrated Environmental Control Systems for Coal-Fired Power Plants Quarterly Report: April-June 1988

Description: This is the third quarterly report of DOE Contract No. DE-AC22- 87PC79864, entitled Modeling of Integrated Environmental Control Systems for Coal-Fired Power Plants.'' This report summarizes accomplishments during the period April 1, 1988 to June 30, 1988. Our efforts during the last quarter focused on, (1) completion of a sulfuric acid plant model (used in conjunction with by-product recovery processes for SO{sub 2}/NO{sub x} removal) and, (2) an update the NOXSO process model. Other accomplis… more
Date: June 1, 1988
Creator: Rubin, E. S.
Partner: UNT Libraries Government Documents Department
open access

Modeling of Integrated Environmental Control Systems for Coal-Fired Power Plants Quarterly Report: July-September 1988

Description: This is the fourth quarterly report of DOE Contract No. DE-AC22-87PC79864, entitled Modeling of Integrated Environmental Control Systems for Coal-Fired Power Plants.'' This report summarizes accomplishments during the period July 1, 1988 to September 30, 1988. Our efforts during the last quarter focused primarily on the completion, testing and documentation of the NO{sub x}SO process model. The sections below present the details of these developments.
Date: October 1, 1988
Creator: Rubin, E. S.
Partner: UNT Libraries Government Documents Department
open access

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 5, Appendix B

Description: This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W6-2; 299-W7-1; 299-W7-2; 299-W7-3; 299-W7-4. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.
Date: May 1, 1988
Partner: UNT Libraries Government Documents Department
open access

Modeling of Integrated Environmental Control Systems for Coal-Fired Power Plants Quarterly Report: April-June 1988

Description: This is the third quarterly report of DOE Contract No. DE-AC22- 87PC79864, entitled ``Modeling of Integrated Environmental Control Systems for Coal-Fired Power Plants.`` This report summarizes accomplishments during the period April 1, 1988 to June 30, 1988. Our efforts during the last quarter focused on, (1) completion of a sulfuric acid plant model (used in conjunction with by-product recovery processes for SO{sub 2}/NO{sub x} removal) and, (2) an update the NOXSO process model. Other accompl… more
Date: June 1, 1988
Creator: Rubin, E. S.
Partner: UNT Libraries Government Documents Department
open access

Delegate Totals and Dates for Presidential Primaries and Caucuses, 1988

Description: This report provides the 1988 Democratic and Republican delegate totals and the calendar of Presidential primaries and caucuses, by State. The information is presented in four separate calendars: alphabetically by State; chronologically by primary or caucus date; and separately for each party, arranged i n State order.
Date: February 29, 1988
Creator: Coleman, Kevin J.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen