Search Results

Advanced search parameters have been applied.
open access

ENHANCED DOE HIGH LEVEL WASTE MELTER THROUGHPUT STUDIES: SRNL GLASS SELECTION STRATEGY

Description: The Department of Energy has authorized a team of glass formulation and processing experts at the Savannah River National Laboratory (SRNL), the Pacific Northwest National Laboratory (PNNL), and the Vitreous State Laboratory (VSL) at Catholic University of America to develop a systematic approach to increase high level waste melter throughput (by increasing waste loading with minimal or positive impacts on melt rate). This task is aimed at proof-of-principle testing and the development of tools… more
Date: January 23, 2008
Creator: Raszewski, F; Tommy Edwards, T & David Peeler, D
Partner: UNT Libraries Government Documents Department
open access

Setup and performance of RHIC for the 2008 run with deuteron-gold collisions.

Description: This year (2008) deuterons and gold ions were collided in the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) for the first time since 2003. The setup and performance of the collider for the 2008 run is reviewed with a focus on improvements that have led to an order of magnitude increase in luminosity over that achieved in the 2003 run.
Date: June 23, 2008
Creator: Gardner,C.; Abreu, N.P.; Ahren, L.; Alessi, J.; Bai, M. & al., et
Partner: UNT Libraries Government Documents Department
open access

RHIC polarized proton performance in run-8.

Description: During Run-8, the Relativistic Heavy Ion Collider (RHIC) provided collisions of spin-polarized proton beams at two interaction regions. Helical spin rotators at these two interaction regions were used to control the spin orientation of both beams at the collision points. Physics data were taken with different orientations of the beam polarization. We present recent developments and improvements as well as the luminosity and polarization performance achieved during Run-8.
Date: June 23, 2008
Creator: Montag, C.; Abreu, N.; Ahrens, L.; Bai, M.; Barton, D. & al., et
Partner: UNT Libraries Government Documents Department
open access

RHIC and its upgrade programmes.

Description: As the first hadron accelerator and collider consisting of two independent superconducting rings RHIC has operated with a wide range of beam energies and particle species. After a brief review of the achieved performance the presentation will give an overview of the plans, challenges and status of machine upgrades, that range from a new heavy ion pre-injector and beam cooling at 100 GeV to a high luminosity electron-ion collider.
Date: June 23, 2008
Creator: Roser, T.
Partner: UNT Libraries Government Documents Department
open access

Operational experience with a near-integer working point at RHIC.

Description: During the RHIC polarized proton run in N 2006 it became evident that the luminosity performance is limited by the beam-beam effect. With a working point between 213 and 7/10, and the necessity to mirror the tunes of the two RHIC rings at the diagonal, the beam with a horizontal tune closest to 213 showed poor lifetime. To overcome this limitation, a near-integer working point has been proposed. Tracking studies performed at both working points showed a larger dynamic aperture near the integer … more
Date: June 23, 2008
Creator: Montag, C.; Bai, M.; Beebe-Wang, J.; FischW; Luo, Y.; Malitsky, N. et al.
Partner: UNT Libraries Government Documents Department
open access

Integrated Global Orbit Feedback with Slow and Fast Correctors

Description: The NSLS-II Light Source, which is planned to be built at Brookhaven National Laboratory, provides users with ultra-bright synchrotron radiation sources and is designed for horizontal beam emittances < 1 nm. Full utilization of the very small emittances and beam sizes requires sub-micron orbit stability in the storage ring. This can be provided by means of a wide bandwidth orbit feedback system. Traditional approach is to utilize a uniform set of fast correctors or use two separate systems w… more
Date: June 23, 2008
Creator: Pinayev,I.
Partner: UNT Libraries Government Documents Department
open access

Experience with IBS-suppression lattice in RHIC

Description: An intra-beam scattering (IBS) is the limiting factor of the luminosity lifetime for RHIC operating with heavy ions. In order to suppress the IBS we designed and implemented new lattice with higher betatron tunes. This lattice had been developed during last three years and had been used for gold ions in yellow ring of the RHIC during d-Au part of the RHIC Run-8. The use of this lattice allowed both significant increases in the luminosity lifetime and the luminosity levels via reduction of beta-… more
Date: June 23, 2008
Creator: Litvinenko,V. N.; Luo, Y.; Ptitsyn, V.; Satogata, T.; Tepikian, S.; Bai, M. et al.
Partner: UNT Libraries Government Documents Department
open access

Large File System Backup: NERSC Global File System Experience

Description: NERSC's Global File system (NGF), accessible from all compute systems at NERSC, holds files and data from many scientific projects. A full backup of this file system to our High Performance Storage System (HPSS) is performed periodically. Disk storage usage by projects at NERSC has grown seven fold over a two year period, from ~;;20TB in June 2006 to ~;;140 TB in June 2008. The latest full backup took about 13 days and more than 200 T10k tape cartridges (.5 TB capacity). Petabyte file systems a… more
Date: October 23, 2008
Creator: Mokhtarani, Akbar; Andrews, Matthew; Hick, Jason & Kramer, William
Partner: UNT Libraries Government Documents Department
open access

GLAST and Suzaku: Study on Cosmic-Ray Acceleration And Interaction in the Cosmos

Description: The Gamma-Ray Large Area Space Telescope (GLAST) is an international and multiagency mission scheduled for launch in the fall 2007. The Large Area Telescope (LAT), the primary instrument of the mission, will survey the high energy sky found to be very dynamic and surprisingly diverse by its predecessor the Energetic Gamma Ray Experiment Telescope (EGRET). GLAST-LAT will have a much improved sensitivity when compared with EGRET and extend the higher energy coverage to {approx} 300 GeV. The instr… more
Date: May 23, 2008
Creator: Kamae, T. & /KIPAC, Menlo Park /SLAC
Partner: UNT Libraries Government Documents Department
open access

Design and Performance of the LCLS Cavity BPM System

Description: In this paper we present the design of the beam position monitor (BPM) system for the LCLS undulator, which features a high-resolution X-band cavity BPM. Each BPM has a TM{sub 010} monopole reference cavity and a TM{sub 110} dipole cavity designed to operate at a center frequency of 11.384 GHz. The signal processing electronics features a low noise single-stage three-channel heterodyne receiver that has selectable gain and a phase locking local oscillator. We will discuss the system specificati… more
Date: January 23, 2008
Creator: Lill, R. M.; Morrison, L. H.; Norum, W. E.; Sereno, N.; Waldschmidt, G. J.; Walters, D. R. et al.
Partner: UNT Libraries Government Documents Department
open access

Comparison of Tracking Codes for the International Linear Collider

Description: In an effort to compare beam dynamics and create a ''benchmark'' for Dispersion Free Steering (DFS) a comparison was made between different International Linear Collider (ILC) simulation programs while performing DFS. This study consisted of three parts. Firstly, a simple betatron oscillation was tracked through each code. Secondly, a set of component misalignments and corrector settings generated from one program was read into the others to confirm similar emittance dilution. Thirdly, given th… more
Date: January 23, 2008
Creator: Latina, A.; Schulte, D.; /CERN; Smith, J.C.; /Cornell U., CLASSE; Poirier, F. et al.
Partner: UNT Libraries Government Documents Department
open access

The Performance of a Fast Closed Orbit Feedback System with Combined Fast and Slow Correctors

Description: For NSLSII closed orbit feedback system, in order to limit the noise caused by digital step changes of the power supplies in the feedback system, the angular kick corresponding to the last bit of the power supplies for the fast correctors must be smaller than 3 nrad [1]. On the other hand, to carry out closed orbit alignment or orbit correction after a long term drift, they need strong correctors with 0.8 mrad kick strength. In order to avoid the requirement of correctors with both large streng… more
Date: June 23, 2008
Creator: Yu, L. H.
Partner: UNT Libraries Government Documents Department
open access

TANK FARM CLOSURE - A NEW TWIST ON REGULATORY STRATEGIES FOR CLOSURE OF WASTE TANK RESIDUALS FOLLOWING NUREG

Description: Waste from a number of single-shell tanks (SST) at the U.S. Department of Energy's (DOE) Hanford Site has been retrieved by CH2M HILL Hanford Group to fulfill the requirements of the 'Hanford Federal Facility Agreement and Consent Order (HFFACO) [1]. Laboratory analyses of the Hanford tank residual wastes have provided concentration data which will be used to determine waste classification and disposal options for tank residuals. The closure of tank farm facilities remains one of the most chall… more
Date: January 23, 2008
Creator: Lehman, L. L.; Mann, F. M. & Watson, D. J.
Partner: UNT Libraries Government Documents Department
open access

A 15-T Pulsed Solenoid for a High-Power Target Experiment

Description: The MERIT experiment, which ran at CERN in 2007, is a proof-of-principle test for a target system that converts a 4-MW proton beam into a high-intensity muon beam for either a neutrino factory complex or a muon collider. The target system is based on a free mercury jet that intercepts an intense proton beam inside a 15-T solenoidal magnetic field. Here, we describe the design and performance of the 15-T, liquid-nitrogen-precooled, copper solenoid magnet.
Date: June 23, 2008
Creator: Kirk, H. G.; Efthymiopoulos, I.; Fabich, A.; Haug, F.; Pereira, H.; Titus, P. et al.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen