Primary view of The Alco Products Inc. Criticality Facility : Description and Operation
Noaks, John W.
July 16, 1958
Primary view of Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959.
Bobe, P. E.; Birken, S. H.; Byrne, B. J.; Clancy, E. F. & Fried, B. E.
May 27, 1960
Primary view of Fission Product Activity in SM-1 Core I Primary System and Surface Contamination on SM-1 Type Fuel Elements. Task XVIII, Phases 2 and 3
Hasse, Robert A. & Zegger, John L.
February 28, 1961
Primary view of Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV
Coombe, J. R.; Brondel, J. O.; Lee, D. H. & Matthews, F. T.
March 30, 1961
Primary view of Hazards Evaluation of the SM-1 Penetrated Gasket
Coombe, J. R.; Gebhardt, F. G. & James, B.
September 8, 1961
Primary view of Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.
Bradley, P. L. & Coombe, J. R.
February 28, 1962
Primary view of Hazards Report for the SM-1 Core II With Special Components
Coombe, J.; Lee, D.; Segalman, I. & Robertson, R.
March 30, 1961
Primary view of Hazards Report for the SM-1 Core II Without Special Components
Gallagher, J. G.
April 19, 1961
Primary view of Hazards Report for Insertion of the PM-1-M-2 Element in the SM-1 Core II
Coombe, J. R.; Scoles, J. F.; Brondel, J. O. & Lee, D. H.
September 1, 1961
Primary view of Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element
Coombe, J. R.; Lee, D. H. & Mathews, F. T.
October 7, 1961
Primary view of Experiments and Analysis for SM-1 Core II With Special Components
Lee, D. H.; Robinson, R. A. & Segalman, I.
January 1, 1961
Primary view of Preliminary Technical Report SM-1 Core III with Type 3 Elements
Inglima, J. N.; Beam, R. H.; Davidson, S. L. & Edgar, E. C.
March 30, 1962
Primary view of BWR Reference Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of PWR Preliminary Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of PL-3 Phase I Task 3 Research and Development Report
Humphries, G. E.
March 12, 1962
Primary view of Silver - Cadmium - Indium Absorber Development
Shaw, R. A. & Harris, R. L.
June 13, 1962
Primary view of Power Distributions for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A
Oggerino, J. P.
July 25, 1962
Primary view of Hazards Report for PM-2A Core II
Coombe, John R. & Stephenson, L. D.
June 21, 1962
Primary view of Mid-Year Summary Report October 1, 1960-March 31, 1961 Army Pwr Support and Development Program
Hoover, H. L.
June 2, 1961
Primary view of Investigation of Local Boiling of SM-1
Bradley, P. L.
June 20, 1961
Primary view of Fast Neutron Flux Measurements and Analysis in SM-1 and PM-2A Core and Vessel Mockups
Sontheimer, K. C.; Kemp, S. N.; Lois, L.; Clancy, E. F. & McCool, W. J.
March 31, 1962
Primary view of Investigation of 17-4 PH Steel Components Used in SM-1, SM-1A, PM-2A Reactor Plants
Haraway, E. S. & Saccocio, R. M.
January 23, 1962
Primary view of Design Criteria for Irradiated Vessels Task 6.0 Summary Report
McLaughlin, D. W.
September 29, 1961
Primary view of Nuclear Measurements for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A CE 3
Raby, T. M.; Walthousen, L. D.; Kemp, S. N.; McCool, W. J.; Sontheimer, K. C. & Robinson, R. A.
January 11, 1962