UNT Libraries Government Documents Department - 13,287 Matching Results

Search Results

Primary view of 45-Day safety screening for Tank 241-B-102 auger samples, riser 1
Bell, K. E.
December 1, 1994
Primary view of 45-Day safety screening for Tank 241-C-103 push mode sample, riser 2
Bell, K. E.
December 16, 1994
Primary view of The 50 GeV program at SLAC
Prescott, C. Y.
March 1, 1994
Primary view of 50-MW X-band klystron sources for the next generation of linear colliders
Caryotakis, G.; Eppley, K.; Fant, K.; Fowkes, R.; Phillips, R.; Tantawi, S. et al.
June 1, 1994
Primary view of 59. Cold Spring Harbor symposium on quantitative biology: Molecular genetics of cancer
unknown creator
December 31, 1994
Primary view of 95-1 Campaign evaporator boildown results
Miller, G. L.
October 10, 1994
Primary view of 100 Area electrical distribution fault and coordination report
Webber, J. J.
September 23, 1994
Primary view of 100 Area excavation treatability study data validation report
Frain, J. M.
May 19, 1994
Primary view of 100 Area soil washing: Bench scale tests on 116-F-4 pluto crib soil
Field, J. G.
June 10, 1994
Primary view of 100 areas technical activities report - engineering, May, 1948
Woods, W. K.
June 18, 1994
Primary view of 100-B area technical baseline report
Carpenter, R. W.
September 1, 1994
Primary view of 100-DR-1 radiological surveys
Naiknimbalkar, N. M.
January 28, 1994
Primary view of 100 Hour Test of the Pressurized Woodchip-Fired Gravel Bed Combustor
Ragland, Kenneth W. & Aerts, Danny J.
August 1, 1994
Primary view of >100 watt average power at 0.53 {mu}m with 25 ns, 2.5 kHz repetition rate pulses from a single power oscillator
Velsko, S. P.; Comaskey, B.; Albrecht, G. F. & Beach, R. J.
March 1, 1994
Primary view of 101-SY waste sample speed of sound/rheology testing for sonic probe program
Cannon, N. S.
July 25, 1994
Primary view of 105-KE Basin isolation barrier leak rate test analytical development
Irwin, J. J.
December 1, 1994
Primary view of 105-KE Basin Pilot Run design plan
Sherrell, D. L.
September 27, 1994
Primary view of 105-KE basin pilot run relocation
Crystal, J. B.
October 14, 1994
Primary view of 118-B-1 excavation treatability test plan
unknown creator
July 1, 1994
Primary view of 118-B-1 excavation treatability test procedures
Frain, J. M.
August 1, 1994
Primary view of 132 ns Bunch Spacing in the Tevatron Proton-Antiproton Collider
Holmes, S. D.; Holt, J.; Johnstone, J. A.; Marriner, J.; Martens, M. & McGinnis, D.
December 1, 1994
Primary view of 180 MW demonstration of advanced tangentially-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Final report
Tavoulareas, E. S.; Hardman, R.; Eskinazi, D. & Smith, L.
February 1, 1994
Primary view of 183-H basin sludge treatability testing program plan
Burbank, D. A.
September 1, 1994
Primary view of 200 Area TEDF interface control document
Brown, M. J. & Hildebrand, R. A.
November 15, 1994
Back to Top of Screen