UNT Libraries Government Documents Department - 3,598 Matching Results

Search Results

Primary view of Feasibility of Constructing Large Underground Cavities: Volume 3, Report on Cost and Constructability
Jacobs Associates
July 3, 1963
Primary view of A Feasibility Study for the Use of an Extended Pm¹⁴⁷ Source for Analytical Fluorescence Spectroscopy: Final Report
Brech, Frederick
October 31, 1960
Primary view of Feasibility Study of a 1000-Mwe Sodium-Cooled Fast Reactor: Volume 1 - Technical and Economic Potential
Eggen, D. T.; Cochran, J. C. & Gibson, A. S.
July 1966
Primary view of Feasibility Study of a High Temperature Integral Liquid Metal Fuel Reactor for Low Cost Power
unknown creator
April 1960
Primary view of Feasibility Study of a New Mass Flow System : Covering the Period from January 1 to January 31, 1961
Burgwald, G. M.; Stone, C. A. & Genthe, William K.
February 15, 1961
Primary view of Feasibility Study of a New Mass Flow System : Quarterly Report No. 1 Covering the Period From June 1 to September 1, 1960
Burgwald, G. M. & Genthe, William K.
September 21, 1960
Primary view of Feasibility Study of a New Mass Flow System : Quarterly Report No. 2 Covering the Period from September 1 to November 30, 1960
Burgwald, G. M.; Stone, C. A. & Genthe, William K.
December 19, 1960
Primary view of Feasibility Study of a New Mass Flow System : Quarterly Report No. 3 Covering the Period from December 1, 1960 to February 28, 1961
Burgwald, G. M.; Stone, C. A. & Genthe, William K.
March 20, 1961
Primary view of Feasibility Study of a New Mass Flow System : Quarterly Report No. 4 Covering the Period from March 1, 1961 to May 31, 1961
Haffner, J. W.; Stone, C. A. & Genthe, William K.
June 23, 1961
Primary view of Feasibility Study of a New Mass Flow System : Quarterly Report No. 5 Covering the Period from June 1, 1961 to August 31, 1961
Haffner, J. W. & Genthe, William K.
September 20, 1961
Primary view of Feasibility Study of Water-Cooled Thermionic Nuclear Power Plant
Martin Company. Nuclear Division.
November 1962
Primary view of Feed Materials Production Center Summary Technical Report: January 1, 1963-March 31, 1963
unknown creator
May 10, 1963
Primary view of Feed Materials Production Center Summary Technical Report: April 1, 1963-June 30, 1963
unknown creator
July 18, 1963
Primary view of Feed Materials Production Center Summary Technical Report: July 1, 1963-September 30, 1963
unknown creator
October 28, 1963
Primary view of Field Operation of a Mobile Reverse Osmosis Pilot Plant
Watson, E. R.
May 1969
Primary view of Fifth Quarterly Progress Report on Fission Product Applications Using Gaseous Beta Sources
Graessley, William W. & Zufall, John W.
October 31, 1961
Primary view of Figure 2.3: Arms-II Computer-Program and Data-Processing Monitor
Hand, J. E. & Borella, H. M.
October 1961
Primary view of Filling and Emptying System, Cannelton Main Lock, Ohio River, and Generalized Tests of Sidewall Port Systems for 110- by 1200-ft Locks: Hydraulic Model Investigation
Ables, Jackson H., Jr. & Boyd, M. B.
February 1966
Primary view of Filling and Emptying System, Cordell Hull Navigation Lock: Cumberland River, Tennessee: Hydraulic Model Investigation
Oswalt, Noel R. & Boyd, M. B.
September 1966
Primary view of Filling and Emptying System, Dardanelle Lock, Arkansas River: Hydraulic Model Investigation
Ables, Jackson H., Jr. & Boyd, M. B.
April 1969
Primary view of Filling and Emptying Systems, Low-Lift Locks, Arkansas River Project: Hydraulic Model Investigation
Ables, Jackson H., Jr. & Boyd, M. B.
November 1966
Primary view of Filling and Emptying Systems, Millers Ferry and Jones Bluff Locks, Alabama River, Alabama: Hydraulic Model Investigation
Ables, Jackson H., Jr. & Boyd, M. B.
March 1966
Primary view of Filters to Provide Nearly Monoenergetic X-Rays
Shambon, Arthur & Murnick, Daniel
July 1962
Primary view of Final Coathanger Design
Yamamoto, B.
January 7, 1964
Back to Top of Screen