UNT Libraries Government Documents Department - 433,314 Matching Results

Search Results

Primary view of 1/12-Scale scoping experiments to characterize double-shell tank slurry uniformity: Test plan
Bamberger, J. A. & Liljegren, L. M.
October 1994
Primary view of 1.5D Quasilinear Model for Alpha Particle-TAE Interaction in ARIES ACT-I
Ghantous, K.; Gorelenkov, N. N.; Kessel, C. & Poli, F.
January 30, 2013
Primary view of 1/6TH SCALE STRIP EFFLUENT FEED TANK-MIXING RESULTS USING MCU SOLVENT
Hansen, E.
February 1, 2006
Primary view of 1. 8K conditioning (non-quench training) of a model SSC dipole
Gilbert, W. S. & Hassenzahl, W. V.
September 1, 1986
Primary view of 1- and 2-D computer analysis of an HDL stress wave switch, 1974, June 25
Mahler, J.
June 25, 1974
Primary view of E-1 CAM Revision 4
unknown creator
April 30, 1970
Primary view of E-1 common analog model. Revision 6.1 (RN-S-0469)
unknown creator
December 29, 1970
Primary view of E-1 Common Analog Model (U)
unknown creator
July 1, 1969
Primary view of 1-D closure models for slender 3-D viscoelastic free jets: von Karman flow geometry and elliptical cross section
Bechtel, S. E.; Forest, M. G.; Holm, D. D. & Lin, K. J.
January 1, 1988
Primary view of 1-D Equilibrium Discrete Diffusion Monte Carlo
Evans, T. M.; Urbatsch, T. J. & Lichtenstein, H.
August 2000
Primary view of 1-D hybrid code for FRM start-up
Stark, R. A. & Miley, G. H.
January 1, 1982
Primary view of A 1-D model for highly sensitive tubular reactors
Hagan, P. S.; Herskowitz, M. & Pirkle, J. C.
January 1, 1987
Primary view of 1-D Van der Waals Foams Heated by Ion Beam Energy Deposition
Zylstra, A; Barnard, J J & More, R M
March 19, 2010
Primary view of 1-D Van der Waals Foams Heated by Ion Beam Energy Deposition
Zylstra, A. B.; Barnard, J. J. & More, R. M.
December 23, 2009
Primary view of 1-Dimensional simulation of thermal annealing in a commercial nuclear power plant reactor pressure vessel wall section
Nakos, J. T.; Rosinski, S. T. & Acton, R. U.
November 1, 1994
Primary view of 01-ERD-111 - The Development of Synthetic High Affinity Ligands
Perkins, J; Balhorn, R; Cosman, M; Lightstone, F & Zeller, L
February 5, 2004
Primary view of 1 - FFTF-LMFBR seal test program, July-September 1974
Kurzeka, W. & Oliva, R.
January 1, 1974
Primary view of 1 GeV CW nonscaling FFAG for ADS, and magnet parameters
Johnstone, C.; Meot, F.; Snopok, P. & Weng, W.
May 20, 2012
Primary view of 1-GeV Linac Upgrade Study at Fermilab
Popovic, M.; Moretti, A.; Noble, R. & Schmidt, C. W.
September 1998
Primary view of 1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage system reference design
Rogers, J. D.; Hassenzahl, W. V. & Schermer, R. I. (comps.)
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix A: energy storage coil and superconductor
Schermer, R.I.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix B: cost study, high-purity aluminum production
Cochran, C. N.; Dawless, R. K. & Whitchurch, J. B.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix C: dewar and structural support
Bennett, J. G. & Ju, F. D.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix D: superconductive magnetic energy storage cavern construction methods and costs
unknown creator
September 1, 1979
Back to Top of Screen