UNT Libraries Government Documents Department - 7,479 Matching Results

Search Results

open access

100 Areas technical activities report -- Physics, November 1946

Description: This report divides the activities for November into three sections: D Pile; F Pile; and general physics. During November the D Pile was down twice for regularly scheduled shutdowns. Two scram occurred during the month, both of short duration. Five Special Request 15 tubes were discharged and recharged with Special Request 15. Some 13 inhour of reactivity were gained during the month. Vertical rod thimbles, 10 through 22, were tested. A Production Test was performed to determine the reactivity … more
Date: December 11, 1946
Creator: Gast, P. F.
open access

100 Areas technical activities report -- Physics, October 1946

Description: The D Pile was down five times for scheduled shutdowns. The fifth shutdown was of short duration for the purpose of discharging temporary ``P`` columns. Details of the shutdowns are given. Three new bismuth columns were established, Special Requests were charged into seven tubes and three Special Requests were discharged. Three tubes were charged with four-inch slugs. The power level of the F Pile has been corrected for the discrepancy noted last month. Material for irradiation under the Specia… more
Date: November 6, 1946
Creator: Gast, P. F.
open access

100 Areas technical activities report -- Physics, October 1949

Description: This report contains brief summaries of activities at the Hanford production reactors for the month of Oct. The activities for the Pile Physics Group are: (1) H Area start-up; (2) outlet temperature recording systems; (3) reactivity balance for each pile for this period. Activities for the Experimental Physics Group are: (1) graphite testing; (2) 305 testing -- P-slug standardization and graphite standards; (3) shielding. Also status is given on critical mass project.
Date: November 21, 1949
Creator: Gast, P. F.
open access

100 Areas technical activities report - physics, September 1946

Description: The Pine unit was down four times during the month. These were all regularly scheduled shutdowns. Times down vary from 16.9 hours to 19.2 hours. A total of 33.4 tons of metal was discharged. The galvano-meter chamber in experimental hole {open_quotes}A{close_quotes} was replaced. One Special Request was discharged and three tubes have been loaded with Special Request samples. A new bismuth column has been established. Some difficulty has been experienced with high temperatures of both tube exit… more
Date: October 9, 1946
Creator: Montgomery, E. B.
open access

100-F area unit purge, May 3, 1945

Description: This report discusses the pressure drop on the 100-F unit, as measured on the eight pressure drop tubes, which had increased to 24 lbs./in.{sup 2} above base by May 2. The unit was shut down on May 3 to purge with 50 ppm solids for 1.1 hr. and to take care of necessary maintenance work.
Date: May 22, 1945
Creator: Kiddker, C. P.
open access

200 Area stack contamination. Interim report, August 2, 1948--October 11, 1948

Description: In connection with the problem of eliminating contamination of the atmosphere by the exhaust from the 221 Building ventilation air stacks, sand filters were previously recommended. Construction of a sand filter in West Area is about completed and construction of a filter in East Area is well underway. This report summarizes the status, technical findings, and comments and suggestions since the writer`s last Interim Report, dated August 6, 1948, was issued.
Date: October 11, 1948
Creator: Lapple, C. E.
Back to Top of Screen