UNT Libraries Government Documents Department - 44,436 Matching Results

Search Results

Primary view of 0. 20-m (8-in.) Primary Burner Development Report
Stula, R. T.; Young, D. T. & Rode, J. S.
December 1977
Primary view of 1-1/2-Loop Semiscale Isothermal Test Program: Program and System Description in Support of Experiment Data Reports.
Aerojet Nuclear Company
February 1, 1974
Primary view of 1.1-meter bore, 8-Tesla test facility
Nelson, R.; Cornish, D.; Zbasnik, J.; Sackett, S. & Taylor, C.
November 19, 1975
Primary view of 1/2/Sup +/. -->. 1/2/Sup -/ Beta Decay of /Sup 19/Ne and the Parity Nonconserving Nn Force
Adelberger, E. G.; Hindi, M. M.; Hoyle, C. D.; Swanson, H. E. & Von Lintig, R. D.
1978~
Primary view of 1,3,5-trichlorobenzene progress report, July--September 1976
Estes, Z. L.
September 1, 1976
Primary view of 1. 5 GeV/c multiturn shaving extraction and its transport line for the Brookhaven AGS
Weng, W. T.; Blumberg, L. N.; Gill, E.; Soukas, A.; Witkover, R. L.; Egleman, E. et al.
January 1, 1979
Primary view of 1.5 megawatt dc chopper power supplies for plasma shape control on Doublet III
Rock, P. J. & Wesley, J. C.
November 1979
Primary view of 1/5-scale experiment of a Mark I boiling-water reactor pressure-suppression system under hypothetical LOCA conditions
Pitts, J. H. & McCauley, E. W.
July 8, 1977
Primary view of 1.06 μm 150 psec laser damage study of diamond turned, diamond turned/ polished and polished metal mirrors
Saito, T. T.; Milam, D.; Baker, P. & Murphy, G.
July 24, 1975
Primary view of 1- and 2-D computer analysis of an HDL stress wave switch, 1974, June 25
Mahler, J.
June 25, 1974
Primary view of E-1 CAM Revision 4
unknown creator
April 30, 1970
Primary view of E-1 common analog model. Revision 6.1 (RN-S-0469)
unknown creator
December 29, 1970
Primary view of 1 - FFTF-LMFBR seal test program, July-September 1974
Kurzeka, W. & Oliva, R.
January 1, 1974
Primary view of 1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage system reference design
Rogers, J. D.; Hassenzahl, W. V. & Schermer, R. I. (comps.)
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix A: energy storage coil and superconductor
Schermer, R.I.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix B: cost study, high-purity aluminum production
Cochran, C. N.; Dawless, R. K. & Whitchurch, J. B.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix C: dewar and structural support
Bennett, J. G. & Ju, F. D.
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix D: superconductive magnetic energy storage cavern construction methods and costs
unknown creator
September 1, 1979
Primary view of 1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix F. 1-GWh electrical system design
Boenig, H. J.
September 1, 1979
Primary view of S-1 project. Volume I. Architecture. 1979 annual report
unknown creator
January 1, 1979
Primary view of S-1 project. Volume II. Hardware. 1979 annual report
unknown creator
January 1, 1979
Primary view of 1 to 12 GeV/c beam transport for transverse or longitudinally polarized protons
Colton, E. P.
January 1, 1979
Primary view of 2. 05 x 10/sup 9/ age of the Oklo uranium deposit
Gancarz, A. J.
January 1, 1977
Primary view of 2 meg-ampere prototype levitated coil for multipole fusion
Green, M. A. & Glueck, R.
November 1, 1979
Back to Top of Screen