UNT Libraries Government Documents Department - 3 Matching Results
Search Results
- Two-Mile Accelerator Project: Quarterly Status Report, 1 October to 30 December 1962
- Introduction: This is the third Quarterly Status Report of work under AEC Contract AT(04-3)-400, held by Stanford University. This contract provides for the construction of the Stanford Linear Accelerator Center (SLAC), a laboratory that will have as its chief instrument a two-mile-long linear electron accelerator.
- Two-Mile Accelerator Project: Quarterly Status Report, 1 January to 31 March 1963
- Introduction: This is the fourth Quarterly Status Report of work under AEC Contract AT(04-3)-400, held by Stanford University. This contract provides for the construction of the Stanford Linear Accelerator Center (SLAC), a laboratory that will have as its chief instrument a two-mile-long linear electron accelerator.
- Two-Mile Accelerator Project: Quarterly Status Report, 1 April to 30 June 1964
- Introduction: Contract AT(04-3)-400 provides for the construction of the Stanford Linear Accelerator Center (SLAC), a laboratory that will have as its chief instrument a two-mile-long linear electron accelerator.