Nuclear Superheat Quarterly Project Report: Eighteenth Quarter, November, 1963-January, 1964

Description: From introduction: "This is the eighteenth in a series of quarterly reports which cover the progress and results from the conceptual designs, economic evaluations and research and development work performed by the General Electric Company as part of Contract AT(01-3)-189, Project Agreement No. 13."
Date: February 15, 1964
Creator: Flock, W. L. & Imhoff, D. H.
open access

Design and Fabrication of Fuel Rods Containing Sintered UO2 Extrusions - Assembly 11L

Description: The extrusion forming of ceramic powders may be economically interesting in the field of nuclear fuel fabrication. When applied to the forming of rod-type uranium dioxide fuel, extrusion processes have been able to produce cylindrical bodies with length-to-diameter ratios much greater than those of the conventional die-pressed pellets. Furthermore, after being sintered, the extrusions have exhibited densities at least as high as those of sintered pellets. Thus, extrusion forming may offer re… more
Date: February 1964
Creator: Megerth, F. H.
open access

Design and Fabrication of Pellet Fuel Rods Clad With Thin Wall Stainless Steel

Description: Summary: Stainless steel clad nuclear fuel cycle costs can be reduced to those associated with Zircaloy clad fuel or potentially lower by reducing the thickness of the clad tube wall until performance penalties offset the savings associated with the reduction in parasitic neutron absorption. To demonstrate the feasibility and investigate performance capabilities of thin clad fuel rods for power reactor application an assembly was fabricated with 0.0127 cm (5 mil) thick stainless steel cladding … more
Date: February 1964
Creator: Hoffmann, J. P.
open access

Mechanical, Fluid Flow, and Heat Transfer Out-Of-Pile Tests on EVESR MKI Prototype Fuel Bundle

Description: Summary: An EVESR MKI prototype fuel bundle was fully instrumented and operated intermittently for a 5-month period at the Pacific Gas and Electric Company’s Moss Landing Power Station. The vessel was operated up to 1000 psi with steam flows from 3000 to 26,600 lb/h, and steam inlet temperatures up to 825 degrees F. Data was recorded for blowout, vibration, flow distribution, heat transfer and pressure drop. The mechanical integrity of the fuel bundle, riser, and jumper system was satisfact… more
Date: February 1964
Creator: Polomik, E. E.; Fritz, J. R. & Ianni, P. W.
open access

Preoperational Power Stability Analysis of the Consumers Big Rock Point Plant

Description: Summary: An analytical study of the stability of the Big Rock Nuclear Reactor has been performed for the plant as built, and supplements a previous design stability study. The plant has been determined by this analysis to be very stable under every mode of operation anticipated during Phase I of the development program testing. Even under conservative assumptions of system parameters the minimum calculated gain and phase margins do not go below 13.0 db and 46 degrees, respectively. (Nor are … more
Date: February 1964
Creator: Case, J. M.
open access

Sodium Mass Transfer. [Part] XI. 1963 Test Run Reports (January - June)

Description: Technical report describing how corrosion data and exposure effects were obtained by subjecting metallic samples, during programmed test runs to flowing sodium in 6 test loops fabricated with various combinations of three selected materials, Type 316 stainless steel, 2 1/4 Cr-1 Mo alloy steel, and 5 Cr-1/2 Mo-1/2 Ti alloy steel. Information produced by each test run, including operational and metallurgical data and analyses, is presented. Data are shown in tables, graphs, and drawings.
Date: February 1964
Creator: Lockhart, R. W.
open access

BWR Reference Design for PL-3

Description: Abstract: The natural circulation, direct cycle, boiling water reactor reference design presented in this technical report is the alternate to the preferred preliminary design developed under Phase I of the PL-3 contract. The report presents plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentation description, shielding description, auxiliary systems, power plant eq… more
Date: February 28, 1962
Creator: Humphries, G. E.
open access

Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.

Description: Abstract: Test procedures for special tests involving in-core SM-1 temperature and flow instrumentation are described (Task XIV Package Tests). These tests involve in-core steady state flow and temperature measurements, loss of flow transients, load transients, reduced primary system pressure operations and reduced element flow. The thermal and hydraulic conditions prevailing in these tests, including steady state and transient burnout rations, are developed. The effects of reduced system pres… more
Date: February 28, 1962
Creator: Bradley, P. L. & Coombe, J. R.
open access

PWR Preliminary Design for PL-3

Description: Abstract: The pressurized water reactor preliminary design presented in this volume is the preferred design developed under Phase I of the PL-3 contact. This technical report presents plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentation description, shielding description, auxiliary systems, power plant equipment, waste disposal, buildings and tunnels, services, … more
Date: February 28, 1962
Creator: Humphries, G. E.
open access

Fission Product Activity in SM-1 Core I Primary System and Surface Contamination on SM-1 Type Fuel Elements. Task XVIII, Phases 2 and 3

Description: Abstract; The fission product data obtained during SM-1 Core I operation (June 1957 - May 1960) is reviewed briefly and interpreted. Evidence is presented to indicate that a fuel element defect was responsible for the high fission product activity level observed in the primary coolant. Relative escape coefficients are calculated and the defect size estimated. Anticipated fission product levels during SM-1 Core II and SM-1A Core I operation are estimated from alpha surface contamination data o… more
Date: February 28, 1961
Creator: Hasse, Robert A. & Zegger, John L.