Concrete and Rock Core Tests, Major Rehabilitation of Starved Rock Lock and Dam, Illinois Waterway, Chicago District, Phase II Compliance, Scour Detection: Final Report

Description: Abstract: Drilling for laboratory testing of concrete and foundation rock was carried out for the U. S. Army Engineer District, Chicago, as part of a major rehabilitation program at the Starved Rock Lock and Dam. The structures are on the Illinois Waterway. This report covers the work accomplished during the Phase II program entitled "Compliance and Scour Detection."
Date: April 1980
Creator: Stowe, Richard L. & Pavlov, Barbara A.
open access

Concrete and Rock Tests, Major Rehabilitation and Compliance, Lockport Lock, Illinois Waterway, Chicago District: Final Report

Description: Abstract: A crack survey , drilling, field and laboratory testing of concrete, and laboratory testing of foundation rock were carried out as part of a major rehabilitation and compliance program at Lockport Lock.
Date: April 1980
Creator: Stowe, Richard L.; Ragan, Steve A.; Campbell, Roy L.; Pavlov, Barbara A.; Thornton, Henry T., Jr. & Wong, Ging S.
open access

Concrete and Rock Core Tests, Major Rehabilitation of Starved Rock Lock and Dam, Illinois Waterway, Chicago District, Phase I, Rehabilitation: Final Report

Description: Abstract: Drilling for laboratory testing of concrete and foundation rock was carried out for the U. S. Army Engineer District, Chicago, as part of a major rehabilitation program at the Starved Rock Lock and Dam.
Date: September 1978
Creator: Stowe, Richard L.; Pavlov, Barbara A. & Wong, Ging S.
open access

Use of Borehole Geophysical Methods in Determining in Situ Bulk Densities and Water Contents in Unconsolidated Materials: Final Report

Description: Introduction: The purpose of this study was to assess the capabilities of the WES geophysical downhole logging equipment for obtaining in situ bulk densities and water contents in unconsolidated materials, to establish a log analysis procedure applicable from one site to another, and to compare geophysically derived properties with those obtained from laboratory analysis of samples.
Date: September 1977
Creator: Hunt, Richard W.
open access

A Concept for the Development of Long-Term Management Plans for Aquatic Plant Control: Final Report

Description: Abstract: This paper describes a general concept that will serve as a basis for developing well-conceived aquatic plant management plans, as well as a step-by-step guide for implementing measures for long-term aquatic plant control while giving proper consideration to their potential long-term effects on the environment.
Date: June 1977
Creator: Sanders, Dana R. & Decell, Joseph Lewis
open access

Analysis of Field Compaction Data: Report 2, Littleville Dam, Westfield River, Massachusetts

Description: Summary: This report is a review of the materials, specifications, procedures, equipment, and testing pertinent to construction and compaction control of the earth-fill embankment of Littleville Dam, Westfield River, Mass., constructed by the U. S. Army Engineer Division, New England.
Date: December 1970
Creator: Torrey, Victor H., III
open access

The Influence of Construction Step Sequence and Nonlinear Material Behavior on Cracking of Earth and Rock-Fill Dams: Preliminary Study

Description: Summary: This report is a review of the materials, specifications, procedures, equipment, and testing pertinent to construction and compaction control of the earth-fill embankment of Littleville Dam, Westfield River, Mass., constructed by the U. S. Army Engineer Division, New England.
Date: December 1970
Creator: Strohm, William E., Jr. & Johnson, Stanley J.