Search Results

open access

Sandia National Laboratories Institutional Plan FY1994--1999

Description: This report presents a five year plan for the laboratory. This plan takes advantage of the technical strengths of the lab and its staff to address issues of concern to the nation on a scope much broader than Sandia`s original mission, while maintaining the general integrity of the laboratory. The plan proposes initiatives in a number of technologies which overlap the needs of its customers and the strengths of its staff. They include: advanced manufacturing technology; electronics; information … more
Date: October 1, 1993
open access

Fiscal years 1994--1998 Information Technology Strategic Plan. Volume 1

Description: A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business p… more
Date: November 1, 1993
open access

Institutional Plan, FY 1995--2000

Description: Sandia recently completed an updated strategic plan, the essence of which is presented in chapter 4. Sandia`s Strategic Plan 1994 takes its direction from DOE`s Fueling a Competitive Economy: Strategic Plan and provides tangible guidance for Sandia`s programs and operations. Although it is impossible to foresee precisely what activities Sandia will pursue many years from now, the strategic plan makes one point clear: the application of our scientific and engineering skills to the stewardship of… more
Date: October 1, 1994
open access

Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000

Description: This report presents the details of the mission and strategic plan for Lawrence Berkeley Laboratory during the fiscal years of 1995--2000. It presents summaries of current programs and potential changes; critical success factors such as human resources; management practices; budgetary allowances; and technical and administrative initiatives.
Date: December 1, 1994
open access

Oil program implementation plan FY 1996--2000

Description: This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary in… more
Date: April 1, 1995
open access

Statements of work for FY 1995 to 2000

Description: The activities and tasks needed to successfully prepare an interim, preliminary, and final performance assessment on the disposal of the low-level fraction of Hanford tank wastes are given. Included are analytic, experimental, computational, writing, and approval tasks. These statements of work will be revised annually.
Date: April 26, 1995
Creator: Mann, F. M.
open access

Tanks focus area multiyear program plan - FY96-FY98

Description: The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline as… more
Date: July 1, 1995
open access

Functional Design Criteria for Fy 1993-2000 Groundwater Monitoring Wells

Description: The purpose of this revision is to update the Line Item Project, 93-L-GFW-152 Functional Design Criteria (FDC) to reflect changes approved in change control M-24-91-6, Engineering Change Notices (ECNs), and expand the scope to include subsurface investigations along with the borehole drilling. This revision improves the ability and effectiveness of maintaining RCRA and Operational groundwater compliance by combining borehole and well drilling with subsurface data gathering objectives. The total… more
Date: January 1, 1996
Creator: Williams, B. A.
open access

Massachusetts Institute of Technology, Plasma Fusion Center FY97--FY98 work proposal

Description: Alcator C-Mod is the high-field, high-density divertor tokamak in the world fusion program. It is one of five divertor experiments capable of plasma currents exceeding one megamp. Because of its compact dimensions, Alcator C-Mod investigates an essential area in parameter space, which complements the world`s larger experiments, in establishing the tokamak physics database. Three key areas of investigation have been called out in which Alcator C-Mod has a vital role to play: (1) divertor researc… more
Date: March 1, 1996
open access

Superconductivity for electric systems program plan, FY 1996--FY 2000

Description: This describes a comprehensive, integrated approach for the development of HTS (high-temperature superconductivity) technology for cost-effective use in electric power applications. This approach supports the program`s mission: to develop the technology that could lead to industrial commercialization of HTS electric power applications, such as fault-current limiters, motors, generators, transmission cables, superinductors, and superconducting energy storage. The vision is that, by 2010, the US … more
Date: March 1, 1996
open access

Tanks focus area multiyear program plan FY97-FY99

Description: The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are m… more
Date: August 1, 1996
open access

AIDS Funding for Federal Government Programs: FY1981-FY1999

Description: This report provides a synopsis of the budget activity related to AIDS from the discovery of the disease in 1981 through FY1999. Funding for AIDS research, prevention and treatment programs within the Department of Health and Human Services (HHS) discretionary budget has increased from $200,000 in FY1981 to an estimated $3.85 billion in FY1999.
Date: March 31, 1998
Creator: Johnson, Judith A.
open access

FY96-98 Summary Report Mercury: Next Generation Laser for High Energy Density Physics SI-014

Description: The scope of the Mercury Laser project encompasses the research, development, and engineering required to build a new generation of diode-pumped solid-state lasers for Inertial Confinement Fusion (ICF). The Mercury Laser will be the first integrated demonstration of laser diodes, crystals, and gas cooling within a scalable laser architecture. This report is intended to summarize the progress accomplished during the first three years of the project. Due to the technological challenges associated… more
Date: May 23, 2000
Creator: Bayramian, A.; Beach, R.; Bibeau, C.; Chanteloup, J.; Ebbers, C.; Emanuel, M. et al.
open access

FY96-98 Summary Report Mercury: Next Generation Laser for High Energy Density Physics SI-014

Description: The scope of the Mercury Laser project encompasses the research, development, and engineering required to build a new generation of diode-pumped solid-state lasers for Inertial Confinement Fusion (ICF). The Mercury Laser will be the first integrated demonstration of laser diodes, crystals, and gas cooling within a scalable laser architecture. This report is intended to summarize the progress accomplished during the first three years of the project. Due to the technological challenges associated… more
Date: May 25, 2000
Creator: Bayramian, A.; Beach, R.; Bibeau, C.; Chanteloup, J.-C.; Ebbers, C.; Emanuel, M. et al.
open access

Task III: UCSD/DIII-D/Textor FY-97-98 Accomplishments

Description: OAK (B204) Task III: UCSD/DIII-D/Textor FY-97-98 Accomplishments. A comprehensive report on the physics of pump limiters and particularly, the characterization of ALT-II, was published in Nuclear Fusion, bringing the project to a closure. The performance of the toroidal pump limiter was characterized under full auxiliary heating of 7 MW of NBI and ICRH and full pumping, as stated in the project milestones. Relevant highlights are: (1) Pumping with ALT-II allows for density control. (2) The achi… more
Date: September 5, 2000
Creator: Boedo, J.A.
open access

A/M Area DNAPL Characterization Report for Cores Collected in FY97 and 1Q98 and 2Q98

Description: Drilling activities were conducted in FY97 and FY98 in the A/M Area to further identify areas of pure phase DNAPL below the water table. The purpose of the work was to further understand the subsurface contaminant distribution and to identify locations below the water table where aggressive DNAPL remediation technologies should be pursued.
Date: February 20, 2001
Creator: Jerome, K. M.
Back to Top of Screen