Homogeneous Reactor Project Quarterly Progress Report: For Period Ending October 31, 1954
Part I. Experimental Reactors: The design has been completed for all the major high-pressure and low-pressure components except the reactor pressure vessel. Contained in this report are the most recent revisions of the low-pressure-system flow sheet, a description of important details of the reactor cell, and the final design of the main heat exchangers, the inner dump tanks and separator. the recombiner and recombiner-condenser, and the outer dump tank and reflux condenser. Part II. Thorium Breeder Reactor: An analysis of the relative effects of major process variables on the economics and characteristics of two-region thorium breeder reactors is nearing completion, and the results to date are presented in this report. From these results most of the major reactor characteristics have been determined; they are reported with certain other engineering studies pertinent to the early phases of the program. Part III. Corrosion: One loop was removed from service and cross sectioned for inspection of the internal surfaces. This loop was of type 347 stainless steel pipe and had a cumulative operating time of more than 12,000 hr with uranyl sulfate solutions varying in concentration from 0.004 to 1.34 m. No excessive or localized corrosion attack was noted except in one highly turbulent area immediately downstream from the in-line corrosion sample holder.
Homogenous Reactor Project Quarterly Progress Report For Period Ending April 30, 1955
Part I. Experimental Reactors: The effect of prompt-neutron lifetime upon reactor safety was investigated for the HRT. It was found that for a given pressure rise the allowable rate of reactivity addition was relatively insensitive to the average prompt-neutron lifetime, although the rate de creased somewhat with decreasing lifetime for the higher pressure rises. With only source neutrons present and the reactor initially subcritical, the allowable rate was practically independent of the initial value of k£. For a core-pressure rise of 400 psi, the corresponding rate of reactivity addition was about 0.8% per second; for a pressure rise of 4000 psi, the rate was 2.5 to 3.0% per second. Part II. Thorium Breeder Reactor: An economic study of one-region thorium breeder reactors was completed. Where possible, the process characteristics and cost factors were the same as those used previously in studies of two-region-type reactors. The mini mum-cost reactor is about 12 ft in diameter, operating with 260 g of thorium per liter on a chemical processing cycle of about 450 days. The ratio of U232 to U233 produced is approximately 2 x 10~4 VIM in the minimum-cost one-region system, compared with 4 x 10 5 in the two-region system. The unit cost of power is 0.9 mill/kwhr higher than for the optimum two-region reactor if it is assumed that the fixed costs for both reactor types are equal and that each reactor delivers 125 Mw of electrical power.
Homogeneous Reactor Project Quarterly Progress Report for Period Ending July 31, 1955
Construction of the HRT reactor shield tank was completed, and the inside surfaces were painted. The roof structure for the tank is being assembled in preparation for an acceptance pressure test. Service piping and instrument lines are being installed in the central room area by ORNL craft forces. This work is approximately 50% complete. Fabrication of all temperature system components, except the blanket outer storage tanks, has been completed.