0.5 {mu}m E/D AlGaAs/GaAs heterostructure field effect transistor technology with DFET threshold adjust implant

0.5 {mu}m E/D AlGaAs/GaAs heterostructure field effect transistor technology with DFET threshold adjust implant

Date: April 1997
Creator: Baca, A. G.; Sherwin, M. E.; Zolper, J. C.; Shul, R. J.; Briggs, R. D.; Heise, J. A. et al.
Description: A doped-channel heterostructure field effect transistor (H-FET) technology has been developed with self-aligned refractory gate processing and using both enhancement- and depletion-mode transistors. D-HFET devices are obtained with a threshold voltage adjust implant into material designed for E-HFET operation. Both E- and D-HFETs utilize W/WSi bilayer gates, sidewall spacers, and rapid thermal annealing for controlling short channel effects. The 0.5 {mu}m E- HFETs (D-HFETs) have been demonstrated with transconductance of 425 mS/mm (265-310 mS/mm) and f{sub t} of 45-50 GHz. Ring oscillator gate delays of 19 ps with a power of 0.6 mW have been demonstrated using direct coupled FET logic. These results are comparable to previous doped-channel HFET devices and circuits fabricated by selective reactive ion etching rather than ion implantation for threshold voltage adjustment.
Contributing Partner: UNT Libraries Government Documents Department
1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

Date: October 3, 1997
Creator: Ferguson, J.E., Westinghouse Hanford, Richland, WA
Description: Manage the Site Systems Engineering process to provide a traceable, integrated, requirements-driven, and technically defensible baseline., Through the Site Integration Group, Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering`s primary interfaces are with the Project Direction Office and with the projects, as well as with the Planning organization.
Contributing Partner: UNT Libraries Government Documents Department
A 1-kW power demonstration from the advanced free electron laser

A 1-kW power demonstration from the advanced free electron laser

Date: August 1997
Creator: Sheffield, R.L.; Conner, C.A. & Fortgang, C.M.
Description: This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured.
Contributing Partner: UNT Libraries Government Documents Department
A-01 metals in stormwater runoff evaluation

A-01 metals in stormwater runoff evaluation

Date: November 6, 1997
Creator: Eldridge, L. L.
Description: As a part of the A-01 investigation required by the NPDES permit, an investigation was performed to ascertain the concentrations of metals specifically copper (Cu), lead (Pb), and zinc (Zn) in stormwater being discharged through the outfall. This information would indicate whether all water being discharged would have to be treated or if only a portion of the discharged stormwater would have to be treated. A study was designed to accomplish this. The first goal was to determine if the metal concentrations increased, decreased, or remained the same as flow increased during a rain event. The second goal was to determine if the concentrations in the storm water were due to dissolved. The third goal was to obtain background data to ascertain if effluent credits could be gained due to naturally occurring metals.Samples from this study were analyzed and indicate that the copper and lead values increase as the flow increases while the zinc values remain essentially the same regardless of the flow rate. Analyses of samples for total metals, dissolved metals, TSS, and metals in solids was complicated because in all cases metals contamination was found in the filters themselves. Some conclusions can be derived if this problem is ...
Contributing Partner: UNT Libraries Government Documents Department
1 MeV electron irradiation of solid Xe nanoclusters in Al : an in-situ HRTEM study.

1 MeV electron irradiation of solid Xe nanoclusters in Al : an in-situ HRTEM study.

Date: December 5, 1997
Creator: Donnelly, S. E.; Furuya, K.; Song, M.; Birtcher, R. C. & Allen, C. W.
Description: Thin film samples of a simple embedded nanocluster system consisting of solid Xe precipitates in Al have been subjected to 1 MeV electron irradiation in a high-voltage electron microscope. High-resolution images have been recorded on videotape in order to monitor the changes to the system resulting from the passage of electrons through the film. Inspection of the video recordings (in some cases frame-by-frame) reveals that complex, rapid processes occur under the electron beam. These include, movement of small clusters, coalescence of neighboring clusters, shape changes, the apparent melting and resolidification of the Xe, and the creation and annealing of extended defects within the Xe lattice. A tentative interpretation of some of the observations is presented in terms of the electron-induced displacement processes at the surface of the clusters.
Contributing Partner: UNT Libraries Government Documents Department
1 nA beam position monitoring system

1 nA beam position monitoring system

Date: June 1, 1997
Creator: Ursic, R.; Flood, R. & Piller, C.
Description: A system has been developed at Jefferson Lab for measuring transverse position of very low current beams delivered to the Experimental Hall B of the Continuous Electron Beam Accelerator Facility (CEBAF). At the heart of the system is a position sensitive cavity operating at 1497 MHz. The cavity utilizes a unique design which achieves a high sensitivity to beam position at a relatively low cavity Q. The cavity output RF signal is processed using a down-converter and a commercial lock-in amplifier operating at 100 kHz. The system interfaces with a VME based EPICS control system using the IEEE, 488 bus. The main features of the system are simple and robust design, and wide dynamic range capable of handling beam currents from 1 nA to 1000 nA with an expected resolution better than 100 {mu}m. This paper outlines the design of the system.
Contributing Partner: UNT Libraries Government Documents Department
A 1- to 5-MW, RCS-based, short-pulse spallation neutron source

A 1- to 5-MW, RCS-based, short-pulse spallation neutron source

Date: June 1997
Creator: Cho, Y.; Chae, Y.-C. & Crosbie, E.
Description: Two accelerator configurations, the linac/compressor ring scheme and the linac/RCS scheme, are commonly used to provide the proton beam power for a short-pulse spallation neutron source. In one configuration, a full-power linac provides the beam power and a compressor ring shortens the pulse length from 1-ms down to 1 {micro}s. In the other, rapid cycling synchrotrons (RCSs) provide the beam power and also shorten the pulse length. A feasibility study of a staged approach to a 5-MW proton source utilizing RCS technology, allowing intermediate operation at 1 MW, was performed at ANL and is presented in this paper. This study is complementary to a study in progress at ORNL based on a linac and an accumulator ring. The 1-MW facility consists of a 400-MeV injector linac that delivers 0.5-mA time-averaged current, a synchrotron that accelerates the beam to 2 GeV at a 30-Hz rate, and two neutron-generating target stations. In the second phase, the 2-GeV beam is accelerated to 10 GeV by a larger RCS, increasing the facility beam power to 5 MW.
Contributing Partner: UNT Libraries Government Documents Department
1-watt composite-slab Er:YAG laser. Revision 1

1-watt composite-slab Er:YAG laser. Revision 1

Date: February 13, 1997
Creator: Page, R. H.; Bartels, R. A.; Beach, R. J.; Sutton, S. B.; Furu, L. H. & LaSala, J. E.
Description: A diode-side-pumped discrete-optic Er{sup 3+} :YAG laser employs pump-light coupling through a sapphire plate diffusion-bonded to the laser slab, removing heat directly at the pump face of the slab instead of requiring conduction through to its far side. This lowers the temperature in the gain region and gives reduced thermal lensing, which produces exceptional beam quality (M{sup 2} {approx} 1.3) at output powers {approx} 0.3 Watt. Powers above 1 Watt have been demonstrated with peak slope efficiencies {approx}20%. The novel architecture is also applicable to other side-pumped lasers.
Contributing Partner: UNT Libraries Government Documents Department
A 2.14 ms candidate optical pulsar in SN1987A: Ten years after

A 2.14 ms candidate optical pulsar in SN1987A: Ten years after

Date: September 1, 1997
Creator: Middleditch, J.; Kristian, J.A.; Kunkel, W.E.; Hill, K.M. & Watson, R.D.
Description: We have monitored Supernova 1987A in optical/near-infrared bands from a few weeks following its birth until the present time in order to search for a pulsar remnant. We have found an apparent pattern of emission near the frequency of 467.5 Hz - a 2.14 ms pulsar candidate, first detected in data taken on the remnant at the Las Campanas Observatory (LCO) 2.5-m Dupont telescope during 14-16 Feb. 1992 UT. We detected further signals near the 2.14 ms period on numerous occasions over the next four years in data taken with a variety of telescopes, data systems and detectors, at a number of ground- and space-based observatories. The sequence of detections of this signal from Feb. `92 through August `93, prior to its apparent subsequent fading, is highly improbable (< 10{sup -10} for any noise source). We also find evidence for modulation of the 2.14 ms period with a {approx}1,000 s period which, when taken with the high spindown of the source (2-3 x 10{sup -10} Hz/s), is consistent with precession and spindown via gravitational radiation of a neutron star with a non- axisymmetric oblateness of {approx}10{sup -6}, and an implied gravitational luminosity exceeding that of the Crab Nebula pulsar by ...
Contributing Partner: UNT Libraries Government Documents Department
2 HZ, 30 T SPLIT PULSE WATER COOLED MAGNET FOR NEUTRON SCATTERING EXPERIMENTS (MATERIALS CHARACTERIZATION AND DESIGN OPTIONS)

2 HZ, 30 T SPLIT PULSE WATER COOLED MAGNET FOR NEUTRON SCATTERING EXPERIMENTS (MATERIALS CHARACTERIZATION AND DESIGN OPTIONS)

Date: August 26, 1997
Creator: EYSSA, Y. M.; WALSH, R. P.; MILLER, J. R.; MILLER, G. E.; PERNAMBUCO-WISE, P.; BIRD, M. D. et al.
Description: No abstract prepared.