open access

N-17, A Delayed Neutron Emitter

Description: The decay scheme of a 4.2 second neutron emitter has been investigated in detail. Chemical and physical evidence shows that it is N{sup 17}, which emits beta rays to a broad excited state of O{sup 17}, which then breaks up into a neutron plus O{sup 16}. The energy spectrum of the neutrons is determined by measuring the energies of the O{sup 16} recoils in a proportional counter. The neutrons have a most probable energy of 0.9 Mev, a 'half width' of less than .5 Mev, and an upper limit of about … more
Date: November 5, 1948
Creator: Alvarez, L. W.
open access

100 Area Water Study

Description: This paper gives a cost breakdown of all the water facilities in the 100-F area for the month of January, 1948. Also given is the cost of chlorine for addition to the process water system along with where it is added and in what amounts. Lastly, the average figure for the hardness for the Columbia River water at Hanford.
Date: September 23, 1948
Creator: Beekman, S. W.
open access

100 Areas: April 9--April 15

Description: Reported are: physics (B Pile, D Pile, F Pile, general physics); and water, corrosion, and engineering (process water control and pressure drop studies, purging studies, corrosion, graphite expansion, downcomer -- B Area).
Date: April 19, 1946
Creator: Jordan, W. E.
open access

100 Areas: April 16--April 22

Description: Reported are: physics (B pile, D pile, F pile, general physics); and water, corrosion and engineering (process water control and pressure drop studies, purging studies, removal of process tube B-3671).
Date: April 26, 1946
Creator: Jordan, W. E.
open access

100 Areas, February 5--February 11

Description: This report gives the weekly status for the B, D, and F piles. Also given is the reactivity status at the end of the week for each pile. Process water control and pressure drop studies are discussed. Finally a brief discussion is given of the graphite expansion problem.
Date: February 15, 1946
Creator: Jordan, W. E.
open access

100 Areas, January 1 through January 7, 1946

Description: During this period the B Pile operated at its assigned power level of 25 MW below rated level, except for 10 hours on January 5. The operating level of the D Pile remained at 25 MW below rating. The rate gain in excess reactivity during equilibrium operation has been about 1.8 inhours/day. On January 1, the power level of the F Pile was dropped to 25 MW below rating from its previous rated level. Rod A was in a favorable position to make a determination of the reactivity coefficients at the tim… more
Date: January 11, 1946
Creator: Jordan, W. E.
open access

100 Areas, January 15 through January 21

Description: This report gives the weekly progress for the B, D, and F piles. The report also gives a brief discussion of the following activities: process water control and pressure drop studies; purging of D, B, and F piles; slug corrosion studies; tube corrosion studies; thimble corrosion studies; and graphite expansion studies.
Date: January 25, 1946
Creator: Jordan, W. E.
open access

100 Areas, January 29 through February 4, 1946

Description: The B Pile operated 25 MW below rated power level without interruption during the week. The D Pile was shut down on January 29. During the shutdown 103 tubes were discharged. The shut down lasted for 15 hours. During operation after the shut down power was reduced to meet graphite temperature restrictions. The F Pile was run steadily throughout the week at 25 MW below rated level. Iron content in the process water averaged 0.015, 0.011 and 0.010 ppm at B, D, and F Areas, respectively. Examinati… more
Date: February 8, 1946
Creator: Jordan, W. E.