1-GeV Linac Upgrade Study at Fermilab
A linac injector for a new proton source complex at Fermilab is assumed to have a kinetic energy of 1 GeV. This linac would be sized to accelerate 100 mA of H{sup -} beam in a 200 microsecond pulse at a 15 Hz repetition rate. This would be adequate to produce {approximately}10{sup 14} protons per pulse allowing for future improvements of the new proton source complex. An alternate proposal is to add 600 MeV of side coupled cavity linac at 805 MHz to the existing 400 MeV Linac. This addition may either be in a new location or use the present Booster tunnel. A discussion of these possibilities will be given. digital.library.unt.edu/ark:/67531/metadc669837/
O(1/M{sup 3}) effects for heavy-light mesons in lattice NRQCD
The masses of spin-singlet and spin-triplet S-wave mesons containing a single heavy quark are computed in the quenched approximation. The light quark action and gauge field action are both classically-improved and tadpole-improved, and the couplings to the heavy quark are organized by the 1/M expansion of tadpole-improved NRQCD. At each of two lattice spacings, near 0.22fm and 0.26fm, meson masses are obtained for heavy quarks spanning the region between charmed and bottom mesons. Results up to O(1/M), O(1/M{sup 2})and O(1/M{sup 3}) are displayed separately, so that the convergence of the heavy quark expansion can be discussed. Also, the effect of each term in the O(1/M{sup 3}) contribution is computed individually. For bottom mesons the 1/M-expansion appears to be satisfactory, but the situation for charmed mesons is less clear. digital.library.unt.edu/ark:/67531/metadc711949/
2-D electric fields and drifts near the magnetic separatrix in divertor tokamaks
A 2-D calculation is presented for the transport of plasma in the edge region of a divertor tokamak solving continuity, momentum, and energy balance fluid equations. The model uses anomalous radial diffusion, including perpendicular ion momentum, and classical cross-field drifts transport. Parallel and perpendicular currents yield a self-consistent electrostatic potential on both sides of the magnetic separatrix. Outside the separatrix, the simulation extends to material divertor plates where the incident plasma is recycled as neutral gas and where the plate sheath and parallel currents dominate the potential structure. Inside the separatrix, various radial current terms - from viscosity, charge-exchange and poloidal damping, inertia, and {triangledown}B - contribute to the determining the potential. The model rigorously enforces cancellation of gyro-viscous and magnetization terms from the transport equations. The results emphasize the importance of E x B particle flow under the X-point which depends on the sign of the toroidal magnetic field. Radial electric field (E{sub y}) profiles at the outer midplane are small with weak shear when high L-mode diffusion coefficients are used and are large with strong shear when smaller H-mode diffusion coefficients are used. The magnitude and shear of the electric field (E{sub y}) is larger both when the core toroidal rotation is co-moving with the inductive plasma current and when the ion {triangledown}B-drift is towards the single-null X-point. digital.library.unt.edu/ark:/67531/metadc667325/
2-D Finite Element Cable and Box IEMP Analysis
A 2-D finite element code has been developed for the solution of arbitrary geometry cable SGEMP and box IEMP problems. The quasi- static electric field equations with radiation- induced charge deposition and radiation-induced conductivity y are numerically solved on a triangular mesh. Multiple regions of different dielectric materials and multiple conductors are permitted. digital.library.unt.edu/ark:/67531/metadc669433/
2-D linear motion system. Innovative technology summary report
The US Department of Energy's (DOE's) nuclear facility decontamination and decommissioning (D and D) program requires buildings to be decontaminated, decommissioned, and surveyed for radiological contamination in an expeditious and cost-effective manner. Simultaneously, the health and safety of personnel involved in the D and D activities is of primary concern. D and D workers must perform duties high off the ground, requiring the use of manlifts or scaffolding, often, in radiologically or chemically contaminated areas or in areas with limited access. Survey and decontamination instruments that are used are sometimes heavy or awkward to use, particularly when the worker is operating from a manlift or scaffolding. Finding alternative methods of performing such work on manlifts or scaffolding is important. The 2-D Linear Motion System (2-D LMS), also known as the Wall Walker{trademark}, is designed to remotely position tools and instruments on walls for use in such activities as radiation surveys, decontamination, and painting. Traditional (baseline) methods for operating equipment for these tasks require workers to perform duties on elevated platforms, sometimes several meters above the ground surface and near potential sources of contamination. The Wall Walker 2-D LMS significantly improves health and safety conditions by facilitating remote operation of equipment. The Wall Walker 2-D LMS performed well in a demonstration of its precision, accuracy, maneuverability, payload capacity, and ease of use. Thus, this innovative technology is demonstrated to be a viable alternative to standard methods of performing work on large, high walls, especially those that have potential contamination concerns. The Wall Walker was used to perform a final release radiological survey on over 167 m{sup 2} of walls. In this application, surveying using a traditional (baseline) method that employs an aerial lift for manual access was 64% of the total cost of the improved technology. However, for areas over approximately 600 m{sup 2}, the Wall Walker would cost less than the baseline. Using the Wall Walker 2-D LMS, ALARA exposure and worker safety is improved, and there is potential for increased productivity. This innovative technology performed better than the baseline by providing real-time monitoring of the tool or instrument position. Also, the Wall Walker 2-D LMS can traverse any two-dimensional path at constant speeds of up to 18.3 linear meters per minute (60 linear feet per minute). The survey production rate for the innovative technology was about 0.6 m{sup 2}/min (6 ft{sup 2}/min); the baseline production rate was approximately 0.3 m{sup 2}/min (3 ft{sup 2}/min), using the same surveying instrument and maximum scanning rate. digital.library.unt.edu/ark:/67531/metadc682357/
A 3-D hydrodynamic dispersion model for modeling tracer transport in Geothermal Reservoirs
A 3-D hydrodynamic dispersion model for tracer transport is developed and implemented into the TOUGH2 EOS3 (T2R3D) module. The model formulation incorporates a full dispersion tensor, based on a 3-D velocity field with a 3-D, irregular grid in a heterogeneous geological system. Two different weighting schemes are proposed for spatial average of 3-D velocity fields and concentration gradients to evaluate the mass flux by dispersion and diffusion of a tracer or a radionuclide. This new module of the TOUGH2 code is designed to simulate processes of tracer/radionuclide transport using an irregular, 3-D integral finite difference grid in non-isothermal, three-dimensional, multiphase, porous/fractured subsurface systems. The numerical method for this transport module is based on the integral finite difference scheme, as in the TOUGH2 code. The major assumptions of the tracer transport module are: (a) a tracer or a radionuclide is present and transported only within the liquid phase, (b) transport mechanisms include molecular diffusion and hydrodynamic dispersion in the liquid phase in addition to advection, and (c) first order decay and linear adsorption on rock grains are taken into account. The tracer or radionuclide is introduced as an additional mass component into the standard TOUGH2 formulation, time is discretized fully implicitly, and non-linearities of the conservation equations are handled using the Newton/Raphson iteration. We have verified this transport module by comparison with results of a 2-D transport problem for which an analytical solution is available. In addition, a field application is described to demonstrate the use of the proposed model. digital.library.unt.edu/ark:/67531/metadc719687/
3-D Spectral IP Imaging: Non-Invasive Characterization of Contaminant Plumes
The overall objective of this project is to develop the scientific basis for characterizing contaminant plumes in the earth's subsurface using field measurements of induced polarization (IP) effects. Three specific objectives towards this end are: (1) Understanding IP at the laboratory level through measurements of complex resistivity as a function of frequency in rock and soil samples with varying pore geometries, pore fluid conductivities and saturations, and contaminant chemistries and concentrations. (2) Developing effective data acquisition techniques for measuring the critical IP responses (time domain or frequency domain) in the field. (3) Developing modeling and inversion algorithms that permit the interpretation of field IP data in terms of subsurface geology and contaminant plume properties. digital.library.unt.edu/ark:/67531/metadc782451/
3-D spectral IP imaging: Non-invasive characterization of contaminant plumes. 1998 annual progress report
'The overall objective of this project is to develop the scientific basis for characterizing contaminant plumes in the earth''s subsurface using field measurements of induced polarization (IP) effects. Three specific objectives towards this end are: (1) understanding IP at the laboratory level through measurements of complex resistivity as a function of frequency in rock and soil samples with varying pore geometries, pore fluid conductivities and saturations, and contaminant chemistries and concentrations; (2) developing effective data acquisition techniques for measuring the critical IP responses (time domain or frequency domain) in the field; (3) developing modeling and inversion algorithms that permit the interpretation of field IP data in terms of subsurface geology and contaminant plume properties. The authors laboratory experiments to date are described in Appendices A and B, which consist of two papers submitted to the annual SAGEEP conference (Frye et al., 1998; Sturrock et al., 1998). The experiments involved measurements of complex resistivity vs. frequency on a suite of brine saturated sandstone samples. In one set of experiments, the fluid chemistry (pH, ionic strength, and cation type) was varied. In a second set of experiments, the microgeometry of the rock matrix was varied. The experiments showed that spectral IP responses are sensitive to subtle variations in both the solution chemistry and rock microgeometry. The results demonstrate that spectral IP responses have the potential of being sensitive indicators of in-situ chemistry and microgeometry, the latter of which may be related to the hydraulic properties. Data Acquisition The authors have been looking in some detail at the effects of electromagnetic coupling and how to practically deal with it. In this area, the results to date are summarized in Vandiver (1998). The progress in the development of modeling and inversion algorithms for IP is described in Appendix C, a paper submitted to the annual SAGEEP conference (Shi et al., 1998). The authors have developed algorithms for forward modeling and inversion of spectral IP data in 3-D media. The algorithms accommodate a general earth model with a complex electrical conductivity as a function of frequency and 3-D spatial position. Using regularization and optimization techniques, the inversion algorithm obtains a 3-D image of resistivity amplitude and phase for each frequency contained in the data set. They have begun testing their algorithms on synthetic data generated from a simple model of a contaminant plume. The complex resistivity parameters of the background medium and plume are based on the laboratory results described above.' digital.library.unt.edu/ark:/67531/metadc625746/
3 MW, 110 GHz ECH system for the DIII-D tokamak
To support the Advanced Tokamak (AT) operating regimes in the DIII-D tokamak, methods need to be developed to control the current and pressure profiles across the plasma discharge. In particular, AT plasmas require substantial off-axis current in contrast to normal tokamak discharges where the current peaks on-axis. An effort is under way to use Electron Cyclotron Current Drive (ECCD) as a method of sustaining the off-axis current in AT plasmas. The first step in this campaign is the installation of three megawatts of electron cyclotron heating power. This involves the installation of three rf systems operating at 110 GHz, the second harmonic resonance frequency on DIII-D, with each system generating nominally 1 MW. The three systems will use one GYCOM (Russian) gyrotron and two CPI (formerly Varian) gyrotrons, all with windowless evacuated corrugated low loss transmission lines. The first two of three 1 MW ECH systems is operating routinely at DIII-D with injected power at 110 GHz of approximately 1.5 MW with good power accountability. Transport experiments using modulated ECH have been performed confirming the power deposition location. On-axis and off-axis current drive experiments have been successfully performed with on-axis ECCD currents of 170 kA being observed. digital.library.unt.edu/ark:/67531/metadc707889/
3(omega) damage threshold evaluation of final optics components using Beamlet mule and off-line testing
A statistics-based model is being developed to predict the laser-damage-limited lifetime of UV optical components on the NIF laser. In order to provide data for the model, laser damage experiments were performed on the Beamlet laser system at LLNL. An early prototype NIF focus lens was exposed to twenty 35 1 nm pulses at an average fluence of 5 J/cm{sup 2}, 3ns. Using a high resolution optic inspection system a total of 353 damage sites was detected within the 1160 cm{sup 2} beam aperture. Through inspections of the lens before, after and, in some cases, during the campaign, pulse to pulse damage growth rates were measured for damage initiating both on the surface and at bulk inclusions. Growth rates as high as 79 {micro}m/pulse (surface diameter) were observed for damage initiating at pre-existing scratches in the surface. For most damage sites on the optic, both surface and bulk, the damage growth rate was approximately l0{micro}m/pulse. The lens was also used in Beamlet for a subsequent 1053 {micro}m/526 {micro}m campaign. The 352 {micro}m-initiated damage continued to grow during that campaign although at generally lower growth rate. digital.library.unt.edu/ark:/67531/metadc671790/
4-D conformal field theories and strings on orbifolds
No abstract prepared. digital.library.unt.edu/ark:/67531/metadc787075/
5-level polysilicon surface micromachine technology: Application to complex mechanical systems
The authors recently reported on the development of a 5-level poly-ilicon surface micromachine fabrication process consisting of four levels of mechanical poly plus an electrical interconnect layer. They are now reporting on the first components designed for and fabricated in this process. These are demonstration systems, which definitively show that five levels of polysilicon provide greater performance, reliability, and significantly increased functionality. This new technology makes it possible to realize levels of system complexity that have so far only existed on paper, while simultaneously adding to the robustness of many of the individual subassemblies. digital.library.unt.edu/ark:/67531/metadc704489/
9 M.y. record of southern Nevada climate from Yucca Mountain secondary minerals
Yucca Mountain, Nevada, is presently the object of intense study as a potential permanent repository for the Nation`s high-level radioactive wastes. The mountain consists of a thick sequence of volcanic tuffs within which the depth to water table ranges from 500 to 700 meters below the land surface. This thick unsaturated zone (UZ), which would host the projected repository, coupled with the present day arid to semi-arid climate, is considered a favorable attribute of the site. Evaluation of the site includes defining the relation between climate variability, as the input function or driver of site- and regional-scale ground-water flow, and the possible future transport and release of radionuclides to the accessible environment. Secondary calcite and opal have been deposited in the UZ by meteoric waters that infiltrated through overlying soils and percolated through the tuffs. The oxygen isotopic composition ({delta}{sup 18}O values) of these minerals reflect contemporaneous meteoric waters and the {delta}{sup 13}C values reflect soil organic matter, and hence the resident plant community, at the time of infiltration. Recent U/Pb age determinations of opal in these occurrences, coupled with the {delta}{sup 13}C values of associated calcite, allow broadbrush reconstructions of climate patterns during the past 9 M.y. digital.library.unt.edu/ark:/67531/metadc704690/
THE 15 LAYER SILICON DRIFT DETECTOR TRACKER IN EXPERIMENT 896.
Large linear silicon drift detectors have been developed and are in production for use in several experiments. Recently 15 detectors were used as a tracking device in BNL-AGS heavy ion experiment (E896). The detectors were successfully operated in a 6.2 T magnetic field. The behavior of the detectors, such as drift uniformity, resolution, and charge collection efficiency are presented. The effect of the environment on the detector performance is discussed. Some results from the experimental run are presented. The detectors performed well in an experimental environment. This is the first tracking application of these detectors. digital.library.unt.edu/ark:/67531/metadc620289/
25. anniversary of the 1973 oil embargo: Energy trends since the first major U.S. energy crisis
The purpose of this publication is not to assess the causes of the 1973 energy crisis or the measures that were adopted to resolve it. The intent is to present some data on which such analyses can be based. Many of the trends presented here fall into two distinct periods. From 1973 to the mid-1980`s, prices continued at very high levels, in part because of a second oil shock in 1979--80. During this period, rapid progress was made in raising American oil production, reducing dependence on oil imports, and improving end-use efficiency. After the oil price collapse of the mid-1980`s, however, prices retreated to more moderate levels, the pace of efficiency gains slowed, American oil production fell, and the share of imports rose. 30 figs. digital.library.unt.edu/ark:/67531/metadc708001/
60 kilograms high explosive containment with multi-diagnostic capability
In anticipation of increasingly stringent environmental regulations, Lawrence Livermore National Laboratory (LLNL) proposes to construct a 60 kilogram (kg) firing chamber to provide blast-effects containment for most of its open-air, high explosives, firing operations. Even though these operations are within current environmental limits, containment of the blast effects and hazardous debris will further drastically reduce emissions to the environment and minimize the generated hazardous waste. digital.library.unt.edu/ark:/67531/metadc667060/
200 Area effluent treatment facility process control plan 98-02
This Process Control Plan (PCP) provides a description of the background information, key objectives, and operating criteria defining Effluent Treatment Facility (ETF) Campaign 98-02 as required per HNF-IP-0931 Section 37, Process Control Plans. Campaign 98-62 is expected to process approximately 18 millions gallons of groundwater with an assumption that the UP-1 groundwater pump will be shut down on June 30, 1998. This campaign will resume the UP-1 groundwater treatment operation from Campaign 97-01. The Campaign 97-01 was suspended in November 1997 to allow RCRA waste in LERF Basin 42 to be treated to meet the Land Disposal Restriction Clean Out requirements. The decision to utilize ETF as part of the selected interim remedial action of the 200-UP-1 Operable Unit is documented by the Declaration of the Record of Decision, (Ecology, EPA and DOE 1997). The treatment method was chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), the Hanford Federal Facility Agreement and Consent Order (known as the Tri-Party Agreement or TPA), and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). digital.library.unt.edu/ark:/67531/metadc681991/
209-E Building -- Response to ventilation failure evaluation
This document provides an evaluation and recommendations for radiological workplace air monitoring and response to ventilation failure for the Critical Mass Laboratory, 209-E Building. The Critical Mass Laboratory, part of the 209-E Building, was designed to provide a heavily shielded room where plutonium and uranium liquid solutions could be brought into various critical configurations under readily controlled and monitored conditions. The facility is contained within a one-story L-shaped concrete block and reinforced concrete building. One wing houses offices, a control room, shops, and a common area while the other wing includes an equipment room, the change room, work areas, and the two-story Critical Assembly Room (CAR). Three of the rooms contain radiologically contaminated equipment and materials. digital.library.unt.edu/ark:/67531/metadc685690/
221-U Facility concrete and reinforcing steel evaluations specification for the canyon disposition initiative (CDI)
This describes a test program to establish the in-situ material properties of the reinforced concrete in Building 221-U for comparison to the original design specifications. Field sampling and laboratory testing of concrete and reinforcing steel structural materials in Building 221-U for design verification will be undertaken. Forty seven samples are to be taken from radiologically clean exterior walls of the canyon. Laboratory testing program includes unconfined compressive strength of concrete cores, tensile strength of reinforcing steel, and petrographic examinations of concrete cores taken from walls below existing grade. digital.library.unt.edu/ark:/67531/metadc683545/
300 area TEDF permit compliance monitoring plan
This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease. digital.library.unt.edu/ark:/67531/metadc624924/
300 Degree C GaN/AlGaN Heterojunction Bipolar Transistor
A GaN/AIGaN heterojunction bipolar transistor has been fabricated using C12/Ar dry etching for mesa formation. As the hole concentration increases due to more efficient ionization of the Mg acceptors at elevated temperatures (> 250oC), the device shows improved gain. Future efforts which are briefly summarized. should focus on methods for reducing base resistance. digital.library.unt.edu/ark:/67531/metadc627350/
324/327 facilities environmental effluent specifications
These effluent technical specifications address requirements for the 324/327 facilities, which are undergoing stabilization activities. Effluent technical specifications are imposed to protect personnel, the environment and the public, by ensuring adequate implementation and compliance with federal and state regulatory requirements and Hanford programs. digital.library.unt.edu/ark:/67531/metadc792840/
324 and 327 essential drawing list
The purpose of this document is to publish a list of essential drawings for the 324 and 327 Facilities. The report consists of a list of engineering drawings, not the drawings themselves. digital.library.unt.edu/ark:/67531/metadc679606/
324 Building fire hazards analysis implementation plan
In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7. digital.library.unt.edu/ark:/67531/metadc676224/
324 Building liquid waste handling and removal system project plan
This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan. digital.library.unt.edu/ark:/67531/metadc687651/
324 Building radiochemical engineering cells, high-level vault, low-level vault, and associated areas closure plan
The Hanford Site, located adjacent to and north of Richland, Washington, is operated by the US Department of Energy, Richland Operations Office (RL). The 324 Building is located in the 300 Area of the Hanford Site. The 324 Building was constructed in the 1960s to support materials and chemical process research and development activities ranging from laboratory/bench-scale studies to full engineering-scale pilot plant demonstrations. In the mid-1990s, it was determined that dangerous waste and waste residues were being stored for greater than 90 days in the 324 Building Radiochemical Engineering Cells (REC) and in the High-Level Vault/Low-Level Vault (HLV/LLV) tanks. [These areas are not Resource Conservation and Recovery Act of 1976 (RCRA) permitted portions of the 324 Building.] Through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-89, agreement was reached to close the nonpermitted RCRA unit in the 324 Building. This closure plan, managed under TPA Milestone M-20-55, addresses the identified building areas targeted by the Tri-Party Agreement and provides commitments to achieve the highest degree of compliance practicable, given the special technical difficulties of managing mixed waste that contains high-activity radioactive materials, and the physical limitations of working remotely in the areas within the subject closure unit. This closure plan is divided into nine chapters. Chapter 1.0 provides the introduction, historical perspective, 324 Building history and current mission, and the regulatory basis and strategy for managing the closure unit. Chapters 2.0, 3.0, 4.0, and 5.0 discuss the detailed facility description, process information, waste characteristics, and groundwater monitoring respectively. Chapter 6.0 deals with the closure strategy and performance standard, including the closure activities for the B-Cell, D-Cell, HLV, LLV; piping and miscellaneous associated building areas. Chapter 7.0 addresses the closure activities identified in Chapter 6.0, and also adds information on closure activities for the soil directly beneath the unit, regulated material removed during closure, and the schedule for closure. Chapter 8.0 provides Surveillance, monitoring and post-closure information and Chapter 9.0 provides a list of references used throughout the document. digital.library.unt.edu/ark:/67531/metadc680234/
324 Building special-case waste assessment in support of the 324 Building closure (TPA milestone M-89-05)
Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05 requires US Department of Energy, Richland Operations Office to complete a 324 Building Special Case Waste Assessment in Support of the 324 Building Closure. This document has been prepared with the intent of meeting this regulatory commitment. Alternatives for the Special Case Wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel. digital.library.unt.edu/ark:/67531/metadc674241/
324 Facility B-cell quality process plan
Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 6a. digital.library.unt.edu/ark:/67531/metadc622478/
324 Facility B-cell quality process plan
Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 5B. digital.library.unt.edu/ark:/67531/metadc620408/
324 Facility B-cell quality process plan
Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 5a. digital.library.unt.edu/ark:/67531/metadc793927/
324 Facility B-cell quality process plan
Quality Process Plan for the Restart of Cell Hot-Work. Addition of Table 4. digital.library.unt.edu/ark:/67531/metadc791905/
324 Facility B-Cell quality process plan
This report documents the quality process plan for the restart of a hot cell in the B Plant, originally a bismuth phosphate processing facility, but later converted to a waste fractionation plant. B-Cell is currently being cleaned out and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/1999. This report describes the major activities that remain for completion of the TPA milestone. digital.library.unt.edu/ark:/67531/metadc687147/
324 Facility B-Cell quality process plan
B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. This includes: (1) Size Reduce Tank 119 and Miscellaneous Equipment. This activity is the restart of hotwork in B-Cell to size reduce the remainder of Tank 119 and other miscellaneous pieces of equipment into sizes that can be loaded into a grout container. This activity also includes the process of preparing the containers for shipment from the cell. The specific activities and procedures used are detailed in a table. (2) Load and Ship Low-Level Waste. This activity covers the process of taking a grouted LLW container from B-Cell and loading it into the cask in the REC airlock and Cask Handling Area (CHA) for shipment to the LLBG. The detailed activities and procedures for this part of cell cleanout are included in second table. digital.library.unt.edu/ark:/67531/metadc674308/
324 Facility B-cell quality process plan
B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell; digital.library.unt.edu/ark:/67531/metadc675818/
324 Facility B-Cell quality process plan
B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell; digital.library.unt.edu/ark:/67531/metadc680498/
327 Building fire hazards analysis implementation plan
In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7. digital.library.unt.edu/ark:/67531/metadc678940/
327 Building liquid waste handling options modification project plan
This report evaluates the modification options for handling radiological liquid waste (RLW) generated during decontamination and cleanout of the 327 Building. The overall objective of the 327 Facility Stabilization Project is to establish a passively safe and environmentally secure configuration of the 327 Facility. The issue of handling of RLW from the 327 Facility (assuming the 34O Facility is not available to accept the RLW) has been conceptually examined in at least two earlier engineering studies (Parsons 1997a and Hobart l997). Each study identified a similar preferred alternative that included modifying the 327 Facility RLWS handling systems to provide a truck load-out station, either within the confines of the facility or exterior to the facility. The alternatives also maximized the use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes. An issue discussed in each study involved the anticipated volume of the RLW stream. Estimates ranged between 113,550 and 387,500 liters in the earlier studies. During the development of the 324/327 Building Stabilization/Deactivation Project Management Plan, the lower estimate of approximately 113,550 liters was confirmed and has been adopted as the baseline for the 327 Facility RLW stream. The goal of this engineering study is to reevaluate the existing preferred alternative and select a new preferred alternative, if appropriate. Based on the new or confirmed preferred alternative, this study will also provide a conceptual design and cost estimate for required modifications to the 327 Facility to allow removal of RLWS and treatment of the RLW generated during deactivation. digital.library.unt.edu/ark:/67531/metadc688329/
327 to 324 Pin tube shipment quality management process plan
The B and W Hanford Company's (BWHC) 327 Facility, in the 300 Area of the Hanford Site, is preparing to ship five Pin Tubes to the 324 Facility for storage and eventual disposition. The Pin Tubes consist of legacy fuel pin pieces and drillings. They will be over-packed in new Pin Tubes and transported to 324 in three shipments. Once received at 324, two of the shipments will be combined for storage as a fissionable material batch, and the other shipment will be added to an existing batch. digital.library.unt.edu/ark:/67531/metadc623347/
340 Facility emergency preparedness hazards assessment
This document establishes the technical basis in support of Emergency Planning activities for the 340 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone, is demonstrated. digital.library.unt.edu/ark:/67531/metadc621497/
340 waste handling complex: Deactivation project management plan
This document provides an overview of the strategy for deactivating the 340 Waste Handling Complex within Hanford`s 300 Area. The plan covers the period from the pending September 30, 1998 cessation of voluntary radioactive liquid waste (RLW) transfers to the 340 Complex, until such time that those portions of the 340 Complex that remain active beyond September 30, 1998, specifically, the Retention Process Sewer (RPS), can also be shut down and deactivated. Specific activities are detailed and divided into two phases. Phase 1 ends in 2001 after the core RLW systems have been deactivated. Phase 2 covers the subsequent interim surveillance of deactivated and stand-by components during the period of continued RPS operation, through the final transfer of the entire 340 Complex to the Environmental Restoration Contractor. One of several possible scenarios was postulated and developed as a budget and schedule planning case. digital.library.unt.edu/ark:/67531/metadc688668/
500 MW Demonstration of Advanced Wall-Fired Combustion Techniques for the Reduction of Nitrogen Oxide (NOx) Emissions from Coal-Fired Boilers
This report presents the results of a US Department of Energy Clean Coal Technology project demonstrating advanced wall-fired combustion techniques for the reduction of nitrogen oxide emissions from coal-fired boilers. digital.library.unt.edu/ark:/67531/metadc668931/
An 800-MeV proton radiography facility for dynamic experiments
The capability has been successfully developed at the Los Alamos Nuclear Science Center (LANSCE) to utilize a spatially and temporally prepared 800-MeV proton beam to produce proton radiographs. A series of proton bursts are transmitted through a dynamically varying object and transported, via a unique magnetic lens system, to an image plane. The magnetic lens system permits correcting for the effects of multiple coulomb scattering which would otherwise completely blur the spatially transmitted information at the image plane. The proton radiographs are recorded on either a time integrating film plate or with a recently developed multi-frame electronic imaging camera system. The latter technique permits obtaining a time dependent series of proton radiographs with time intervals (modulo 358 ns) up to many microseconds and variable time intervals between images. One electronically shuttered, intensified, CCD camera is required per image. These cameras can detect single protons interacting with a scintillating fiber optic array in the image plane but also have a dynamic range which permits recording radiographs with better than 5% statistics for observation of detailed density variations in the object. A number of tests have been carried out to characterize the quality of the proton radiography system for absolute mass determination, resolution, and dynamic range. Initial dynamic experiments characterized the temporal and spatial behavior of shock propagation in high explosives with up to six images per experiment. Based on experience with the prototype system, a number of upgrades are being implemented including the anticipated capability for enhanced mass discrimination through differential multiple coulomb scattering radiographs and more images with improved imaging techniques. digital.library.unt.edu/ark:/67531/metadc676221/
129Iodine: a new tracer for surface water/groundwater interaction
We measured <sup>129</sup>I/<sup>127</sup>I ratios in about 30 major rivers and found a strong signal of anthropogenic <sup>129</sup>I in all of them (Moran et al., 1998). The effect of local point sources ,such as the Savannah River Facility and Hanford Facility are easily observed in the Savannah and Columbia Rivers, respectively. Likewise, the Rhine and Rhone rivers in Switzerland, have ratios well above �background� due to their proximity to the main global source in northwest Europe. Away from local point sources, one observes a mixing trend between atmospherically-delivered <sup>129</sup>I from European nuclear fuel reprocessing facilities, and low-ratio iodine derived from soil weathering (Moran et al., 1998). This anthropogenic <sup>129</sup>I should be easily observable in soil water and shallow groundwater anywhere in the northern hemisphere. digital.library.unt.edu/ark:/67531/metadc711244/
12th International Mouse Genome Conference
No abstract prepared. digital.library.unt.edu/ark:/67531/metadc719380/
1988 Pilot Institute on Global Change on trace gases and the biosphere
This proposal seeks multi-agency funding to conduct an international, multidisciplinary 1988 Pilot Institute on Global Change to take place from August 7 through 21, 1988, on the topic: Trace Gases and the Biosphere. The institute, to be held in Snowmass, Colorado, is envisioned as a pilot version of a continuing series of institutes on Global Change (IGC). This proposal seeks support for the 1988 pilot institute only. The concept and structure for the continuing series, and the definition of the 1988 pilot institute, were developed at an intensive and multidisciplinary Summer Institute Planning Meeting in Boulder, Colorado, on August 24--25, 1987. The theme for the 1988 PIGC, Trace Gases and the Biosphere, will focus a concerted, high-level multidisciplinary effort on a scientific problem central to the Global Change Program. Dramatic year-to-year increases in the global concentrations of radiatively-active trace gases such as methane and carbon dioxide are now well documented. The predicted climatic effects of these changes lend special urgency to efforts to study the biospheric sources and sinks of these gases and to clarify their interactions and role in the geosphere-biosphere system. digital.library.unt.edu/ark:/67531/metadc695679/
1995 and 1996 Upper Three Runs Dye Study Data Analyses
This report presents an analysis of dye tracer studies conducted on Upper Three Runs. The revised STREAM code was used to analyze these studies and derive a stream velocity and a dispersion coefficient for use in aqueous transport models. These models will be used to facilitate the establishment of aqueous effluent limits and provide contaminant transport information to emergency management in the event of a release. digital.library.unt.edu/ark:/67531/metadc710824/
1995 Annual epidemiologic surveillance report for Pantex Plant
This report provides a summary of epidemiologic surveillance data collected from the Pantex Plant from January 1, 1995 through December 31,1995. The data were collected by a coordinator at Pantex and submitted to the Epidemiologic Surveillance Data Center,located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out. The data presented apply only to Pantex. The main sections of the report are the same as in previous years; the 1995 report provides additional information describing the work force by age and occupational groups. digital.library.unt.edu/ark:/67531/metadc694171/
1996--1997 TEMA/DOE oversight annual report
The Tennessee Emergency Management Agency (TEMA) has entered into a five-year agreement with the Department of Energy (DOE) to provide emergency response activities associated with the Oak Ridge Reservation (ORR). The Agreement in Principle (AIP) delineates the duties and responsibilities of the parties. The agreement tasked TEMA with the following responsibilities: develop offsite emergency plans; conduct emergency management training; develop offsite emergency organizations; develop emergency communications; develop emergency facilities; conduct exercises and drills; provide detection and protection equipment; and develop an emergency staff. This report describes progress on the 14 deliverables connected with this contract. digital.library.unt.edu/ark:/67531/metadc689993/
1996-1997 TEMA/DOE oversite annual report
The Tennessee Emergency Management Agency (TEMA) has entered into a five-year agreement with the Department of Energy (DOE) to provide emergency response activities associated with the Oak Ridge Reservation (ORR). The Agreement in Principle (AIP) delineates the duties and responsibilities of the parties. The agreement tasked TEMA with the following responsibilities: develop offsite emergency plans; conduct emergency management training; develop offsite emergency organizations; develop emergency communications; develop emergency facilities; conduct exercises and drills; provide detection and protection equipment; and develop an emergency staff. This document reports on progress on these tasks during the past year. digital.library.unt.edu/ark:/67531/metadc691217/
1996 Milestone Report 3GQH671M Synthesis of Ground-Water Discharge Deposits Near Yucca Mountain
No Description digital.library.unt.edu/ark:/67531/metadc717068/