Search Results

ABWR: PL-2 Design Report
From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Argonne National Laboratory Idaho Division Summary Report: July-September, 1960
Report issued by the Argonne National Laboratory covering a summary report of the work conducted by the Idaho Division. Experimental work and progress made on reactors are presented. This report includes tables, illustrations, and photographs.
Study of Remote Military Power Applications: Report 5, NORAD
From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Study of Remote Military Power Applications: Report 7, Super Sage Rocky Mountains Area
From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Back to Top of Screen