UNT Libraries Government Documents Department - 254 Matching Results

Search Results

open access

The 0.38 Percent Across-the-Board Cut in FY2000 Appropriations

Description: This report outlines cuts made in the federal budget for FY2000. The 0.38% cut was expected to yield savings of $2.4 billion in budget authority and $1.4 billion in outlays for the fiscal year. Departments with cuts in excess of $100 million included the Departments of Defense, Transportation, Health and Human Services, and Education.
Date: February 25, 2000
Creator: Keith, Robert
open access

244-CR Vault Interim Stabilization Project Plan

Description: The 244-CR Vault is a two-level, multi-cell structure of reinforced concrete constructed below grade. The lower cell contains four individual compartments, each containing a steel process storage tank and equipped with a concrete sump. The upper cell contains the piping and support equipment, and has two compartments for each of the tanks. The ''pump pit'' is accessed by the removal of concrete cover blocks, while the smaller ''riser pit'' is accessed by steel cover plates. The facility most re… more
Date: April 25, 2000
Creator: PARKMAN, D.B.
open access

2000 Census: Actions Taken to Improve the Be Counted and Questionnaire Assistance Center Programs

Description: A letter report issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO provided information on the status of the Bureau of the Census' Be Counted and Questionnaire Assistance Center programs, focusing on the steps the Bureau has taken to address certain shortcomings that the Bureau encountered during the dress rehearsal for the 2000 Census."
Date: February 25, 2000
Creator: United States. General Accounting Office.
open access

Acceptance Test Plan for ANSYS Software

Description: This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled.
Date: October 25, 2000
Creator: Crea, B. A.
open access

Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

Description: This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.
Date: July 25, 2000
Creator: Koch, M. R.
open access

Advanced Algorithms for Rapidly Reconstructing Clandestine Releases of Biological Agents in Urban Areas

Description: As the United States plays a greater role in the 21st Century as global peacekeeper and international defender of human rights and democratic principles, there is an increasing likelihood that it will become the focus of acts of terrorism. Such acts of terrorism--sometimes described as ''asymmetric''--could involve the threat or use of weapons of mass destruction (WMD), particularly those considered unconventional, which include ones designed to release chemical or biological agents. In fact, b… more
Date: February 25, 2000
Creator: Shinn, J. H.; Hall, C. H.; Neher, L. A.; Wilder, F. J.; Gouveia, D. W.; Layton, D. W. et al.
open access

ADVANCED DIAGNOSTIC TECHNIQUES FOR THREE-PHASE SLURRY BUBBLE COLUMN REACTORS (SBCR)

Description: This report summarizes the accomplishment made during the first year of this cooperative research effort between Washington University, Ohio State University and Air Products and Chemicals. A technical review of the variables affecting the SBCR performance, some aspects of bubble dynamics and hydrodynamics properties and physical properties of FT waxes and catalyst have been performed. The needed experimental facilities and measurement techniques have been evaluated and prepared. Exxon Norpar 1… more
Date: July 25, 2000
Creator: Al-Dahhan, M.H.; Dudukovic, M.P.; Fan, L.S.; Toseland, B.; Rados, N.; Kemoun, A. et al.
open access

Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico, Class III

Description: The Nash Draw Brushy Canyon Pool (NDP) is southeast New Mexico is one of the nine projects selected in 1995 by the U.S. Department of Energy (DOE) for participation in the Class III Reservoir Field Demonstration Program. The goals of the DOE cost-shared Class Program are to: (1) extend economic production, (2) increase ultimate recovery, and (3) broaden information exchange and technology application. Reservoirs in the Class III Program are focused on slope-basin and deep-basin clastic depositi… more
Date: October 25, 2000
Creator: Murphy, Mark B.
open access

Advancement and Refinement of HyperSoar Modeling

Description: This report discusses the topic of periodic cruise trajectories for hypersonic flight. An extensive review of previous work associated with periodic cruise trajectories for subsonic, supersonic and hypersonic flight is presented to provide the background for this investigation. The primary objective of this report is to discuss why periodic cruise trajectories lead to near fuel-optimal trajectories from a heuristic, mathematical and computational perspective with air breathing propulsion. Resul… more
Date: February 25, 2000
Creator: Carter, P. H., II; Pines, D. J. & vonEggers Rudd, L.
open access

Analysis of Stress Waves Generated in Water Using Ultrashort Laser Pulses

Description: A Mach-Zehnder interferometer was used for analysis of pressure waves generated by ultrashort laser pulse ablation of water. It was found that the shock wave generated by plasma formation rapidly decays to an acoustic wave. Both experimental and theoretical studies demonstrated that the energy transfer to the mechanical shock was less than 1%.
Date: April 25, 2000
Creator: Kim, B. M.; Feit, M. D.; Rubenchik, A. M.; Komashko, A. M.; Reidt, S.; Eichler, J. et al.
open access

Annual Progress Report on the Development of Waste Tank Leak Monitoring and Detection and Mitigation Activities in Support of M-45-08

Description: Milestone M-45-09E of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) [TPA 1996] requires submittal of an annual progress report on the development of waste tank leak detection, monitoring, and mitigation (LDMM) activities associated with the retrieval of waste from single-shell tanks (SSTs). This report details progress for fiscal year 2000, building on the current LDMM strategy and including discussion of technologies, applications, cost, schedule, and te… more
Date: September 25, 2000
Creator: DEFIGH PRICE, C.
open access

Application of finite element, global polynomial, and kriging response surfaces in Progressive Lattice Sampling designs

Description: This paper examines the modeling accuracy of finite element interpolation, kriging, and polynomial regression used in conjunction with the Progressive Lattice Sampling (PLS) incremental design-of-experiments approach. PLS is a paradigm for sampling a deterministic hypercubic parameter space by placing and incrementally adding samples in a manner intended to maximally reduce lack of knowledge in the parameter space. When combined with suitable interpolation methods, PLS is a formulation for prog… more
Date: April 25, 2000
Creator: Romero, Vincent J.; Swiler, Laura Painton & Giunta, Anthony A.
open access

Application of Laboratory and Modeling Capabilities to Extreme Ultraviolet Spectroscopy of Astrophysical Sources

Description: Work funded by the subject LDRD proposal has produced the following results. First, a comprehensive catalog of EUV lines from M-shell iron (Fe IX-XVI) in the 60-140 {angstrom} waveband. Second, a revised estimate of the radiative cooling of high-temperature plasmas by Fe, which dominates the cooling in cosmic-abundance plasmas from 4 x 10{sup 5}K to 1 x 10{sup 7}K. Third, laboratory data to correct theoretical atomic models and develop reliable spectral models of M-shell Fe in the EUV. Fourth, … more
Date: February 25, 2000
Creator: Mauche, C.; Liedahl, D.A. & Beiersdorfer, P.
open access

Appropriations for FY2000: Treasury, Postal Service, Executive Office of the President, and General Government

Description: Appropriations are one part of a complex federal budget process that includes budget resolutions, appropriations (regular, supplemental, and continuing) bills, rescissions, and budget reconciliation bills. This report is a guide to one of the 13 regular appropriations bills that Congress passes each year. It is designed to supplement the information provided by the House and Senate Appropriations Subcommittees on Treasury, Postal Service, Executive Office of the President, and General Governmen… more
Date: May 25, 2000
Creator: Gressle, Sharon S.
open access

Atom trap trace analysis

Description: A new method of ultrasensitive trace-isotope analysis has been developed based upon the technique of laser manipulation of neutral atoms. It has been used to count individual {sup 85}Kr and {sup 81}Kr atoms present in a natural krypton sample with isotopic abundances in the range of 10{sup {minus}11} and 10{sup {minus}13}, respectively. The atom counts are free of contamination from other isotopes, elements,or molecules. The method is applicable to other trace-isotopes that can be efficiently c… more
Date: May 25, 2000
Creator: Lu, Z. T.; Bailey, K.; Chen, C. Y.; Du, X.; Li, Y. M.; O'Connor, T. P. et al.
open access

Baseline Design Compliance Matrix for the Type 4 In Situ Vapor Samplers (ISVS)

Description: The DOE has identified a need to sample vapor space and exhaust ducts in waste tanks that store radioactive waste. This document provides the Design Compliance Matrix (DCM) for the Type 4 In-Situ Vapor Sampling (ISVS) system that is used for completing this sampling function. The DCM identifies the design requirements and the source of the requirements for the Type 4 ISVS system. DCMs are a single-source compilation design requirements for sampling and sampling support equipment and support the… more
Date: January 25, 2000
Creator: Boger, R. M.
open access

Benzene TCLP results from saltstone prepared with 2X ITP flowsheet concentrations of phenylborates

Description: The Savannah River Site (SRS) teamed with the Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), and ITT Flygt Corporation to conduct a test program evaluating shrouded axial propeller mixers (Flygt mixers) for heel removal in SRS Tank 19. SRS is identifying and investigating techniques to remove sludge heels from waste tanks such as Tank 19.
Date: July 25, 2000
Creator: Poirier, M.R.
open access

Biosphere Process Model Report

Description: To evaluate the postclosure performance of a potential monitored geologic repository at Yucca Mountain, a Total System Performance Assessment (TSPA) will be conducted. Nine Process Model Reports (PMRs), including this document, are being developed to summarize the technical basis for each of the process models supporting the TSPA model. These reports cover the following areas: (1) Integrated Site Model; (2) Unsaturated Zone Flow and Transport; (3) Near Field Environment; (4) Engineered Barrier … more
Date: May 25, 2000
Creator: Schmitt, J.
open access

Breast Cancer Research Stamp: Millions Raised for Research, but Better Cost Recovery Criteria Needed

Description: Testimony issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO discussed the Breast Cancer Research Semipostal (BCRS), focusing on the: (1) appropriateness and effectiveness of the BCRS as a fundraiser; and (2) costs associated with developing and selling the BCRS."
Date: May 25, 2000
Creator: United States. General Accounting Office.
open access

Capitol Concerts: Audit of the Receipt and Use of 1999 Funding

Description: A letter report issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO audited the National Park Service's (NPS), the National Symphony Orchestra's (NSO), and Capital Concerts, Incorporated's (CCI) receipt and use of concert designated funding."
Date: September 25, 2000
Creator: United States. General Accounting Office.
Back to Top of Screen