Interim report, production test-105-522-E, examination of pile process tube removed from 100-B and 100-H Piles
Description:
This report covers the examination of nine process tubes, five tubes from B Pile and four from H Pile. Four of the tubes from B File were removed because they were leaking and the fifth was removed because it contained a stuck ruptured slug. Tube 2681-H was removed for graphite mining, tube 2852-H was removed under PT 313-105-14M ``In-Pile Evaluation of 63-S Aluminum Process Tubes,`` and two tubes were removed from channel 0961-H under PT 105-506-E, ``Recirculation of Pile Cooling Water.`` Visu…
more
Date:
February 10, 1955
Creator:
Strege, D. E.