UNT Libraries Government Documents Department - 43,127 Matching Results

Search Results

Electric Reliability: Options for Electric Transmission Infrastructure Improvements
The electric utility industry is inherently capital intensive. At the same time, the industry must operate under a changing and sometimes unpredictable regulatory system at both the federal and state level. The Energy Policy Act of 2005 has set in place government activities intended to relieve congestion on the transmission system. Several factors have contributed to the lack of new transmission capacity; these are outlined within this report. This report also discusses earlier pieces of energy legislation.
Electric Reliability: Options for Electric Transmission Infrastructure Improvements
The electric utility industry is inherently capital intensive. At the same time, the industry must operate under a changing and sometimes unpredictable regulatory system at both the federal and state level. The Energy Policy Act of 2005 has set in place government activities intended to relieve congestion on the transmission system. Several factors have contributed to the lack of new transmission capacity; these are outlined within this report. This report also discusses earlier pieces of energy legislation.
Electric Reliability: Options for Electric Transmission Infrastructure Improvements
The electric utility industry is inherently capital intensive. At the same time, the industry must operate under a changing and sometimes unpredictable regulatory system at both the federal and state level. The Energy Policy Act of 2005 has set in place government activities intended to relieve congestion on the transmission system. Several factors have contributed to the lack of new transmission capacity; these are outlined within this report. This report also discusses earlier pieces of energy legislation.
Electric Reliability: Options for Electric Transmission Infrastructure Improvements
The electric utility industry is inherently capital intensive. At the same time, the industry must operate under a changing and sometimes unpredictable regulatory system at both the federal and state level. The Energy Policy Act of 2005 has set in place government activities intended to relieve congestion on the transmission system. Several factors have contributed to the lack of new transmission capacity; these are outlined within this report. This report also discusses earlier pieces of energy legislation.
Electric Reliability: Options for Electric Transmission Infrastructure Improvements
The electric utility industry is inherently capital intensive. At the same time, the industry must operate under a changing and sometimes unpredictable regulatory system at both the federal and state level. The Energy Policy Act of 2005 has set in place government activities intended to relieve congestion on the transmission system. Several factors have contributed to the lack of new transmission capacity; these are outlined within this report. This report also discusses earlier pieces of energy legislation.
Electric Reliability: Options for Electric Transmission Infrastructure Improvements
The electric utility industry is inherently capital intensive. At the same time, the industry must operate under a changing and sometimes unpredictable regulatory system at both the federal and state level. The Energy Policy Act of 2005 has set in place government activities intended to relieve congestion on the transmission system. Several factors have contributed to the lack of new transmission capacity; these are outlined within this report. This report also discusses earlier pieces of energy legislation.
Electric Transmission: Approaches for Energizing a Sagging Industry
This report discusses factors that have contributed to the lack of new transmission capacity and some of the resulting issues.
Electric Transmission: Approaches for Energizing a Sagging Industry
This report discusses factors that have contributed to the lack of new transmission capacity and some of the resulting issues. This report reviews approaches being taken to address the lack of investment in transmission infrastructure and transmission congestion.
Electric Transmission: Approaches for Energizing a Sagging Industry
This report discusses factors that have contributed to the lack of new transmission capacity and some of the resulting issues. In addition, the report reviews approaches being taken to address the lack of investment in transmission infrastructure and transmission congestion.
Electric Transmission: Approaches for Energizing a Sagging Industry
This report discusses factors that have contributed to the lack of new transmission capacity and some of the resulting issues.
Electric Utility Policy: Comparison of House-Passed H.R. 6 and S.Amdt. 1412, 108th Congress
No Description Available.
Electric Utility Provisions in House-Passed H.R. 6, 109th Congress
No Description Available.
Electric Utility Provisions in House-Passed H.R. 6, 109th Congress
This report describes Title XII of the House-passed H.R. 6 in the 109th Congress and other sections that deal with electric power issues. In part, Title XII would create an electric reliability organization (ERO) that would enforce mandatory reliability standards for the bulk-power system. All ERO standards would be approved by the Federal Energy Regulatory Commission (FERC). Under this title, the ERO could impose penalties on a user, owner, or operator of the bulk-power system that violates any FERC-approved reliability standard.
Electric Utility Regulatory Reform: Issues for the 109th Congress
No Description Available.
Electric Utility Regulatory Reform: Issues for the 109th Congress
This report discusses regulation issues affecting electricity today. Comprehensive electricity legislation may involve several components: Public Utility Holding Company Act (PUHCA) reform, PURPA's requirement that utilities purchase power from qualifying facilities (QFs), and reliability.
Electricity Restructuring Background: Public Utility Holding Company Act of 1935 (PUHCA)
This report provides background information on PUHCA, including its history and impact. It also discusses how PUHCA reform fits into the current electric utility industry restructuring debate. This report will be updated as events warrant. For related information on electricity restructuring, see the CRS Electronic Briefing Book.
Electricity Restructuring Background: The Public Utility Regulatory Policies Act of 1978 and the Energy Policy Act of 1992
No Description Available.
Electricity Restructuring Background: The Public Utility Regulatory Policies Act of 1978 and the Energy Policy Act of 1992
The Energy Policy Act of 1992 (EPACT) increased competition in the electric generating sector by creating new entities that can generate and sell electricity at wholesale without being regulated as utilities under PUHCA. PURPA began to shift more regulatory responsibilities to the federal government, and EPACT continued that shift away from the states by creating new options for utilities and regulators to meet electricity demand.
Electricity: The Road Toward Restructuring
This report talks about Electricity regulation and transmission issues. It also includes the history of the California Electricity Crisis.
Energy Policy Act of 2005, P.L. 109-58: Electricity Provisions
No Description Available.
Federal Energy Regulatory Commissions Standard Market Design Activities
No Description Available.
Flooding Events: CRS Experts
This table provides access to names and contact information for Congressional Research Service (CRS) experts on policy concerns relating to flooding events in the United States. Policy areas identified include impacts, response and recovery, mitigation, and federal financing.
Government Activities to Protect the Electric Grid
No Description Available.
Government Activities to Protect the Electric Grid
This report provides a description of initiatives within the Federal Energy Regulatory Commission and the Departments of Energy, Homeland Security, and Defense to protect the physical electrical utility infrastructure from outages caused by a range of activities including system operator errors, weather-related damage, and terrorist attacks. While the electric utility industry has primary responsibility, federal and state government agencies also have been addressing physical security concerns.
Government Activities to Protect the Electric Grid
This report provides a description of initiatives within the Federal Energy Regulatory Commission and the Departments of Energy, Homeland Security, and Defense to protect the physical transmission infrastructure.
Government Activities to Protect the Electric Grid
This report provides a description of initiatives within the Federal Energy Regulatory Commission and the Departments of Energy, Homeland Security, and Defense to protect the physical transmission infrastructure.
Smart Grid Provisions in H.R. 6, 110th Congress
This report provides an overview of Smart Grid, a distribution system that allows for flow of information from a customer's meter in two directions. It discusses both regulatory and technological barriers that have limited the implementation of Smart Grid technology.
Electricity: The Road Toward Restructuring
This report talks about Electricity regulation and transmission issues. It also includes the history of the California Electricity Crisis.
Electricity: The Road Toward Restructuring
This report talks about Electricity regulation and transmission issues. It also includes the history of the California Electricity Crisis.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
Electricity: The Road Toward Restructuring
The Public Utility Holding Company Act of 1935 (PUHCA) and the Federal Power Act (FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas holding companies by requiring federal control and regulation of interstate public utility holding companies. Comprehensive energy legislation has passed the House and Senate. The House passed H.R. 6 on April 11, 2003. On July 31, 2003, the Senate suspended debate on S. 14, inserted the text of H.R. 4 (107th Congress) as a substitute, and passed H.R. 6. A conference agreement was reached November 17, 2003, and passed by the House the next day. H.R. 6 includes an electricity title that would, in part, repeal PUHCA, would prospectively repeal the mandatory purchase requirement under PURPA, and would create an electric reliability organization. On June 15, 2004, H.R. 4503, a comprehensive energy policy bill, passed the House.
State-by-State Comparison of Selected Electricity Restructuring Provisions
Since 1996, twenty-one states have restructured their electricity markets. While the extent of this restructuring varies by state, four issues have generally been considered by all state legislatures: stranded costs, aggregation, universal service, and public benefits. This report compares the treatment of these issues in the restructuring legislation of the twenty-one states. Using information collected directly from the relevant state laws and the rules promulgated by state public utility commissions, this report provides a state-by-state comparison of the restructuring provisions relating to the four issues.
Electric Utility Infrastructure Vulnerabilities: Transformers, Towers, and Terrorism
No Description Available.
Electric Utility Restructuring: Maintaining Bulk Power System Reliability
No Description Available.
Inflation and Interest Rates: Analysis of the 1960s and Some Implications for the 1970s
This report discusses inflation and interest rates during the 1960s and the outlook for the 1970s.
The Alabama School Prayer Case: Chandler v. Siegelman
This report considers the events of Chandler v. James in 1997. The case was a federal district court ruling in Alabama holding up a statute to violate the establishment of religion of the First amendment. The Governor attempted to appeal the court's position to both the Supreme Court and the circuit court but was denied.
Charitable Choice: Constitutional Issues and Developments Through the 106th Congress
This report is about the charitable choice of constitutional issues and developments through the 106th congress.
The Constitutional Boundaries of Public Aid ro Parochial Schools: An Analysis of Meek V. Pittenger
This report is an analysis of Meek V. Pittenger about the Constitutional Boundaries of Public Aid to Parochial Schools.
Back to Top of Screen