UNT Libraries Government Documents Department - 6,731 Matching Results

Search Results

Primary view of 1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan
Ferguson, J. E.
October 3, 1997
Primary view of A 1-kW power demonstration from the advanced free electron laser
Sheffield, R. L.; Conner, C. A. & Fortgang, C. M.
August 1997
Primary view of A-01 metals in stormwater runoff evaluation
Eldridge, L. L.
November 6, 1997
Primary view of 2 Hz, 30 T Split Pulse Water Cooled Magnet for Neutron Scattering Experiments (Materials Characterization and Design Options)
Eyssa, Y. M.; Walsh, R. P.; Miller, J. R.; Miller, G. E.; Pernambuco-Wise, P.; Bird, M. D. et al.
August 26, 1997
Primary view of A 3-d modular gripper design tool
Brown, R.G. & Brost, R.C.
January 1, 1997
Primary view of 3-D Spectral Induced Polarization (IP) Imaging: Non-Invasive Characterization Of Contaminant Plumes
Morgan, Dale F.; Lesmes, David P.; Rodi, William; Shi, Weiqun; Frye, Kevin, M. & Sturrock, John
June 1, 1997
Primary view of 3-D spectral IP imaging: Non-invasive characterization of contaminant plumes. Annual progress report, September 15, 1996--September 14, 1997
Frye, Kevin M.; Lesmes, David P.; Morgan, F. Dale; Rodi, William; Shi, Weiqun & Sturrock, John
December 1, 1997
Primary view of 3-D vertical seismic profiling at LLNL Site 300
Bainer, R.; Rector, J. & Milligan, P.
January 29, 1997
Primary view of 4.5 Meter high level waste canister study
Calmus, R.B., Westinghouse Hanford, Richland, WA
October 1, 1997
Primary view of 5 MeV Mott polarimeter for rapid precise electron beam polarization measurements
Price, J. S.; Poelker, B. M. & Sinclair, C. K.
November 1, 1997
Primary view of The 16 August 1997 Novaya Zemlya seismic event as viewed from GSN stations KEV and KBS
Hartse, H.E.
November 1, 1997
Primary view of 24 M Meteorological Tower Data Report Period: January--December, 1994
Freeman, D.; Bowen, J. & Egami, R.
August 1, 1997
Primary view of 24 M Meteorological Tower Data Report Period: January Through December, 1995
Freeman, D.; Bowen, J.B.; Egami, R.; Coulombe, W.; Crow, D.; Cristani, B. et al.
December 1, 1997
Primary view of 24 M Meteorological Tower Data Report Period: January Through December, 1996
Freeman, D.; Bowen, J.; Egami, R.; Coulombe, W.; Crow, D.; Cristani, B. et al.
December 1, 1997
Primary view of 60-Day waste compatibility safety issues and final results for AY-102 grab samples
Nuzum, Jennifer L.
January 31, 1997
Primary view of 60-day waste compatibility safety issues and final results for TX-244 grab samples
Nuzum, J. L.
February 5, 1997
Primary view of 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997
Rink, N.A.
August 1, 1997
Primary view of 94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996
Rink, N.
March 1, 1997
Primary view of 94-1 research and development project lead laboratory support. Status report, October 1--December 31, 1996
Rink, N.A.
July 1, 1997
Primary view of 100-D Ponds closure plan. Revision 1
Petersen, S.W.
September 1, 1997
Primary view of 100 years of elementary particles [Beam Line, vol. 27, issue 1, Spring 1997]
Pais, Abraham; Weinberg, Steven; Quigg, Chris; Riordan, Michael; Panofsky, Wolfgang K.H. & Trimble, Virginia
April 1, 1997
Primary view of 105-N basin sediment disposition phase-two sampling and analysis plan
unknown creator
December 31, 1997
Primary view of 120-D-1 (100-D) ponds training plan
Mitchem, G. B.
December 31, 1997
Primary view of 183-H Solar Evaporation Basins PostClosure Plan
Badden, J.W.
December 31, 1997
Back to Top of Screen