UNT Libraries Government Documents Department - 6,731 Matching Results

This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Search Results

open access

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

Description: Manage the Site Systems Engineering process to provide a traceable, integrated, requirements-driven, and technically defensible baseline., Through the Site Integration Group, Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering`s primary interfaces are with the Project Direction Office and with the projects, as well as with the Planning organization.
Date: October 3, 1997
Creator: Ferguson, J. E.
open access

A 1-kW power demonstration from the advanced free electron laser

Description: This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 k… more
Date: August 1997
Creator: Sheffield, R. L.; Conner, C. A. & Fortgang, C. M.
open access

A-01 metals in stormwater runoff evaluation

Description: As a part of the A-01 investigation required by the NPDES permit, an investigation was performed to ascertain the concentrations of metals specifically copper (Cu), lead (Pb), and zinc (Zn) in stormwater being discharged through the outfall. This information would indicate whether all water being discharged would have to be treated or if only a portion of the discharged stormwater would have to be treated. A study was designed to accomplish this. The first goal was to determine if the metal con… more
Date: November 6, 1997
Creator: Eldridge, L. L.
open access

A 3-d modular gripper design tool

Description: Modular fixturing kits are precisely machined sets of components used for flexible, short-turnaround construction of fixtures for a variety of manufacturing purposes. A modular vise is a parallel-jaw vise, where each jaw is a modular fixture plate with a regular grid of precisely positioned holes. A modular vise can be used to locate and hold parts for machining, assembly, and inspection tasks. To fixture a part, one places pins in some of the holes so that when the vise is closed, the part is … more
Date: January 1, 1997
Creator: Brown, R.G. & Brost, R.C.
open access

3-D Spectral Induced Polarization (IP) Imaging: Non-Invasive Characterization Of Contaminant Plumes

Description: The overall objective of this project is to develop the scientific basis for characterizing contaminant plumes in the earth's subsurface using field measurements of induced polarization (IP) effects. Three specific objectives towards this end are 1. 2. 3. Understanding IP at the laboratory level through measurements of complex resistivity as a function of frequency in rock and soil samples with varying pore geometries, pore fluid conductivities and saturations, and contaminant chemistries and c… more
Date: June 1, 1997
Creator: Morgan, Dale F.; Lesmes, David P.; Rodi, William; Shi, Weiqun; Frye, Kevin, M. & Sturrock, John
open access

3-D spectral IP imaging: Non-invasive characterization of contaminant plumes. Annual progress report, September 15, 1996--September 14, 1997

Description: 'The objective of this project is to develop the scientific basis for characterizing contaminant plumes in the earth''s subsurface using field measurements of induced polarization (IP) effects. The first-year accomplishments are (1) laboratory experiments on fluid-saturated sandstones quantifying the dependence of spectral IP responses on solution chemistry and rock micro-geometry; (2) library research on the current understanding of electromagnetic coupling effects on IP data acquired in the f… more
Date: December 1, 1997
Creator: Frye, Kevin M.; Lesmes, David P.; Morgan, F. Dale; Rodi, William; Shi, Weiqun & Sturrock, John
open access

3-D vertical seismic profiling at LLNL Site 300

Description: The initial goal of the 3-D Vertical Seismic Profiling (VSP) work at LLNL was to characterize seismic wave velocities and frequencies below the vadose zone to design the acquisition geometry for a 3-D shallow surface seismic reflection survey. VSPs are also used routinely to provide a link between surface seismic data and well logs. However, a test 2-D seismic line recorded at LLNL in the Spring of 1994 indicated that obtaining high quality reflection images below the vadose zone, yet shallower… more
Date: January 29, 1997
Creator: Bainer, R.; Rector, J. & Milligan, P.
open access

4.5 Meter high level waste canister study

Description: The Tank Waste Remediation System (TWRS) Storage and Disposal Project has established the Immobilized High-Level Waste (IBLW) Storage Sub-Project to provide the capability to store Phase I and II BLW products generated by private vendors. A design/construction project, Project W-464, was established under the Sub-Project to provide the Phase I capability. Project W-464 will retrofit the Hanford Site Canister Storage Building (CSB) to accommodate the Phase I I-ILW products. Project W-464 concept… more
Date: October 1, 1997
Creator: Calmus, R.B., Westinghouse Hanford, Richland, WA
open access

5 MeV Mott polarimeter for rapid precise electron beam polarization measurements

Description: Low energy (E{sub k} = 100 keV) Mott scattering polarimeters are ill-suited to support operations foreseen for the polarized electron injector at Jefferson Lab. One solution is to measure the polarization at 5 MeV where multiple and plural scattering are unimportant and precision beam monitoring is straightforward. The higher injector beam current offsets the lower cross-sections; measured rates scale to 1 kHz/{mu}A with a 1 {mu}m thick gold target foil.
Date: November 1, 1997
Creator: Price, J. S.; Poelker, B. M. & Sinclair, C. K.
open access

The 16 August 1997 Novaya Zemlya seismic event as viewed from GSN stations KEV and KBS

Description: Using current and historic seismic records from Global Seismic Network stations KEV and KBS, the authors find that S minus P arrival time comparisons between nuclear explosions and the 16 August 1997 seismic event (m{sub b} {approx} 3.6) from near Novaya Zemlya clearly indicate that (relative to KEV) the 16 August event occurred at least 80 km east of the Russian test site. Including S minus P arrival times from KBS constrains the location to beneath the Kara Sea and in good agreement with prev… more
Date: November 1, 1997
Creator: Hartse, H.E.
open access

24 M Meteorological Tower Data Report Period: January--December, 1994

Description: This report was prepared by the Desert Research Institute (DRI) for the U.S. Department of Energy (DOE). It summarizes meteorological data collected at the 24 meter tower at the Nevada Test Site Hazardous Material Spill Center (HAZMAT) located at Frenchman Flat near Mercury, Nevada, approximately 75 miles northwest of Las Vegas, Nevada. The tower was originally installed in July, 1993 to characterize baseline conditions for an EPA sponsored experimental research program at the HAZMAT.
Date: August 1, 1997
Creator: Freeman, D.; Bowen, J. & Egami, R.
open access

24 M Meteorological Tower Data Report Period: January Through December, 1995

Description: This report was prepared by the Desert Research Institute (DRI) for the US Department of Energy (DOE). It summarizes meteorological data collected at the 24 meter tower at the Nevada Test Site Hazardous Material Spill Center (HAZMAT) located at Frenchman Flat near Mercury, Nevada, approximately 75 miles northwest of Las Vegas, Nevada. The tower was originally installed in July, 1993 to characterize baseline conditions for an EPA sponsored experimental research program at the HAZMAT. A previous … more
Date: December 1, 1997
Creator: Freeman, D.; Bowen, J.B.; Egami, R.; Coulombe, W.; Crow, D.; Cristani, B. et al.
open access

24 M Meteorological Tower Data Report Period: January Through December, 1996

Description: This report was prepared by the Desert Research Institute (DRI) for the US Department of Energy (DOE). It summarizes meteorological data collected at the 24 meter tower at the Nevada Test Site Hazardous Material Spill Center (HAZMAT) located at Frenchman Flat near Mercury, Nevada, approximately 75 miles northwest of Las Vegas, Nevada. The tower was originally installed in July, 1993 to characterize baseline conditions for an EPA sponsored experimental research program at the HAZMAT. This report… more
Date: December 1, 1997
Creator: Freeman, D.; Bowen, J.; Egami, R.; Coulombe, W.; Crow, D.; Cristani, B. et al.
open access

60-Day waste compatibility safety issues and final results for AY-102 grab samples

Description: Four grab samples (2AY-96-15, 2AY-96-16, 2AY-96-17, and 2AY-96-18) were taken from Riser 15D of Tank 241-AY-102 on October 8, 1996, and received by 222-S Laboratory on October 8, 1996. These samples were analyzed in accordance with Compatibility Grab Sampling and Analysis Plan (TSAP) and Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO) in support of the Waste Compatibility Program. No notifications were required based on sample results.
Date: January 31, 1997
Creator: Nuzum, Jennifer L.
open access

60-day waste compatibility safety issues and final results for TX-244 grab samples

Description: Three grab samples (244-TX-96-1, 244-TX-96-2, and 244-TX-96-3) were taken from Riser 8 of Tank 241-TX-244 on October 18, 1996, and received by 222-S Laboratory on October 18, 1996. These samples were analyzed in accordance with Compatibility Grab Sampling and Analysis Plan (TSAP) and Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO) in support ofthe Waste Compatibility Program. Notifications were made in accordance with TSAP for pH and OH- analyses. Upon further review, t… more
Date: February 5, 1997
Creator: Nuzum, J. L.
open access

94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

Description: This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997.
Date: August 1, 1997
Creator: Rink, N.A.
open access

94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996

Description: This document reports status and technical progress for Los Alamos 94-1 Research and Development projects. Updated schedule charts are shown in the appendix. This is the fourth status report published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials resulting from weapons product… more
Date: March 1, 1997
Creator: Rink, N.
open access

94-1 research and development project lead laboratory support. Status report, October 1--December 31, 1996

Description: This status report is published for Los Alamos National Laboratory 94-1 Research and Development (R and D) projects. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Materials Identification and Surveillance; Stabilization Process Developm… more
Date: July 1, 1997
Creator: Rink, N.A.
open access

100-D Ponds closure plan. Revision 1

Description: The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater moni… more
Date: September 1, 1997
Creator: Petersen, S.W.
open access

100 years of elementary particles [Beam Line, vol. 27, issue 1, Spring 1997]

Description: This issue of Beam Line commemorates the 100th anniversary of the April 30, 1897 report of the discovery of the electron by J.J. Thomson and the ensuing discovery of other subatomic particles. In the first three articles, theorists Abraham Pais, Steven Weinberg, and Chris Quigg provide their perspectives on the discoveries of elementary particles as well as the implications and future directions resulting from these discoveries. In the following three articles, Michael Riordan, Wolfgang Panofsk… more
Date: April 1, 1997
Creator: Pais, Abraham; Weinberg, Steven; Quigg, Chris; Riordan, Michael; Panofsky, Wolfgang K.H. & Trimble, Virginia
open access

105-N basin sediment disposition phase-two sampling and analysis plan

Description: The sampling and analysis plan for Phase 2 of the 105-N Basin sediment disposition task defines the sampling and analytical activities that will be performed to support characterization of the sediment and selection of an appropriate sediment disposal option.
Date: December 31, 1997
open access

120-D-1 (100-D) ponds training plan

Description: This is the Environmental Restoration Contractor Team training plan for the 100-D Ponds treatment, storage, and disposal unit. This plan is intended to meet the requirements of WAC 173-303-330 and the Hanford Dangerous Waste Permit. The WAC 173-303-330(1)(d)(ii, v, vi) requires that personnel be familiar, where applicable, with waste feed cut-off systems, proper responses to groundwater contamination incidents, shutdown of operations, response to fire or explosion, and other process operation a… more
Date: December 31, 1997
Creator: Mitchem, G. B.
open access

183-H Solar Evaporation Basins PostClosure Plan

Description: The 183-H Solar Evaporation Basins (183-H) have certified closure under a modified closure option available in the Hanford Facility Dangerous Waste Permit under Condition II.K.3. The following information contains a description of the unit, past closure actions, and postclosure care requirements subject to compliance under the Permit. Corrective actions required for dangerous waste constituents remaining at 183-H will occur in conjunction with Comprehensive Environmental Response, Compensation,… more
Date: December 31, 1997
Creator: Badden, J.W.
Back to Top of Screen