1.8.3 Site system engineering FY 1997 program plan
The FY 1997 Multi-Year Work Plan (MYWP) technical baseline describes the functions to be accomplished and the technical standards that govern the work. The following information is provided in this FY 1997 MYWP: technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year.
200 Area Liquid Effluent Facilities -- Quality assurance program plan
This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements.
222-S Laboratory maintenance implementation plan
This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance Implementation Plan provides the interface requirements and responsibilities as they apply specifically to 222-S Laboratory. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion section as applied to 222-S Laboratory implementation has been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to keep this document current and in compliance with DOE requirements.
242-A Evaporator Waste Analysis Plan. Revision 5
This Waste Analysis Plan (WAP) provides the plan for obtaining information needed for proper waste handling and processing in the 242-A Evaporator (Evaporator) located on the Hanford Site. In particular it addresses analysis necessary to manage the waste according to Washington Administrative Code (WAC) 173-303 and Parts 264 and 265 of the Code of Federal Regulations (CFR). Regulatory and safety issues are addressed by establishing boundary conditions for waste received and treated at the 242-A Evaporator. The boundary conditions are set by establishing limits for items such as potential exothermic reactions, waste compatibility, and control of vessel vent organic emissions. Boundary conditions are also set for operational considerations and to ensure waste acceptance at receiving facilities. The issues that are addressed in this plan include prevention of exotherms in the waste, waste compatibility, and vessel vent emissions. Samples from the other streams associated with the Evaporator are taken as required by Process Control Plans but are excluded from this plan because either the streams do not contain dangerous waste or the analyses are not required by WAC 173-303-300.
300 Area TEDF NPDES Permit Compliance Monitoring Plan
This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.
308 Building electrical load list and panel schedules
This report contains two lists. The first lists equipment, load location, source of power, and breaker identification. The second compiles the same information but in a different format, namely, for each power source, the breaker, equipment, and location is given. Building 308 is part of the Fuels and Materials Examination Facility which houses the Secure Automated Fabrication process line for fabrication of reactor fuels and the Breeder Processing Engineering Test for processing Fast Flux Test Facility fuel to demonstrate closure of the fuel cycle.
1997 annual report on waste generation and waste minimization progress as required by DOE Order 5400.1, Hanford Site
Hanford`s missions are to safely clean up and manage the site`s legacy wastes, and to develop and deploy science and technology. Through these missions Hanford will contribute to economic diversification of the region. Hanford`s environmental management or cleanup mission is to protect the health and safety of the public, workers, and the environment; control hazardous materials; and utilize the assets (people, infra structure, site) for other missions. Hanford`s science and technology mission is to develop and deploy science and technology in the service of the nation including stewardship of the Hanford Site. Pollution Prevention is a key to the success of these missions by reducing the amount of waste to be managed and identifying/implementing cost effective waste reduction projects. Hanford`s original mission, the production of nuclear materials for the nation`s defense programs, lasted more than 40 years, and like most manufacturing operations, Hanford`s operations generated large quantities of waste and pollution. However, the by-products from Hanford operations pose unique problems like radiation hazards, vast volumes of contaminated water and soil, and many contaminated structures including reactors, chemical plants and evaporation ponds. The cleanup activity is an immense and challenging undertaking, which includes characterization and decommissioning of 149 single shell storage tanks, treating 28 double shell tanks, safely disposing of over 2,100 metric tons of spent nuclear fuel stored on site, removing numerous structures, and dealing with significant solid waste, ground water, and land restoration issues.
1997 project of the year, PUREX deactivation project
At the end of 1992, the PUREX and UO{sub 3} plants were deemed no longer necessary for the defense needs of the United States. Although no longer necessary, they were very costly to maintain in their post-operation state. The DOE embarked on a deactivation strategy for these plants to reduce the costs of providing continuous surveillance of the facilities and their hazards. Deactivation of the PUREX and UO{sub 3} plants was estimated to take 5 years and cost $222.5 million and result in an annual surveillance and maintenance cost of $2 million. Deactivation of the PUREX/UO{sub 3} plants officially began on October 1, 1993. The deactivation was 15 months ahead of the original schedule and $75 million under the original cost estimate. The annual cost of surveillance and maintenance of the plants was reduced to less than $1 million.
Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N
This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.
Acid measurements via near-infrared spectroscopy
We were able to predict acid concentration to {plus_minus}0.08M HNO{sub 3}. In the presence of Al{sup 3} interference, the prediction dropped to {plus_minus}0.29 mols/liter over the range 0 to 9M HNO{sub 3}. Temperature affects the prediction of acid adversely and would have to be modelled out or the sample cell thermostated prior to using this method. 10 refs, 12 figs.(DLC)
Acid measurements via near-infrared spectroscopy
We were able to predict acid concentration to {plus minus}0.08M HNO{sub 3}. In the presence of Al{sup 3} interference, the prediction dropped to {plus minus}0.29 mols/liter over the range 0 to 9M HNO{sub 3}. Temperature affects the prediction of acid adversely and would have to be modelled out or the sample cell thermostated prior to using this method. 10 refs, 12 figs.(DLC)
Addendum 2 to CSER 79-002: Extension of the 150 gram fissile limit used in room 187 of PFP
The PFP operating organization requests that the limit set permitting 150 grams fissile be extended to the Hoods 4 and 5 of Room 187. The request for the limit change is explained in the attached request for analysis.
Addendum to the Corrective Action Investigation Plan for Corrective Action Unit 447, Project Shoal Area, Nevada Subsurface Site, Revision 1, April 1999
The report is an addendum to Chapter 6.0, ''Field Investigation,'' of the Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site, DOE/NV--513. Sections 6.0 and 6.1 in DOE/NV--513 continue to stand, with the sections below following after them. These new sections represent information that was not available at the time DOE/NV--513 was issued.
ADVANCED HYBRID PARTICULATE COLLECTOR
A new concept in particulate control, called an advanced hybrid particulate collector (AHPC), is being developed under funding from the US Department of Energy. The AHPC combines the best features of electrostatic precipitators (ESPs) and baghouses in a manner that has not been done before. The AHPC concept consists of a combination of fabric filtration and electrostatic precipitation in the same housing, providing major synergism between the two collection methods, both in the particulate collection step and in transfer of the dust to the hopper. The AHPC provides ultrahigh collection efficiency, overcoming the problem of excessive fine-particle emission with conventional ESPs, and it solves the problem of reentrainment and collection of dust in conventional baghouses.
Advanced Processing of CdTe- and CuInxGa1-xSe2-Based Solar Cells: Final Report: 18 April 1995 - 31 May 1998
This report summarizes work performed by the University of South Florida Department of Electrical Engineering under this subcontract. The Cadmium telluride(CdTe) portion of this project deals with the development of high-efficiency thin-filmed CdTe solar cells using fabrication techniques that are suitable for manufacturing environments.
Advanced thermal barrier coating system development. Technical progress report, March 1, 1997--May 31, 1997
Objectives of this program are to provide an improved thermal barrier coating system with improved reliability and temperature capability. This report describes progress in manufacturing, bonding, deposition, non-destructive evaluation, repair, and maintenance.
Aerogel commercialization pilot project. Final program report
Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.
ALARA plan for the Old Hydrofracture Facility tanks contents removal project at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Amendment 1 for Appendix B: Install flex-pipe on tank riser spools
This amendment to Appendix B contains the specific ALARA evaluations for installing flex-pipe on riser spools to accommodate ventilation duct connections to the north risers of each tank. The work will be a routine task that is part of the Equipment Installation and Mobilization phase of the project. The dose rates were estimated using the recent Radiological Surveillance Section radiological survey: SAAS-97-063S. Task B-6 has been added to the OHF Project ALARA review process to address a field decision to modify an approach to installing the tank ventilation system. The revised approach will incorporate 12-in. diameter, 36-in. long, stainless steel flex-pipe connected to each north riser spool to address the problem of pipe fitting multiple bends and turns expected with the 12-in. PVC duct. This improved approach will reduce the time necessary to install the duct system between the tanks and the ventilation skid. However, the task includes opening the 12-in. riser spool connections to replace the currently installed blind gaskets. Since a riser spool for each tank will be opened, there is a potential for significant personnel exposure and spread of contamination that will addressed through this ALARA review process.
Alaska Power Administration Federal Power Program financial statements with supplementary information September 30, 1994 and September 30, 1993 with auditors` reports thereon
The attached report presents the results of our audit of the Department of Energy`s Alaska Power Administration (APA) financial statements as of September 30, 1994. In our opinion, the APA statements are fairly presented in all material respects in accordance with generally accepted accounting principles. our reports on the APA internal control structure and on its compliance with laws and regulations are also provided. The US Government, through the Department of Energy, operates APA at two sites to provide hydroelectric power to Juneau and Anchorage, Alaska. Additional information about APA is provided in the notes to the financial statements. The 1994 financial statement audit was made under provisions of the Inspector General Act (5 USC. App.), as amended, the Chief Financial Officers (CFO) Act (31 USC 1500) and the Office of Management and Budget implementing guidance to the CFO Act. The auditors` work was conducted in accordance with generally accepted government auditing standards.
Alternatives Generation Analysis Long Length Contaminated Equipment Removal System Storage
The long length contaminated equipment was designed and built to aid in the remote removal and transport of highly radioactive, contaminated equipment from various locations in the tank farms to disposal. The equipment has been stored in an open lay-down yard area, exposed to the elements for the past year and a half. The possible alternatives available to provide shelter for the equipment are investigated.
Ammonium generation during SRAT cycle
During the IDMS noble-metal demonstration runs ammonium nitrate deposition was found in the vessel vent system of the feed preparation area. In the bench-scale experiments of studying the hydrogen generation during the sludge treatment cycle, ammonium ion production was also monitored. It was found that: During a simulation of the DWPF Cold Chemical Runs SRAT cycle no detectable amount of ammonium ions was generated when treating a non-noble-metal containing sludge simulant according to the nitric acid flowsheet. Ammonium ions were generated during the SRAT-SME cycle when treating the noble-metal containing sludge with either formic acid or nitric acid/late-washing PHA. This is due to the reaction between formic acid and nitrate catalyzed by the noble metals in the sludge simulant. Ammonium ion production closely followed the hydrogen evolution from the catalytic decomposition of formic acid. This report summarizes the results of the production of ammonia during the SRAT cycle.
Ammonium generation during SRAT cycle
During the IDMS noble-metal demonstration runs ammonium nitrate deposition was found in the vessel vent system of the feed preparation area. In the bench-scale experiments of studying the hydrogen generation during the sludge treatment cycle, ammonium ion production was also monitored. It was found that: During a simulation of the DWPF Cold Chemical Runs SRAT cycle no detectable amount of ammonium ions was generated when treating a non-noble-metal containing sludge simulant according to the nitric acid flowsheet. Ammonium ions were generated during the SRAT-SME cycle when treating the noble-metal containing sludge with either formic acid or nitric acid/late-washing PHA. This is due to the reaction between formic acid and nitrate catalyzed by the noble metals in the sludge simulant. Ammonium ion production closely followed the hydrogen evolution from the catalytic decomposition of formic acid. This report summarizes the results of the production of ammonia during the SRAT cycle.
Analysis of historical gross gamma logging data from BY tank farm
Gross gamma ray logs, recorded from January 1975 through mid-year 1994 as part of the Single-Shell Tank Farm Dry Well Surveillance Program, have been reanalyzed for the BY tank farm to locate the presence of mobile radionuclides in the subsurface. This report presents the BY tank farm gross gamma ray data in such a way as to assist others in their study of vadose zone mechanisms.
Analysis of Periodic Transient Beam Loading of the AGS
In this note, we discuss the multi-batch bunched ;beam loading during the injection from the Booster to the AGS. The full intensity beam injection to the upgraded AGS RF system with beam phase and radial feedbacks will be studied. It is shown that a beam phase feed-back is necessary in order to guarantee a predictable beam behavior after the first batch injection, otherwise the initial phase deviation for the following batch injections cannot be controlled. However, the effectiveness of the phase feedback control of the transient beam loading is limited by the associated emittance blow-up in the process. It is shown that a fast power amplifier feedback with a moderate gain can significantly reduce the transient effect of the bunched beam injection.
Analysis of Periodic Transient Beam Loading of the AGS
In this note, we discuss the multi-batch bunched ;beam loading during the injection from the Booster to the AGS. The full intensity beam injection to the upgraded AGS RF system with beam phase and radial feedbacks will be studied. It is shown that a beam phase feed-back is necessary in order to guarantee a predictable beam behavior after the first batch injection, otherwise the initial phase deviation for the following batch injections cannot be controlled. However, the effectiveness of the phase feedback control of the transient beam loading is limited by the associated emittance blow-up in the process. It is shown that a fast power amplifier feedback with a moderate gain can significantly reduce the transient effect of the bunched beam injection.
Analysis of Radiation Levels Associated with Operation of the RHIC Transfer Line
This note is intended to document calculations of prompt radiation dose in region exterior to berm which now exists over the Transfer Line between the AGS and the Relativistic Heavy Ion Collider.
Analysis of stream bed sediments of Four Mile Creek
Until 1988, solutions containing nitric acid, odium hydroxide, low levels of radionuclides (mostly tritiated water) and some metals were discharged to unlined seepage basins at the F and H Areas of the Savannah River Site (SRS) as part of normal operations. The basins are now being closed according to the Resource Conservation and Recovery Act (RCA). As part of the closure, a Part B Post-Closure Care Permit is being prepared. The Part B permit requires information on contaminant concentrations in stream bed sediments in the adjacent Four Mile Creek, which are reported herein. 5 refs., 1 fig., 2 tabs.
Analytical services: 222-S characterization of 242-A Evaporator Slurry, Campaign 94-1. Addendum 1A
During the 242-A Evaporator`s 94-1 campaign, five process samples were collected from the slurry stream for waste characterization. The five samples were collected over a 36 day time span, respectively on May 4, May 9, May 16, May 23, and June 9, 1994. Sample collections were performed per the protocol described in 242-A Evaporator Waste Analysis Plan, WHC-SD-WM-EV-060, Rev. 3 and in 242-A Evaporator Quality Assurance Project Plan, WHC-SD-WM-QAPP-009, Rev. 0. Slurry waste was characterized chemically and radiochemically by the Westinghouse Hanford Company, 222-S Laboratory as directed.
Anisotropy and spatial variation of relative permeability and lithologic character of Tensleep Sandstone reservoirs in the Bighorn and Wind River Basins, Wyoming. Second quarterly, second year, technical progress report, January 1, 1995--March 31, 1995
This study is designed to provide improvements in reservoir characterization techniques. Activities include: an examination of the spatial variation and anisotropy of relative permeability in the Tensleep Sandstone reservoirs of Wyoming; the placement of that variation and anisotropy into paleogeographic, depositional and diagenic frameworks; the development of pore system imagery techniques for the calculation of relative permeability; and reservoir simulations testing the impact of permeability and anisotropy on enhanced oil recovery. Results are described.
Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1997
In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1997.
Anti-Car Theft Act: Issues Concerning Additional Federal Funding of Vehicle Title System
A letter report issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO reviewed the Department of Justice's (DOJ) development and implementation of the National Motor Vehicle Title Information System (NMVTIS), focusing on: (1) the status of NMVTIS; and (2) whether DOJ had evaluated NMVTIS' expected costs and benefits to ensure that additional federal investment in NMVTIS is justified."
AOCM program 1992 to 1993 status report: Basilisk subscale laser experiments
This report summarizes the work performed by the Advanced Optical Counter Measures (AOCM) program from January 1992 to February 1993, funded by the US DOD and administered by the US Army`s Night Vision and Electro-optics Directorate (NVEOD). The AOCM program objective was the development of an advanced anti-sensor weapon system, the Basilisk laser. Basilisk is a high power, white light laser. Its compact size permits deployment on a variety of platforms, including the Bradley Fighting vehicle, where Basilisk would augment the Bradley`s conventional weapon systems. The effectiveness of Basilisk was recently demonstrated in a series of battlefield simulations, CTAS 2.5, where its Mission Defeat Score was eight times higher than lower energy anti-sensor laser systems. In November 1991, a five phase strategy was proposed to develop the Basilisk white light laser system. This report documents the experimental activities performed by the AOCM program and describes several major experimental milestones we achieved during the first year of funding. The focus of this report is on a series of subscale experiments to demonstrate key laser physics and engineering technologies.
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, December 13, 1995--March 12, 1996
This project has used a multi-disciplinary approach employing geology, geophysics, and engineering to conduct advanced reservoir characterization and management activities to design and implement an optimized infill drilling program at the North Robertson Unit. The activities during the first Budget Period, which is now complete, consisted of developing an integrated reservoir description from geological, engineering, and geostatistical studies, and using this description for reservoir flow simulation. Specific reservoir management activities have been identified and tested. The geologically targeted infill drilling program to be implemented during Budget Period II is a result of this work.
Appropriations for FY1998: Department of Transportation and Related Agencies
This report is the synopsis of selected DOT Programs and the House and Senate funding recommended for those programs.
APS logDaemon and client library
This document serves as a User`s Manual and Reference for the logDaemon and client library. This package provides a general distributed message logging system. A logDaemon may be started anywhere on a subnet. A client which has linked in the client library is provided functions to open a connection to the logDaemon, log messages, and close the connection. The logDaemon maintains one or more log files (in simple ASCII or SDDS format) and an e-mail list based on specifications in a configuration file. Incoming messages are logged to the appropriate file and/or result in e-mail being sent.
Aqueous samples from B-Plant, Tank 9-1
This document is the final report for the B-Plant Tank 9-1 sampling and analysis program. This report is divided into three parts: first, a narrative about the history, sampling effort, quality control, sample tracking/laboratory identification, and a summary of the analysis; second, sampling and custody data; and lastly, a set of compiled data from the laboratory analysis.
ARDEC transition armature study. Progress report No. 3, October 1--November 30, 1991
This third report covers the period October 1 to November 30, 1991. During this period the authors: (1) fabricated a test fixture for studying hybrid armature brush behavior, (2) reactivated a 140kJ, 1MA capacitor bank, (3) reactivated 25 channels digital data acquisition and reduction system and (4) concluded the use of a DNA funded railgun would serve as the most expedient means to acquire a railgun test bed. Fabrication of a plasma brush test fixture for studying the formation, evolution and stability of plasma brushes was completed. The fixture will serve to study plasma brush parameters, such as brush length and voltage drop, as a function of initial solid foil mass, gap size and current concentration. A 4OkV, 168{mu}f, 140kJ capacitor bank capable of providing more than 1MA of current was reactivated. (The LLNL bank had been developed for opening switch research which was successfully completed.) The bank will be used to power the test fixture with 10{mu}s, flat top current pulses. A 25 channel LeCroy digital data acquisition system interfaced to an LSI-11 and a Mini VAX computer was reactivated and brought on line to record the B-dot signals, voltages and current data from the test fixture. An evaluation of the most expedient means of obtaining a small bore railgun test bed for armature studies led to the conclusion that a portion of the DNA funded, LANL fabricated, LTS (Lethality Test System) railgun which was loaned to SNL, would be the best choice. A request to borrow the equipment for 3 years was initiated.
Armenia: Basic Facts
This report covers basic facts about Armenia like landmass, population size, and demographics.
Army Medium Trucks: Information on Delivery Delays and Corrosion Problems
A letter report issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO reviewed the Army's Family of Medium Tactical Vehicles (FMTV) program, focusing on: (1) the causes and effects of the contractor's delays in delivering acceptable trucks; and (2) the Army's actions to mitigate corrosion problems on FMTV trucks."
Ashcroft pressure switch - monitor for low SCHe purge pressure
No Description Available.
Ashcroft temperature switch and thermowell - tempered water cask inlet high temperature
No Description Available.
Ashcroft temperature switch for bay temperature
No Description Available.
An Assessment of Microtox^TM as a Biomonitoring Tool for Whole Effluent Testing for Los Alamos National Laboratory
Los Alamos National Laboratory (LANL) has special discharge problems relating to potential radioactive content of the effluent discharge waters. Because of this all testing must be performed on-site and results must be rapidly determined. There is a need to examine the development of a real-time procedure for effluent biomonitoring to met these site limitations. The Microtox{trademark} unit for toxicity testing is a microbially-based test system that shows great promise to be used for WET testing. The overall goal of this study is to develop an acceptable protocol for operational biomonitoring using the Microtox {trademark} toxicity test for LANL. The specific objectives include: development of an appropriate toxicity testing protocol using the Microtox{trademark} toxicity test for whole effluent toxicity testing and evaluation of the protocol based on factors such as sensitivity, response time, cost of analysis, and simplicity of operation.
An atmospheric tritium release database for model comparisons
A database of vegetation, soil, and air tritium concentrations at gridded coordinate locations following nine accidental atmospheric releases is described. The concentration data is supported by climatological data taken during and immediately after the releases. In six cases, the release data is supplemented with meteorological data taken at seven towers scattered throughout the immediate area of the releases and data from a single television tower instrumented at eight heights. While none of the releases caused a significant dose to the public, the data collected is valuable for comparison with the results of tritium transport models used for risk assessment. The largest, potential off-site dose from any of the releases was calculated to be 1.6 mrem. The population dose from this same release was 46 person-rem which represents 0.04 percent of the natural background dose to the population in the path of the release.
Audit of Department of Energy`s contractor liability insurance costs
Fifty-four of DOE`s major contractors reported expending $44.3 million in liability insurance costs for the last 3 years of operation. Purpose of this audit was to evaluate how DOE implemented its policy to assume the risk of losses for its contractors rather than to insure them commercially. Contractors are required to use self-insurance if combined annual premiums for commercial insurance exceed $10,000. Review of 18 major contractors showed that DOE was not consistently following its policy and that contractors using commercial insurance incurred higher costs. Required approvals were not always obtained prior to purchasing certain other types of liability insurance. It is recommended that DOE`s policies requiring self-insurance be fully implemented; that requests for approval for commercial insurance when annual premiums exceeded $10,000 be fully justified; and that the commercial insurance policies specifically define the liability coverage prior to approval and payment. It is also recommended that the contracts include clauses limiting reimbursements for insurance expenditures to actual losses and administrative costs.
B Plant Complex pollution prevention plan. Revision 1
The US Department of Energy (DOE) has directed Westinghouse Hanford Company (WHC) to develop an effective strategy to minimize the generation of hazardous, radioactive, and mixed wastes at Hanford in compliance with state and federal regulations. WHC has formalized a pollution prevention program composed of management policies, management requirements and procedures. This plan addresses pollution prevention for B Plant Complex. A pollution prevention team is in place and has been assigned responsibility for implementing the plan. This plan includes actions and goals for reducing volume and toxicity of waste generated, as well as a basis for evaluation of progress. Descriptions of waste streams, current specific goals, general pollution prevention methods, and specific accomplishments are in the appendices of this plan.
Ban of Use of Polygraph Evidence Does not amount to Abridgment of Military Defendant's Right to Present a Defense
This report is on Ban of Use of Polygraph Evidence Does not amount to Abridgment of Military Defendant's Right to Present a Defense.
Baratron MCO absolute pressure transmitter
No Description Available.
Bases for pump pit requirements calculations
A task team is preparing the Process Requirements for the interarea transfer pump pits at the Defense Waste Process Facility (DWPF). The team is developing requirements to prevent flammable mixtures from forming and requires values to use on the generation of various components such as benzene, hydrogen, and N20. The purpose of this memorandum is to document values to be used and to provide sample calculations using these values. There are no recommendations contained in this document.
Bases for Pump Pit Requirements Calculations
A task team is preparing the Process Requirements for the interarea transfer pump pits at the Defense Waste Process Facility (DWPF). The team is developing requirements to prevent flammable mixtures from forming and requires values to use on the generation of various components such as benzene, hydrogen, and N20. The purpose of this memorandum is to document values to be used and to provide sample calculations using these values. There are no recommendations contained in this document.