You limited your search to:

  Partner: UNT Libraries Government Documents Department
 Resource Type: Report
 Decade: 1990-1999
D-0 End Calorimeter Warm Tube/TeV Dry Air Purge

D-0 End Calorimeter Warm Tube/TeV Dry Air Purge

Date: August 14, 1991
Creator: Leibfritz, J.R. & /Fermilab
Description: This Engineering Note studies the design of the Dry Air Purge that is going to flow through the Warm Tube of the End Calorimeter of the D-O Calorimeter. The Tev tubes through the E.C. can be thought of as a cluster of concentric tubes: The Tev tube, the warm (vacuum vessel) tube, 15 layers of superinsulation, the cold (argon vessel) tube, and the Inner Hadronic center support tube. The Dry Air Purge will involve flowing Dry Air through the annular region between the Warm Tube and the Tev Beam Pipe. This air flow is intended to prevent condensation from forming in this region which could turn to ice under cryogenic temperatures. Any ice formed in this gap, could cause serious problems when these tubes are moved. The Air will flow through a Nylon Tube Fitting -1/4-inch I.D. to 1/8-inch male pipe thread (Cole Palmer YB-06465-15) see Drawing MC-295221 (Appendix A). This fitting will be attached to the Nylon 2-inch Tube-Wiper and Seal Assembly which is clamped to the ends of the Warm Tube (Appendix A). This note includes drawings and calculations that explain the setup of the Dry Air Purge and give the required information on the pressure drops through ...
Contributing Partner: UNT Libraries Government Documents Department
D-0 North End Cap Calorimeter Cold Test Results

D-0 North End Cap Calorimeter Cold Test Results

Date: August 2, 1990
Creator: Michael, J. & /Fermilab
Description: The North endcap calorimeter vessel was recieved on July 1, 1990. A cooldown of the pressure vessel with liquid nitrogen was performed on July 10-11 to check the vessel's integrity. With the pressure vessel cold, the insulating vacuum was monitored for leaks. Through out the testing, the insulating vacuum remained good and the vessel passed the test. The cold test was carried out per the procedures of D-Zero engineering note 3740.220-EN-250. The test was very similar to the cold test performed on the Central Calorimeter in October of 1987. Reference D-Zero engineering notes 3740.210-EN-122, 3740.000-EN107, and 3740.210-EN-110 for information about the CC cold test. The insulating vacuum space was pumped on while equipment was being connected to the pressure vessel. Two hours after starting to pump with the blower the vacuum space pressure was at about 210 microns. Pumping on the vacuum space for the next 15 hours showed no progress and a leak detector was connected to the pumping line. A leak check showed a leak in a thermocouple feedthru on the vacuum space relief plate. After fixing the leak, the pressure dropped to 16 microns in less than one hour. A rate of rise test was performed starting ...
Contributing Partner: UNT Libraries Government Documents Department
D-0 South End Cap Calorimeter Cold Test Results

D-0 South End Cap Calorimeter Cold Test Results

Date: November 26, 1990
Creator: Rucinski, R. & /Fermilab
Description: The South endcap calorimeter vessel was moved into Lab A on Sept. 18, 1990. A cooldown of the pressure vessel with liquid nitrogen was performed on Sept. 26 to check the vessel's integrity. With the pressure vessel cold, the insulating vacuum was monitored for leaks. Through out the testing, the insulating vacuum remained good and the vessel passed the test. The cold test was carried out per the procedures of D-Zero engineering note 3740.220-EN-250. The test was very similar to the cold test performed on the Central Calorimeter in October of 1987. The test of the ECS was performed in the same manner using the same equipment as the ECN cold test. Reference D-Zero engineering notes 3740.210-EN-122, 3740.000-EN-I07, and 3740.210-EN-II0 for information about the CC cold test. Reference EN-260 for the results of the ECN cold test. The insulating vacuum space was pumped on while equipment was being connected to the pressure vessel. Two hours after starting to pump with the blower the vacuum space pressure was at about 40 microns. The pumping continued overnight (another 16 hours). In the morning the pressure was 11.5 microns. A rate of rise test was performed. With the pump valved off, the pressure ...
Contributing Partner: UNT Libraries Government Documents Department
1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

Date: October 3, 1997
Creator: Ferguson, J.E., Westinghouse Hanford, Richland, WA
Description: Manage the Site Systems Engineering process to provide a traceable, integrated, requirements-driven, and technically defensible baseline., Through the Site Integration Group, Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering`s primary interfaces are with the Project Direction Office and with the projects, as well as with the Planning organization.
Contributing Partner: UNT Libraries Government Documents Department
1.8.3 Site system engineering FY 1997 program plan

1.8.3 Site system engineering FY 1997 program plan

Date: September 13, 1996
Creator: Grygiel, M. L.
Description: The FY 1997 Multi-Year Work Plan (MYWP) technical baseline describes the functions to be accomplished and the technical standards that govern the work. The following information is provided in this FY 1997 MYWP: technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year.
Contributing Partner: UNT Libraries Government Documents Department
A 1-kW power demonstration from the advanced free electron laser

A 1-kW power demonstration from the advanced free electron laser

Date: August 1997
Creator: Sheffield, R. L.; Conner, C. A. & Fortgang, C. M.
Description: This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured.
Contributing Partner: UNT Libraries Government Documents Department
1: Mass asymmetric fission barriers for {sup 98}Mo; 2: Synthesis and characterization of actinide-specific chelating agents

1: Mass asymmetric fission barriers for {sup 98}Mo; 2: Synthesis and characterization of actinide-specific chelating agents

Date: August 1, 1996
Creator: Veeck, A. C.
Description: Excitation functions have been measured for complex fragment emission from the compound nucleus {sup 98}Mo, produced by the reaction of {sup 86}Kr with {sup 12}C. Mass asymmetric fission barriers have been obtained by fitting the excitation functions with a transition state formalism. The extracted barriers are {approximately} 5.7 MeV higher, on average, than the calculations of the Rotating Finite Range Model (RFRM). These data clearly show an isospin dependence of the conditional barriers when compared with the extracted barriers from {sup 90}Mo and {sup 94}Mo. Eleven different liquid/liquid extractants were synthesized based upon the chelating moieties 3,2-HOPO and 3,4-HOPO; additionally, two liquid/liquid extractants based upon the 1,2-HOPO chelating moiety were obtained for extraction studies. The Pu(IV) extractions, quite surprisingly, yielded results that were very different from the Fe(III) extractions. The first trend remained the same: the 1,2-HOPOs were the best extractants, followed closely by the 3,2-HOPOs, followed by the 3,4-HOPOs; but in these Pu(IV) extractions the 3,4-HOPOs performed much better than in the Fe(III) extractions. 129 refs.
Contributing Partner: UNT Libraries Government Documents Department
A-01 metals in stormwater runoff evaluation

A-01 metals in stormwater runoff evaluation

Date: November 6, 1997
Creator: Eldridge, L. L.
Description: As a part of the A-01 investigation required by the NPDES permit, an investigation was performed to ascertain the concentrations of metals specifically copper (Cu), lead (Pb), and zinc (Zn) in stormwater being discharged through the outfall. This information would indicate whether all water being discharged would have to be treated or if only a portion of the discharged stormwater would have to be treated. A study was designed to accomplish this. The first goal was to determine if the metal concentrations increased, decreased, or remained the same as flow increased during a rain event. The second goal was to determine if the concentrations in the storm water were due to dissolved. The third goal was to obtain background data to ascertain if effluent credits could be gained due to naturally occurring metals.Samples from this study were analyzed and indicate that the copper and lead values increase as the flow increases while the zinc values remain essentially the same regardless of the flow rate. Analyses of samples for total metals, dissolved metals, TSS, and metals in solids was complicated because in all cases metals contamination was found in the filters themselves. Some conclusions can be derived if this problem is ...
Contributing Partner: UNT Libraries Government Documents Department
2-1/2-D electromagnetic modeling of nodular defects in high-power multilayer optical coatings

2-1/2-D electromagnetic modeling of nodular defects in high-power multilayer optical coatings

Date: July 1996
Creator: Molau, N. E.; Brand, H. R.; Kozlowski, M. R. & Shang, C. C.
Description: Advances in the design and production of high damage threshold optical coatings for use in mirrors and polarizers have been driven by the design requirements of high-power laser systems such as the proposed 1.8-MJ National Ignition Facility (NIF) and the prototype 12- kJ Beamlet laser system. The present design of the NIF will include 192 polarizers and more than 1100 mirrors. Currently, the material system of choice for high-power multilayer optical coatings with high damage threshold applications near 1.06 {mu}m are e-beam deposited HfO{sub 2}/Si0{sub 2} coatings. However, the optical performance and laser damage thresholds of these coatings are limited by micron-scale defects and insufficient control over layer thickness. In this report, we will discuss the results of our 2-1/2-D finite-element time- domain (FDTD) EM modeling effort for rotationally-symmetric nodular defects in multilayer dielectric HR coatings. We have added a new diagnostic to the 2-1/2-D FDTD EM code, AMOS, that enables us to calculate the peak steady-state electric fields throughout a 2-D planar region containing a 2-D r-z cross-section of the axisymmetric nodular defect and surrounding multilayer dielectric stack. We have also generated a series of design curves to identify the range of loss tangents for Si0{sub 2} and HfO{sub ...
Contributing Partner: UNT Libraries Government Documents Department
(02.2) Scoping experiments; (02.3) long-term corrosion testing and properties evaluation of candidate waste package basket material

(02.2) Scoping experiments; (02.3) long-term corrosion testing and properties evaluation of candidate waste package basket material

Date: December 20, 1996
Creator: VanKonynenburg, R. A.
Description: The work described in this activity plan addresses Information Need 2.7.3 of the Yucca Mountain Site Characterization Plan (l), which reads Determination that the design criteria in lOCFR60.130 through 60.133 and any appropriate additional design objectives pertaining to criticality control have been met. This work falls under section WBS 1.2.2.5 2 (Basket Materials) of WBS 1.2.2.5 (Waste Package Materials) in the Work Breakdown Structure of the Yucca Mountain Site Characterization Project.
Contributing Partner: UNT Libraries Government Documents Department
FIRST PREV 1 2 3 4 5 NEXT LAST