You limited your search to:

  Partner: UNT Libraries Government Documents Department
 Resource Type: Report
 Decade: 1960-1969
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System

30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System

Date: January 31, 1962
Creator: unknown
Description: Final design for the 30 megawatt intermediate heat exchanger and steam generator.
Contributing Partner: UNT Libraries Government Documents Department
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis

30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis

Date: February 28, 1962
Creator: unknown
Description: Chemical engineering analysis and stress analysis for design of the 3 megawatt intermediate heat exchanger and steam generator for service with a liquid sodium heat transfer fluid.
Contributing Partner: UNT Libraries Government Documents Department
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures

30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures

Date: May 15, 1962
Creator: unknown
Description: Operation and maintenance procedures for 30 megawatt heat exchanger and steam generator for sodium cooled reactor system.
Contributing Partner: UNT Libraries Government Documents Department
I-131 in milk from Cabriolet fallout

I-131 in milk from Cabriolet fallout

Date: March 31, 1966
Creator: Tamplin, A.
Description: No abstract available.
Contributing Partner: UNT Libraries Government Documents Department
200-Mwe Prototype Large SGR: Reactor Structure Design and Evaluation

200-Mwe Prototype Large SGR: Reactor Structure Design and Evaluation

Date: 1965
Creator: North American Aviation. Atomics International Division.
Description: From abstract: This document presents the reactor structure design and evaluation for a 200-Mwe prototype large SGR.
Contributing Partner: UNT Libraries Government Documents Department
300,000-KWE SGR Nuclear Power Plant of Current Technology

300,000-KWE SGR Nuclear Power Plant of Current Technology

Date: August 1, 1960
Creator: Renard, J.; Peckinpaugh, C. L. & Aronstein, R. E.
Description: Abstract: This report describes a 300,000-kwe, sodium-cooled, graphite-moderated nuclear power plant based on existing technical information.
Contributing Partner: UNT Libraries Government Documents Department
EEN-307, Irradiation of units at low temperature test

EEN-307, Irradiation of units at low temperature test

Date: April 13, 1960
Creator: Guthrie, J.B.
Description: EWR-ESE-144, Fifty MC-890 type final assemblies were subjected to irradiation at low temperature test in order to determine if irradiation would reduce the frequency of high voltage breakdowns. A control lot of a like number of units was subjected to low temperature test in the same manner except without irradiation.
Contributing Partner: UNT Libraries Government Documents Department
EN-318 evaluation of slow warm-up through special test of MC-890 type power supplies

EN-318 evaluation of slow warm-up through special test of MC-890 type power supplies

Date: September 1, 1960
Creator: Ling, R.F.
Description: ESE-171: This EN run was made to determine if there is any relationship between the H-5 transistor electrical characteristics, the assembly processes, and slow warm-up of the MC-890 Power Supply. Included is the test data on the H-5 transistors and the results of the High Temperature Life Test (185 {degrees}F) of 380 MC-890 Power Supplies.
Contributing Partner: UNT Libraries Government Documents Department
EEN-333, revised getter flash procedure

EEN-333, revised getter flash procedure

Date: June 28, 1960
Creator: Brown, W.C.
Description: EWR No. VTE-188--Tubes processed by flashing getters immediately prior to seal-off from vacuum systems are compared for total residual gas pressure to tubes processed by flashing getters after tubes were sealed off vacuum systems. Comparisons of residual pressures determined from current flows in the cold cathode ion gauge.
Contributing Partner: UNT Libraries Government Documents Department
1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1

1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1

Date: February 14, 1964
Creator: General Electric Company
Description: From introduction: "Summary report of the 1000 MWe Boiling Water Reactor Plant Feasibility Study performed by the General Electric Company."
Contributing Partner: UNT Libraries Government Documents Department
1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2

1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2

Date: February 14, 1964
Creator: General Electric Company
Description: From introduction: "Presents the detailed description of a 1000 MW Electric Power Plant employing one or two Boiling Water Reactors as the steam source."
Contributing Partner: UNT Libraries Government Documents Department
1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3

1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3

Date: February 14, 1964
Creator: General Electric Company
Description: From introduction: "Contains the appendices and a complete set of drawings related to the 1000 MWe Boiling Water Reactor Plant Feasibility Study performed by the General Electric Company for the United States Atomic Energy Commission."
Contributing Partner: UNT Libraries Government Documents Department
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 1

1000-MWe LMFBR Follow-On Study, Task I Report: Volume 1

Date: June 1967
Creator: Goulding, B. J.
Description: From introduction: "The objective of this study is to provide information that will assist the Atomic Energy Commission in furthering the National Liquid Metal Fast Breeder Reactor (LMFBR) Program. We plan to accomplish this end, in part, by extending the original studies to include system and component design and parametric evaluations of the nuclear steam supply system and its related systems and subsystems based on a n estimation of the state of technology in 1980."
Contributing Partner: UNT Libraries Government Documents Department
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 2, Concept I System Description

1000-MWe LMFBR Follow-On Study, Task I Report: Volume 2, Concept I System Description

Date: April 1967
Creator: Boyer, R. L.
Description: From introduction: "This report has been prepared in conjunction with the Liquid Metal Fast Breeder Reactor (LMFBR) Follow-On Study. It is the Concept I description of Task I as outlined by Argonne National Laboratory (ANL) in Appendix C of their Follow-On Study Program."
Contributing Partner: UNT Libraries Government Documents Department
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 3, Concept IV System Description

1000-MWe LMFBR Follow-On Study, Task I Report: Volume 3, Concept IV System Description

Date: June 1967
Creator: Goulding, B. J.
Description: From introduction: "This report has been prepared in conjunction with the Liquid Metal Fast Breeder Reactor (LMFBR) Follow-On Study. It is the Concept II description of Task I as outlined by Argonne National Laboratory (ANL) in Appendix C of their Follow-On-Study Program."
Contributing Partner: UNT Libraries Government Documents Department
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 4, Concept III System Description

1000-MWe LMFBR Follow-On Study, Task I Report: Volume 4, Concept III System Description

Date: July 1967
Creator: Goulding, B. J.
Description: From introduction: "The third of four designs to be developed by Babcock & Wilcox (B&W), Concept III observes ground rules established under the LMFBR Follow-On Program and is based on the estimated state of technology in 1980."
Contributing Partner: UNT Libraries Government Documents Department
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description

1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description

Date: August 1967
Creator: Goulding, B. J.
Description: From introduction: "The last of four designs to be developed by Babcock & Wilcox (B&W), Concept IV observes ground rules established under the LMFBR Follow-On Program and is based on the estimated state of technology in 1980."
Contributing Partner: UNT Libraries Government Documents Department
The 1958 He4 Scale of Temperatures: Part 1. Introduction, Part 2. Tables for the 1958 Temperature Scale

The 1958 He4 Scale of Temperatures: Part 1. Introduction, Part 2. Tables for the 1958 Temperature Scale

Date: June 17, 1960
Creator: Brickwedde, F. G. (Ferdinand Graft), 1903-; van Dijk, H.; Durieux, M.; Clement, J. R. & Logan, J. K.
Description: Report containing information regarding He4 vapor pressure measurement as of 1958, the recent history of the vapor pressure temperature scale, and a series of tables containing these measurements.
Contributing Partner: UNT Libraries Government Documents Department
1965 audit of SRP radioactive waste

1965 audit of SRP radioactive waste

Date: May 1, 1966
Creator: Ashley, C.
Description: This report summarizes releases of radioactive waste to the environs of the Savannah River Plant during the calendar year 1965. Total quantities of radioactive waste released from plant startup through 1965 are also reported. Accuracy is not always implied to the degree indicated by the number of significant figures reported. Values were not rounded off, since data will be used in future cumulative summaries. No explanations are given for unusual releases; this information may be found in the Radiological and Environmental Sciences Division Monthly Reports and in the Semi- annual and Annual Environmental Monitoring Reports for 1965.
Contributing Partner: UNT Libraries Government Documents Department
6144-Channel Time-of-Flight Analyzer

6144-Channel Time-of-Flight Analyzer

Date: September 1964
Creator: Walker, R. A. & Russell, J. T.
Description: Report describing a 6144-channel analyzer designed and built for the purpose of analyzing time-of-flight during studies of slow neutron scattering at Hanford Laboratories. This includes descriptions of the analyzer, its logic and circuits, and its test mode.
Contributing Partner: UNT Libraries Government Documents Department
630A Maritime Nuclear Steam Generator Scoping Study

630A Maritime Nuclear Steam Generator Scoping Study

Date: April 6, 1962
Creator: unknown
Description: From foreword: This report presents the results of a study of a nuclear steam generator which uses reactor technology during the aircraft nuclear propulsion program to produce superheated steam for marine propulsion.
Contributing Partner: UNT Libraries Government Documents Department
630A Maritime Nuclear Steam Generator: Status Report Number 1

630A Maritime Nuclear Steam Generator: Status Report Number 1

Date: September 12, 1963
Creator: unknown
Description: From foreword: The primary purpose of this document is to set forth the current status of the 630A Nuclear Steam Generator, under development for the U.S. AEC.
Contributing Partner: UNT Libraries Government Documents Department
909B high energy gull generator

909B high energy gull generator

Date: December 31, 1960
Creator: Stephens, W. H.
Description: No abstract available.
Contributing Partner: UNT Libraries Government Documents Department
Abscissas and Weights for Guassian Quadrature For N=2 to 100, and N-125, 150, 175, 200

Abscissas and Weights for Guassian Quadrature For N=2 to 100, and N-125, 150, 175, 200

Date: December 28, 1966
Creator: Love, Carl H.
Description: The abscissas and weights for Gaussian Quadrature of order N = 2 to 100,and N = 125, 150, 175, and 200 are given. The abscissas are given to twenty-four places and the error is estimated to be no more than 1 unit in the last place. The weights are given to twenty-three places and the error is estimated to be no more than 1 unit in the last place.
Contributing Partner: UNT Libraries Government Documents Department
FIRST PREV 1 2 3 4 5 NEXT LAST