15 Mile Road/Edison Corridor Sewer Tunnel Failure Study, Detroit Area, Michigan

Description: Partial abstract: "The study consisted of field and laboratory investigations, construction evaluation, and geotechnical and structural analyses to determine the cause(s) of distress and failure of a 2600-ft section of 12-ft 9-in. diameter concrete-lined sanitary sewer tunnel in the Detroit, Mich., area. [...] The report includes summaries of all pertinent construction records, results of all pertinent past and current field and laboratory tests on construction and geotechnical materials, and… more
Date: January 1981
Creator: Albert, Dick; Hoff, George C.; Lorence, Brian; Mitchell, Gerald B.; Mlakar, Paul F.; Murphy, William L. et al.
open access

20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission

Description: Introduction: In September of 156, Gilbert Associates, Inc., entered into a contract with the United States of America, acting through the United States Atomic Energy Commission, for the study and preliminary design of a nuclear power plant being considered for integration into a central station power system at an overseas site.
Date: July 7, 1957
Creator: Gilbert Associates, Inc.
open access

"25" Critically Consultation with J. W. Morfitt : April 3, 1950

Description: Summary: "Criticality was considered impossible in any contingency encountered in practice under either of the following conditions which include no safety factor: (a) In any isolated cylinder not more than 5 in. in disruptor, if the total amount of U235 present does not exceed 7.5 Eg. (b) In an isolated vessel of any shape and size, if the total amount of U235 present does not exceed 880 g. An "isolated" vessel is one which does not "see" more than 0.1 [...] other vessels containing fissionabl… more
Date: April 3, 1950
Creator: Merrill, E. T. & Sege, G.
open access

80" Bubble Chamber Expansion System Preliminary Operating Procedures

Description: These procedures are intended to be used for the initial operation of the expansion system and serve as a basis for a more complete and revised form to be written once operating experience has been gained. An attempt has been made to offer a logical and systematic presentation to facilitate operation and maintenance of the system by the operating personnel. Thus, the sequence of valve actuations has been presented in matrix and check list form to minimize errors; this also has the advantage of … more
Date: January 7, 1964
Creator: Goodzeit, C. L.
open access

80" Bubble Chamber Expansion System Summary of Piston Motion Studies

Description: Prior to assembly into the 80" bubble chamber, the expansion system was subjected to a series of tests to check piston dynamics and gain information on the reliability of the various components. Furthermore, the rest provided operating personnel with the opportunity to become familiar with the operation and maintenance of the expansion system. Two separate tests were performed with the apparatus that was located at the north end of the AGS experimental area; one during the week of Oct. 15 and t… more
Date: January 7, 1964
Creator: Goodzeit, C. L.
open access

80" Chamber - Low Energy Beams

Description: One of the major, as well as first, decisions which must be taken on a large chamber is to decide on the direction of the magnetic field, i.e., vertical or horizontal. Either alternative has advantages and disadvantages ad it is the intention of this note to discuss these features.
Date: January 3, 1964
Creator: Rau, R. R.
open access

100-N Decontamination Facility Design Guide.

Description: Space has been reserved near the southeast corner of the 100-N Area for the 122-N Decontamination Facility. Previous correspondence between Burns and Roe, Inc and General Electric bae discussed various facilities which might be needed in the building. The concepts of the decontamination processes are under active development by research groups at Hanford. At present, there are several workable processes known; each one has one or more fairly serious drawbacks.
Date: March 8, 1960
Creator: Bainard, W. D.