UNT Libraries Government Documents Department - 32,736 Matching Results

Search Results

open access

80" Bubble Chamber Expansion System Preliminary Operating Procedures

Description: These procedures are intended to be used for the initial operation of the expansion system and serve as a basis for a more complete and revised form to be written once operating experience has been gained. An attempt has been made to offer a logical and systematic presentation to facilitate operation and maintenance of the system by the operating personnel. Thus, the sequence of valve actuations has been presented in matrix and check list form to minimize errors; this also has the advantage of … more
Date: January 7, 1964
Creator: Goodzeit, C. L.
open access

80" Bubble Chamber Expansion System Summary of Piston Motion Studies

Description: Prior to assembly into the 80" bubble chamber, the expansion system was subjected to a series of tests to check piston dynamics and gain information on the reliability of the various components. Furthermore, the rest provided operating personnel with the opportunity to become familiar with the operation and maintenance of the expansion system. Two separate tests were performed with the apparatus that was located at the north end of the AGS experimental area; one during the week of Oct. 15 and t… more
Date: January 7, 1964
Creator: Goodzeit, C. L.
open access

80" Chamber - Low Energy Beams

Description: One of the major, as well as first, decisions which must be taken on a large chamber is to decide on the direction of the magnetic field, i.e., vertical or horizontal. Either alternative has advantages and disadvantages ad it is the intention of this note to discuss these features.
Date: January 3, 1964
Creator: Rau, R. R.
open access

100-N Decontamination Facility Design Guide.

Description: Space has been reserved near the southeast corner of the 100-N Area for the 122-N Decontamination Facility. Previous correspondence between Burns and Roe, Inc and General Electric bae discussed various facilities which might be needed in the building. The concepts of the decontamination processes are under active development by research groups at Hanford. At present, there are several workable processes known; each one has one or more fairly serious drawbacks.
Date: March 8, 1960
Creator: Bainard, W. D.
open access

The 300 H.P. Benz Aircraft Engine

Description: This report provides a description of the Benz 300 H.P. aircraft engine containing 12 cylinders placed at a 60° angle. It includes a detailed description of the development of the constructional points, particularly the cylinders, pistons, and connecting rods, as well as the engine fitting, lubrication, oil pumps, bearings, oil tank, fuel pump, carburetors, and cooling system. There are seven pages of illustrative figures at the end of the report.
Date: January 1921
Creator: Heller, A.
open access

300-KV Pulser Transformer and Pulser.

Description: Photographs and working drawings are presented for a small (approximately 4.25 X 7 X 9 inch) 300Kv pulse transformer having double-conical secondaries each with a corona ring at its greatest diameter. The pulser circuit is shown but no text is included.
Date: November 1951
Creator: Heller, R. E.
open access

327 Basin Aluminum Corrosion Test

Description: An investigation of corrosion in the 327 Building's water storage basin was made to determine whether the static storage of aluminum jacketed fuel elements could cause corrosion effects that would interfere with studies of in-pile corrosion.
Date: February 9, 1956
Creator: Mallett, G. R.
open access

568 Report

Description: Final report for a grant contract documenting information about the scope of the project and results.
Date: 1960
Creator: Pollard, Ernest C. (Ernest Charles), 1906-1997
open access

709 Program for Reduction of Exponential Pile Data

Description: A multi-purpose program for processing exponential data has been prepared for the 709 computer. The main purposes of the program is to compute the material buckling from raw data (given counts, time, and counter information) or from previously calculated Athermal's. It is also possible to compute only CeCh (end and harmonic corrections) for a given B11 or series if B11's no counting data being entered. In every case, pile measurements must be submitted as input for corrections.
Date: August 20, 1959
Creator: Matsumoto, D. D.
Back to Top of Screen