UNT Libraries Government Documents Department - 144 Matching Results

Search Results

Primary view of Health and Safety Laboratory Environmental Quarterly Report: June 1, 1977 - September 1, 1977
Hardy, Edward P., Jr.
October 1, 1977
Primary view of Health and Safety Laboratory Environmental Quarterly Report: October 1, 1977, Appendix
HASL (New York, N.Y.)
October 1, 1977
Primary view of Molten-Salt Reactor Program Semiannual Progress Report, February 28, 1971
Oak Ridge National Laboratory
August 1971
Primary view of Analytical Chemistry Division Annual Progress Report, May 20, 1970
Oak Ridge National Laboratory
September 1970
Primary view of Siting of Fuel Reprocessing Plants and Waste Management Facilities
Oak Ridge National Laboratory. Chemical Technology Division.
July 1970
Primary view of Chemical Technology Division Annual Progress Report: for Period Ending May 31, 1969
Oak Ridge National Laboratory. Chemical Technology Division.
October 1969
Primary view of Health Physics Division Annual Progress Report, July 31, 1969
Oak Ridge National Laboratory. Health Physics Division.
October 1969
Primary view of A Revision of Computer Code POWERCO (Cost of Electricity Produced by Nuclear Power Stations) to Include Breakdowns of Power Cost and Fixed Charge Rates
Salmon, Royes
August 1969
Primary view of Fuels and Materials Development Program Quarterly Progress Report, September 30, 1968
Oak Ridge National Laboratory. Metals and Ceramics Division.
February 1969
Primary view of Instrumentation and Controls Division Annual Progress Report, September 1, 1968
Oak Ridge National Laboratory. Instrumentation and Controls Division.
February 1969
Primary view of Molten-Salt Reactor Program Semiannual Progress Report for Period Ending August 31, 1968
Oak Ridge National Laboratory
February 1969
Primary view of Oak Ridge Analytical Chemistry Division Annual Progress Report: 1961
Oak Ridge National Laboratory
November 1968
Primary view of Chemical Technology Division Annual Progress Report, May 31, 1968
Oak Ridge National Laboratory. Chemical Technology Division.
September 1968
Primary view of Instrumentation and Controls Division Annual Progress Report for the Period Ending September 1, 1966
Borkowski, C. J.; Dandl, R. A.; Epler, E. P. & Harrill, C. S.
June 1967
Primary view of The Biocoenetic Process in an Estuarine Phytoplankton Community
Patten, Bernard C.
October 1966
Primary view of A Comparison of Gas-Turbine and Steam-Turbine Power Plants for Use with All-Ceramic Gas-Cooled Reactors
Fraas, A. P. & Ozisik, M. N.
July 1965
Primary view of Engineering Development of a Foam Column for Countercurrent Surface-Liquid Extraction of Surface-Active Solutes
Haas, P. A.
June 1965
Primary view of Gas-Cooled Reactor Project Semiannual Progress Report: March 1965
Trauger, D. B. & Whitman, G. D.
June 1965
Primary view of Laboratory Development of Processes for Fixation of High-Level Radioactive Waste in Glassy Solids. [Part] 3, Wastes from the Purex Solvent Extraction Process
Clark, W. E.; Godbee, H. W. & Fitzgerald, C. L.
June 1965
Primary view of Molten-Salt Reactor Program Semiannual Progress Report for Period Ending February 28, 1965
Briggs, R. B.
June 1965
Primary view of Type 316 Stainless Steel, Inconel, and Haynes Alloy No. 25 Natural-Circulation Boiling-Potassium Corrosion Test Loops
Jansen, D. H. & Hoffman, E. E.
June 1965
Primary view of Review of Radioisotopes Program, 1964
Gillette, J. H.
May 1965
Primary view of Measurement of α, the Ratio of the Neutron Capture Cross Section to the Fission Cross Section, for ²³⁵U in the Energy Region from 3.25 eV to 1.8 keV
deSaussure, G.; Weston, L. W.; Gwin, R.; Russell, J. E. & Hockenbury, R. W.
April 1965
Primary view of Optical Mapping of Oak Ridge Research Reactor Experiment Tubes
Abbatiello, A. A.
April 1965
Back to Top of Screen