UNT Libraries Government Documents Department - 905 Matching Results

Search Results

Primary view of 3 Plant Radiation Study Interim Report #5- Part II Data on Gamma Shielding of Special Plutonium Samples
Moulthrop, H. A.
October 22, 1959
Primary view of "25" Critically Consultation with J. W. Morfitt : April 3, 1950
Merrill, E. T. & Sege, G.
April 3, 1950
Primary view of 100-N Decontamination Facility Design Guide.
Bainard, W. D.
March 8, 1960
Primary view of 327 Basin Aluminum Corrosion Test
Mallett, G. R.
February 9, 1956
Primary view of 709 Program for Reduction of Exponential Pile Data
Matsumoto, D. D.
August 20, 1959
Primary view of 1706 KE Water Treatment for Out-of-Reactor Test Facilities.
Demmitt, Thomas F.
March 30, 1959
Primary view of 1706-KER Coolant Test Facility Operations Manual
Dulin, R. V.
January 23, 1958
Primary view of An Abrasive Cutoff Machine for Metallurgical Research on Radioactive Materials
Boyd, C. L.
January 5, 1957
Primary view of Abrasive Cutting of Irradiated Uranium
Boyd, Carl L.
September 17, 1953
Primary view of The Absorption and Translocation of Several Fission Elements by Russian Thistle
Selders, A. A.
June 8, 1950
Primary view of Absorption by Soil of Strontium From 216-S Crib Waste
Rhodes, D. W.
February 15, 1956
Primary view of Absorption Characteristics of Long Soil Columns
McHenry, J. R.
May 1, 1955
Primary view of The Abundance of the Principle Crustacea of the Columbia River and the Radioactivity They Contain
Coopey, R. W.
June 25, 1953
Primary view of The Accumulation of Radioactivity as Shown by a Limnological Study of the Columbia River in the Vicinity of Hanford Works : Preliminary Report
Coopey, R. W.
November 12, 1948
Primary view of Accumulation of Radioactivity in Columbia River Fish in the Vicinity of the Hanford Works
Olson, P. A., Jr. & Foster, Richard F.
July 1, 1952
Primary view of Accuracy of Volume Measurements in a Large Process Vessel
Pleasance, C. L.
October 19, 1959
Primary view of Action Taken on the Spot Contamination in the Separations Plant Areas
Parker, H. M.
October 30, 1947
Primary view of An Addendum to a Parametric Study of the Gas-Cooled Reactor Concept
Hanford Works
March 1, 1958
Primary view of Addendum to Report HW-30390:  Estimated Power Generation in MTR Slug Test Facility
Neumann, Hans, 1936-
September 20, 1954
Primary view of The Aeolotropic Elastic Relations for Uranium Crystals
Merckx, K. R.
December 17, 1954
Primary view of Air Leakage Through Labyrinth Seals
McCarthy, P. B.
April 8, 1955
Primary view of Air Sample Activity vs Flow Rate
Clark, R. G.
December 27, 1954
Primary view of All In-Well Permeability Testing Packer
Raymond, J. R.
September 29, 1959
Primary view of An Alpha, Beta, Gamma Hand and Shoe Counter - Model 2
Spear, W. G.
June 2, 1958
Back to Top of Screen