UNT Libraries Government Documents Department - 5,474 Matching Results

This system will be undergoing maintenance May 23rd between 9:00AM and 12:00PM CDT.

Search Results

open access

The Y-Nd and Sc-Nd Phase Systems

Description: Technical report. From Introduction : "In a recent study by Spedding, et al. on some rare earth alloy systems, an intermediate phase was found to form when a light rare earth (ABAC stacking) was alloyed with a heavy rare earth (ABAC stacking). This intermediate phase was found to have the structure of samarium metal with the stacking ABABCBCAC and was designated "delta". Since the cause of this rather unusual structure occurring in either samarium metal or these alloys is not known the study of… more
Date: February 1964
Creator: Beaudry, B. J.; Michel, M.; Daane, A. H. & Spedding, F. H.
open access

Yankee Core Evaluation Program Quarterly Progress Report: June-September 1962

Description: Quarterly report regarding the activities of the Yankee Core Evaluation Program, the purpose of which is to evaluate the performance of the core used in the Yankee Plant and to compare actual performance with predictions, as well as the revision of designs to address any differences between actual and predicted performance.
Date: October 26, 1962
Creator: Westinghouse Electric Corporation. Atomic Power Division.
open access

Yankee Core Evaluation Program Quarterly Progress Report: October-December 1962

Description: Quarterly report regarding the activities of the Yankee Core Evaluation Program, the purpose of which is to evaluate the performance of the core used in the Yankee Plant and to compare actual performance with predictions, as well as the revision of designs to address any differences between actual and predicted performance.
Date: February 1963
Creator: Westinghouse Electric Corporation. Atomic Power Division.
open access

Yankee Core Evaluation Program Quarterly Progress Report: January-March 1963

Description: Quarterly report regarding the activities of the Yankee Core Evaluation Program, the purpose of which is to evaluate the performance of the core used in the Yankee Plant and to compare actual performance with predictions, as well as the revision of designs to address any differences between actual and predicted performance.
Date: March 1965
Creator: Westinghouse Electric Corporation. Atomic Power Division.
open access

Yankee Core Evaluation Program Quarterly Progress Report: April-June 1963

Description: Quarterly report regarding the activities of the Yankee Core Evaluation Program, the purpose of which is to evaluate the performance of the core used in the Yankee Plant and to compare actual performance with predictions, as well as the revision of designs to address any differences between actual and predicted performance.
Date: July 1963
Creator: Westinghouse Electric Corporation. Atomic Power Division.
open access

Yankee Core Evaluation Program Quarterly Progress Report: January-March 1964

Description: Quarterly report regarding the activities of the Yankee Core Evaluation Program, the purpose of which is to evaluate the performance of the core used in the Yankee Plant and to compare actual performance with predictions, as well as the revision of designs to address any differences between actual and predicted performance.
Date: April 1964
Creator: Westinghouse Electric Corporation. Atomic Power Division.
open access

Yankee Core Evaluation Program Quarterly Progress Report: October-December 1964

Description: Quarterly report regarding the activities of the Yankee Core Evaluation Program, the purpose of which is to evaluate the performance of the core used in the Yankee Plant and to compare actual performance with predictions, as well as the revision of designs to address any differences between actual and predicted performance.
Date: January 1965
Creator: Westinghouse Electric Corporation. Atomic Power Division.
open access

Yankee Core Evaluation Program Quarterly Progress Report: January-March 1965

Description: Quarterly report regarding the activities of the Yankee Core Evaluation Program, the purpose of which is to evaluate the performance of the core used in the Yankee Plant and to compare actual performance with predictions, as well as the revision of designs to address any differences between actual and predicted performance.
Date: April 1965
Creator: Westinghouse Electric Corporation. Atomic Power Division.
open access

Yankee Core Evaluation Program Quarterly Progress Report: July-September 1963

Description: From introduction: The potential of this study as a basis for the evaluation of reactor core design methods is very great. It represents the first opportunity of its kind in relation to the design of low enriched, uranium fueled, light water moderated reactors. Sufficient information should be available to obtain a good fit between the experimental results and a combination of basic physical data and computer programs. The degree of accuracy of this fit will be evaluated. This information will … more
Date: October 1963
Creator: Chajson, L.
open access

αZ Correction to the Bethe-Maximon Pair Production Cross Section

Description: From abstract: "The first order correction in αZ to the Bethe-Maximon pair production cross section is calculated for the case where the incident photon and one of the electrons has an energy much greater than mc2. Comparison of these calculations to the experimental data of Plimpton and Hammer shows an improvement ina greement between theory and experiment of approximately a factor of 1+(αZ4π/15) for low positron kinetic energies. However, for positron kinetic energies of the order of 1 Mev no… more
Date: March 21, 1962
Creator: Moroi, David S. & Hammer, C. L.
open access

Zero Power Experiments for the SM-1 Core II : Task XV

Description: Abstract: An element by element reactivity check for SM-1 Core II fuel elements and control rod absorber sections was performed and the burnable nuclear poison loading in the SM-1 Core II stationary fuel elements was established. An approach to criticality of the SM-1 Core II was performed by the inverse multiplication method and the critical rod bank position obtained as a function of fuel loading up to the full SM-1 Core II loading. Maximum and minimum core reactivity measurements were obtai… more
Date: March 15, 1960
Creator: Robinson, R. A.; Weiss, S. H.; McCool, W. J. & Schrader, E. W.
open access

Zircaloy Cladding Thickness Testers

Description: Technical report. From Abstract : "A number of similar eddy current instruments were developed to measure the thickness of Zircaloy over uranium metal in the range of 5 to 25 mils, Zircaloy over UO2 in the range of 20 to 40 mils, and the wall thickness of Zircaloy tubes in the range of 20 to 40 mils. The instruments were designed for use with hand-held probes or with feeder-mounted probes to measure the inside and outside cladding thickness of tubular elements and the wall thickness of Zircaloy… more
Date: December 1961
Creator: Goodwin, Leslie E.
open access

Zircex Kinetics And Uranium Loss Study

Description: "A study was made of the effects of temperature, impurities in the hydrogen chloride, flow rates, and niobium content on both the reaction rates and insoluble uranium losses in the Zircex Process is presented."
Date: November 13, 1957
Creator: Carter, Jr, T. J. & Stone, R. A.
open access

Zircex Uranium Sublimate Loss

Description: "One of the limitations of the Zircex Process is the large percentage loss of U which is carried off with the volatile ZrCl/sub 4/. Since the ratio of U to Zr in the fuel element is quite small (< 1%), a large percentage of U loss can be caused by small amounts of U in the ZrCl/sub 4/ sublimate. The U loss must be kept below 1% if the Zircex Process is to be adapted to industrial scale processing."
Date: January 24, 1958
Creator: Jaworowski, T. R. & King, III, C. J.
open access

Zirconium-Hafnium Separation : Mixer-Settler Studies : Final Report

Description: Abstract: Use of the mixer-settler apparatus as a rapid means of determining improved conditions for plant operation is described including the experimental details. The preparation of highly purified samples of both zirconium oxide and hafnium oxide is discussed. (This document is concerned almost entirely with explorations of small scale continuous systems. Another document dealing with this general problem using small scale batch operations is being published simultaneously. It should prove … more
Date: November 17, 1955
Creator: Waldrop, F. B.; Ward, W. T. & Leaders, W. M.
open access

Zirconium Metal Fines Recovery: Interim Technical Report for May 15, 1950 to December 15, 1950

Description: This report covers the laboratory and pilot plant investigation of the reclamation of the low hafnium zirconium fines resulting from the manufacture of zirconium sponge and zirconium crystal bar. The process investigated involved recovery of the zirconium as zirconium tetrachloride, by drying the fines in an atmosphere of nitrogen and subsequent chlorination of the fines with anhydrous hydrogen chloride at temperatures above the sublimation point of the product.
Date: January 24, 1951
Creator: Ogburn, S. C., Jr. & Reader, L. J.
open access

Zirconium-Precipitation Pilot Plant

Description: This report follows an investigation with the objectives to improve the design of an existing pilot plant to allow better control of operating variables than was attained by previous investigators, and to determine the effect of leaching time on phthalate recovery.
Date: September 30, 1950
Creator: Parish, G. T.; Bakal, R.; Goodman, E. I. & Larsen, H. A.
Back to Top of Screen